MONTHYEARML20216E4791999-09-0909 September 1999 Proposed Tech Specs Revising Allowable Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons ML20216E4631999-09-0909 September 1999 Proposed Tech Specs Change Eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula,Since Corbicula & Zebra Mussels Have Already Been Identified & Control & Treatment Plans Are Implemented ML20211P2871999-09-0909 September 1999 Proposed Tech Specs Pages,Increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal ML20210M7851999-08-0404 August 1999 Proposed Tech Specs 3.9.1,incorporating Addl Option Into Required Actions When Refueling Interlocks Are Inoperable ML20209B3391999-06-28028 June 1999 Simulator Four Yr Test Rept ML20196A2021999-06-17017 June 1999 Proposed Tech Specs SRs Implementing 24-month Operating Cycle at Pnpp ML20205C6351999-03-16016 March 1999 Preliminary Rev 0 to Wps 01-43-T-801, Preliminary Weld Procedure for Perry Nuclear Power Plant Feedwater Nozzle Repair ML20204E4971999-03-15015 March 1999 Proposed Tech Specs,Correcting Typos Found in Table 3.3.6.1-1 ML20207K1041999-03-0404 March 1999 Proposed Tech Specs Improving Licensing & Design Basis for Isolation of FW Penetrations ML20206Q3571999-01-0606 January 1999 Proposed Tech Specs Improving Licensing & Design Basis for Isolation of Feedwater Penetrations ML20195H5381998-11-18018 November 1998 Rev 4 to Pump & Valve Inservice Testing Program Plan ML20155D9431998-10-27027 October 1998 Proposed Tech Specs 2.1.1.2,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by GE ML20155D8241998-10-27027 October 1998 Proposed Tech Specs Adding Two Paragraphs to TS 5.2.2.e, Organization - Unit Staff ML20196H5131998-10-0808 October 1998 Rev 4,Vol 1 to Inservice Exam Program for Perry Nuclear Power Plant ML20151V4831998-09-0909 September 1998 Proposed Tech Specs Stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Check Valves Do Not Need to Be Included in Hydrostatic Program ML20151V1111998-09-0303 September 1998 Proposed Tech Specs Permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allowing Performance of EDG 24-hour TS SR Test in Modes 1 & 2 ML20151V6861998-09-0303 September 1998 Proposed Tech Specs Increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Volume Due to Vortex Formation at Eductor Nozzles Located in Fuel Oil Storage Tank PY-CEI-NRR-2395, Rev 5 to Perry NPP Odcm. with1998-09-0202 September 1998 Rev 5 to Perry NPP Odcm. with ML20151S9561998-08-31031 August 1998 Proposed Tech Specs,Allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable ML20236T7911998-07-22022 July 1998 Proposed Tech Specs Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys ML20151P1921998-07-13013 July 1998 Proposed Tech Specs,Increasing Present +/- 1% Tolerance on Safety Mode Lift Setpoint for SRVs to +/- 3% ML20236H8411998-06-30030 June 1998 Proposed Tech Specs,Increasing Boron Concentration in Standby Liquid Control Sys for Pnpp Cycle 8 Fuel Design & Providing Margin for Future Cycles as Required ML20236T8451998-06-24024 June 1998 Rev 3,Change 3 to Vol 1 of Inservice Examination Program, for Pnpp ML20216H9361998-04-14014 April 1998 Rev 1 to Proposed TS Bases,Reflecting Changes Made Since Original Implementation of TS in Improved Format in June 1996 ML20203G4781998-02-23023 February 1998 Maint Progress Review for Perry Nuclear Power Plant ML20197F7871997-12-23023 December 1997 Proposed Tech Specs,Revising 3.8.1 Re AC Sources to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs ML20217K6501997-10-22022 October 1997 Proposed Tech Specs Incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchanger ML20217F5911997-10-0202 October 1997 Proposed Tech Specs,Adding Note to TS 2.1.1.2 Re MCPR SL Values & Adding Footnote to TS 5.6.5.b to Reference NRC SER That Approved MCPR SL Values for Cycle 7 ML20210T9631997-09-0808 September 1997 Proposed Tech Specs 5.2.2.e,removing Reference to NRC Policy Statement on Working Hours.Rev Allows Changes to Specific Overtime Limits & Working Hours to Be Evaluated IAW 10CFR50.59, Changes,Tests & Experiments ML20210U8701997-09-0808 September 1997 Rev 3,change 2 to Vol 1 of Inservice Exam Program, for Pnpp ML20217Q4591997-08-28028 August 1997 Proposed Tech Specs 3.4.11,revising Pressure-Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20148A6871997-05-0202 May 1997 Proposed Tech Specs Re Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria ML20148A6591997-05-0202 May 1997 Proposed Tech Specs,Revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys ML20137S7761997-04-0909 April 1997 Proposed TS Requirements 3.9.1.1 & 3.9.2.2 Re Frequency on Refueling Equipment & one-rod-out Interlocks ML20134D8251997-01-31031 January 1997 Proposed Tech Specs 1.1 Re definitions,3.6.1.1 Re Primary Containment - operating,3.6.1.2 Re Primary Containment Air locks,3.6.1.3 Re PCIVs,3.6.5.1 Re Drywell & 5.5 Re Programs & Manuals ML20147B8271997-01-24024 January 1997 Rev 3 to Vol 1 of Inservice Exam Program ML20134D8751996-10-24024 October 1996 Proposed Tech Specs 2.1.1.2,safety Limits Applying Conservatism by Increasing MCPR Safety Limit Values ML20117E7891996-08-27027 August 1996 Proposed Tech Specs,Revising Mls Leakage Requirements & Eliminating MSIV Control Sys ML20108A2581996-04-26026 April 1996 Proposed Improved Tech Specs ML20100N9501996-03-0101 March 1996 Proposed TS Pages Re Drywell Leak Rate Testing Requirements ML20100L3331996-02-27027 February 1996 Proposed Tech Specs Re Drywell Personnel Air Lock Shield Door Analyses ML20100J5971996-02-24024 February 1996 Proposed Tech Specs,Revising Definition of Core Alteration ML20149K2221996-02-17017 February 1996 Proposed Tech Specs,Reflecting Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 ML20100G0161996-02-0101 February 1996 Draft Rev 0 to Pnpp NUMARC/NESP-007 Plant-Specific EAL Guidelines ML20096D4651996-01-16016 January 1996 Proposed TS Requirements for Drywell Leak Rate Testing ML20096C0591996-01-10010 January 1996 Proposed Tech Specs,Requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095H4721995-12-20020 December 1995 Proposed Tech Specs Re Replacement of Selected Analog Leak Detection Sys Instruments W/Ge Numac Leak Detection Monitor ML20108B2851995-11-22022 November 1995 Rev 5 to Offsite Dose Calculation Manual ML20094F2051995-11-0202 November 1995 Proposed Tech Specs for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Performing Core Alterations ML20094E6751995-11-0202 November 1995 Proposed Tech Spec,Requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operation 1999-09-09
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20205C6351999-03-16016 March 1999 Preliminary Rev 0 to Wps 01-43-T-801, Preliminary Weld Procedure for Perry Nuclear Power Plant Feedwater Nozzle Repair ML20195H5381998-11-18018 November 1998 Rev 4 to Pump & Valve Inservice Testing Program Plan ML20196H5131998-10-0808 October 1998 Rev 4,Vol 1 to Inservice Exam Program for Perry Nuclear Power Plant PY-CEI-NRR-2395, Rev 5 to Perry NPP Odcm. with1998-09-0202 September 1998 Rev 5 to Perry NPP Odcm. with ML20236T8451998-06-24024 June 1998 Rev 3,Change 3 to Vol 1 of Inservice Examination Program, for Pnpp ML20203G4781998-02-23023 February 1998 Maint Progress Review for Perry Nuclear Power Plant ML20210U8701997-09-0808 September 1997 Rev 3,change 2 to Vol 1 of Inservice Exam Program, for Pnpp ML20147B8271997-01-24024 January 1997 Rev 3 to Vol 1 of Inservice Exam Program ML20100G0161996-02-0101 February 1996 Draft Rev 0 to Pnpp NUMARC/NESP-007 Plant-Specific EAL Guidelines ML20108B2851995-11-22022 November 1995 Rev 5 to Offsite Dose Calculation Manual ML20087D7971995-07-0707 July 1995 Vol 1 to Rev 3, Perry Nuclear Power Plant Inservice Exam Program ML20082C2751995-03-29029 March 1995 Rev 5 to Odcm ML20082C2771995-03-29029 March 1995 Rev 6 to Process Control Program ML20108B2821995-03-29029 March 1995 Rev 6 to Process Control Program ML20085A0501995-02-0707 February 1995 Rev 2 to ISI Exam Program