ML20134A595
| ML20134A595 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/22/1985 |
| From: | Butcher E Office of Nuclear Reactor Regulation |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20134A597 | List: |
| References | |
| GL-83-28, NUDOCS 8511070420 | |
| Download: ML20134A595 (2) | |
Text
.
October 22, 1985 DISTRIBUTION:
DOCKET FILE T. Bournia Docket Nos. 50-266 NRC PDR D. Shum and 50-301 L POR ORB #3 Rdg HThompson OELD Mr. C. W. Fay, Vice President EJordan Nuclear Power Department BGrimes Wisconsin Electric Power Company JPartlow 231 West Michigan Street, Room 308 TColburn Milwaukee, Wisconsin 53201 PMKreutzer ACRS +10
Dear Mr. Fay:
Gray File
SUBJECT:
GENERIC LETTER 83-28, ITEM 1.1 POST-TRIP REVIEW PROGRAM DESCRIPTION AND PROCEDURE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 We have completed our review of your November 7,1983 response to Generic Letter 83-28 and your September 10, 1985 response to our July 29, 1985 request for additional information on the subject item. Based on our review, the staff finds that your responses adequately address our concerns regarding Item 1.1 " Post-Trip Review" (Program Description and Procedures) for the Point Beach Nuclear Plant, Units 1 and 2, therefore, the staff con-siders this item complete for your facilities. The details of our review are contained in the enclosed Safety Evaluation.
If you have any questions, please contact Mr. T. Colburn at (301) 492-4709.
Sincerely,
/s/
Edward J. Butcher, Acting Chief Operating Reactors Branch #3 Division of Licensing
Enclosure:
As stated cc w/ enclosure See next page lid"T8m gg W
@PKrrutzer TColburn:dd
- cher
\\ 10/js/85 10/ 2 /85 10/2l /85
Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 cc:
Mr. Bruce Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, DC 20036 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Twc Rivers Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farus State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road i
Two Rivers, Wisconsin 54241 l
1 t
0 m
---