7 CD&L Carolina Power & Light Company wem 85 0CT 31 kn 53 ROBINSON NUCLEAR
?R6JrLT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 OCT 2 81985 Robinson File No:
13520 Serial: RNPD/85-3875 Dr. J. N. Grace Regional Administrator United States Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30323 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 10CFR21 SEISMIC SUPPORTS
Dear Dr. Grace:
Carolina Power and Light-(CP&L) determined on October 25, 1985, that the event described in Licensee Event Report (LER) 85-06 is reportable per 10CFR21.
Seismic supports were declared inoperable based on the requirements of IE Bulletin 79-02.
LER-85-06, dated February 14, 1985, is considered to meet all the reporting requirements to the NRC per 10CFR21. Additional information on this event may be obtained from CP&L's March 14, 1985 response to the violation issued in Inspection Report 85-06.
This determination was delayed due to a parallel evaluation being conducted by the Architect Engineer involved in the event. A CP&L Corporate Officer has been nothied of this 10CFR21 determination.
If you should need any additional information, please contact Mr. J. M. Curley at 803-383-4524, extension 2367.
Very truly yours, R. E. M gan General Manager H. B. Robinson S. E. Plant CLW:ac cc:
J. M. Taylor (3) g1110300851028