Advises That Completion Date for Corrective Actions Re Violation from Insp Rept 50-413/85-05 Must Be Extended Due to Excessive Procedure Revs.Corrective Actions Will Be Completed by 851202
ML20134B005
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/30/1985
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8511110158
Download: ML20134B005 (1)


Text

DUKE POWER GOMPANY P.O. BOX 33189 CHARLOTTE, N.C. Sf*242 HAL B. TUGKER TELEPHONE veo.

marr (704) 073-4534 October 30, 1985

.m

- o.

Dr. J. - Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Re: RII:PHS/PKV 50-413/85-05

Dear Dr. Grace:

In our response of April 23, 1985 to Violation 413/85-05-02, it was stated that' corrective action would be complete by November 1, 1985.

Due to the large number of procedures that require revision, it is necessary to extend the completion date for this item. This work

-.will thus be completed by December 2, 1985.

Our interim corrective actions, as described in our initial response, will continue to ensure that no further violations of this kind will occur.

Very truly yours, 2W6 T~L

??

F2 Hal B. Tucker cn LTP: sib.

cc:

Mr. Jesse L. Riley 2

Carolina Environmental Study Group a

854 Henley Place Charlotte, North Carolina 28207 Robert Guild, Esq.

P. O. Box 12097 Charleston, South Carolina 19412 Palmetto Alliance 213515 Devine Street

. Columbia, South Carolina 29205 NRC Resident Inspector Catawba Nuclear Station 8511110158 851030 gDR ADOCK 05000413 PDR TE

  • l c

.