g#
%
UNITED STATES
p
?,
NUCLEAR REGULATORY COMMISSION
g
j
WASHINGTON, D C. 20555
=
e
k
o
g
August 13, 1985
Docket No. 50-312
Mr. R. J. Rodriquez
Assistant General Manager, Nuclear
Sacramento Municipal Utility District
6201 S Street
Post Office Box 15830
Sacramento, California 95813
Gentlemen:
SUBJECT:
INSPECTION NO. 50-312/85-14
Enclosed is the report of the special team inspection conducted by R. C.
Wilson and other NRC representatives on May 20-24, 1985, at the Rancho Seco
site of Sacramento Municipal Utility District of activities authorized by NRC
License No. DPR-54.
The team's findings were discussed with you and members
of your staff at the conclusion of the inspection. The inspection reviewed your
implementation of a program as required by 10 CFR 50.49 for establishing and
maintaining the qualification of electric equipment within the scope of 10 CFR 50.49.
The inspection also included evaluations of the implementation of
'
equipment qualification corrective action commitments made as a result of the
January 17, 1983 Safety Evaluation Report (SER) and the December 10, 1982
Franklin Research Center Technical Evaluation Report (TER). Within this area,
the inspection consisted of examinations of selected procedures and. records,
interviews with personnel, and observations by the inspectors.
The inspection determined that you have implemented a program to meet the
requirements of 10 CFR 50.49 and your corrective action commitments relative
to SER/TER deficiencies. The inspection identified three Open Items involving
documentation of Rockbestos cable qualification, procedures implementation, and
Limitorque operator T-drain removal. Your actions concerning these items will
be addressed in a future NRC inspection.
Full compliance with the requirements
of 10 CFR 50.49 is required for restart from the spring 1985 refueling outage,
and noncompliance after that time will result in enforcement action. Details of
the concerns are discussed in the enclosed inspection report.
I
s
0
12
F0r
^S PROOBSKING
g
Original document not available to GC
GeatifiedbdEAA4MME
a
--
. -
_ - -
-
.
Sacramento Municipal
Utility District
-2-
August 13, 1985
Your corrective actions regarding the identified Open Items should not be
delayed pending a future NRC inspection or further action by the NRC Region V
office.
We are available to discuss any questions you have concerning this inspection.
Sincerely,
'
A
'
Gary G.
ech,
hief
Vendor Program Branch
Division of Quality Assurance, Vendor
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosure:
Inspection Report No. 50-312/85-14
4
l
/
,.
, . - . - . _
- . _ .
_
- - . . . - , -
.
.
Sacramento Municipal Utility District
August 13, 1985
DISJAlBUTION:
@
PDR -
VPB Reading
-DQAVT Reading
JTaylor
RVollmer
BGrimes
UPotapovs
GHubbard
RWilson
GHolahan,ORAB/NRR
.RLaGrange,EQB/NRR
PShemanski,EQB/NRR
RKarsch,ORAB/NRR
SMiner, DL/NRR
RBorgen, Idaho National Engineering Laboratory
PBennett, Sandia National Laboratories
JBurdoin, RV
GPerez, Rancho Seco Resident, U.S.N.R.C.
14410 Twin Cities Road
Herald, CA 95638
.TYoung, JR., RV
JThomas, DPC
&
y ()
VDA
h
Y'
'VPB:UQAVT
SC/VP3:DQAVT
BC/0RAB:NRR
ABC/EQ
RV
Wilson: sam
UPotapovs
GHolahan
RLaGrange
TYoung, Jr.
.
7ggjg
7/)$85
7/ 31/85
7/3l/85
7/t/85
'
C/VPB:DQAVT
- A
R:0
Zech
s-
'J
or
/7 /85
/ f/85
7
85