ML20083A8611994-10-20020 October 1994 Rev 2 to Plant Administrative Procedure PAP-0806, Oil/ Chemical Release Contingency Plan ML20101B7951994-10-14014 October 1994 Partially Withheld Rev 19 to Security Plan PY-CEI-NRR-1827, Revised Emergency Public Info Organization Implementing Instruction Manual Including,Temporary Change Number,(Tcn) TCN-1 to Rev 10 to Instruction 1,TCN-2 to Rev 20 to App B & TCN-4 to Rev 0 to App I-B1994-07-18018 July 1994 Revised Emergency Public Info Organization Implementing Instruction Manual Including,Temporary Change Number,(Tcn) TCN-1 to Rev 10 to Instruction 1,TCN-2 to Rev 20 to App B & TCN-4 to Rev 0 to App I-B ML20065E9341994-04-0505 April 1994 Rev 3 to Pump & Valve IST Program Plan ML20101B7841994-04-0101 April 1994 Partially Withheld Rev 18 to Security Plan ML20063K7171994-01-17017 January 1994 Rev 2,Temporary Change 1 to Vol 1 of Inservice Exam Program PY-CEI-NRR-1741, Changes to Emergency Public Info Organization...Instruction Manual, Including Rev 20 to JPC-App B,Temporary Change 2 to Rev 9 to Instruction 9 & Temporary Change 2 to Rev 8 to Instruction 81994-01-13013 January 1994 Changes to Emergency Public Info Organization...Instruction Manual, Including Rev 20 to JPC-App B,Temporary Change 2 to Rev 9 to Instruction 9 & Temporary Change 2 to Rev 8 to Instruction 8 PY-CEI-NRR-1736, Temporary Change 1 to Rev 0 to App H of Emergency Public Info Organization Instructions Manual1993-12-20020 December 1993 Temporary Change 1 to Rev 0 to App H of Emergency Public Info Organization Instructions Manual ML20063L1501993-12-16016 December 1993 Rev 1,to Industrial Radiography Program PY-CEI-NRR-1715, Temporary Change 3 to Rev 1 to Emergency Public Info Organization Instructions Manual1993-10-26026 October 1993 Temporary Change 3 to Rev 1 to Emergency Public Info Organization Instructions Manual ML20058N3951993-10-11011 October 1993 Inservice Examination Program, Rev 2 ML20045J2511993-07-15015 July 1993 Revised Emergency Public Info Organization Implementing Instruction Manual,Including Temporary Change (TC) 2 to Rev 1 of App D,Tc 2 to Rev 0 of App I,Part A,Pages 1-2 & 3-4 & TC 3 to Rev 0 of App I,Part B,Page 19-20.W/930715 Ltr ML20045D4011993-06-16016 June 1993 Revised Emergency Public Info Organization Implementing Instruction Manual,Including Temporary Change Number (Tcn) TCN-1 to Rev 8 to Section II,TCN-1 to Rev 1 to Section IV & TCN-1 to Rev 8 Instruction 5.W/930616 Ltr ML20138D1831993-01-14014 January 1993 Rev 2 to Perry Operations Manual,Inservice Exam Program ML20101B7811992-11-20020 November 1992 Partially Withheld Rev 17 to Security Plan ML20118A8331992-09-22022 September 1992 Revised Emergency Public Info Organization Implementing Instructions Manual,Including Rev 17 to JPC-App-B,Rev 9 to JPC-Instruction 1,TC-1 to JPC-Instruction 2 & Rev 8 to JPC-Instruction 3 ML20045B3441992-07-31031 July 1992 Temporary Change 1 to Rev 1 to Perry Operation Manual OM1A:PAP-0806, Oil/Chemical Release Contingency Plan. ML20101B7871992-04-27027 April 1992 Partially Withheld Rev 17 to Security Plan PY-CEI-NRR-1445, Rev 15 to Emergency Public Info Organization Instructions Manual App B, Personnel/Access List1992-02-12012 February 1992 Rev 15 to Emergency Public Info Organization Instructions Manual App B, Personnel/Access List ML20044G8151992-01-10010 January 1992 Rev 1 to Perry Operations Manual OM1A:PAP-0806, Oil/ Chemical Release Contingency Plan. ML20091K4861992-01-0303 January 1992 Rev 1 to Inservice Exam Program ML20082P8911991-09-0404 September 1991 Rev 0 to Temporary Instruction TXI-0122, Zebra Mussel Treatment PY-CEI-NRR-1366, Apps B & D to Emergency Public Info Organization Instructions Manual1991-06-14014 June 1991 Apps B & D to Emergency Public Info Organization Instructions Manual ML20029B1571991-02-27027 February 1991 Revised Emergency Public Info Organization Instructions Manual. W/910227 Ltr ML20077J9691990-12-31031 December 1990 Rev 3 to Pump & Valve Inservice Testing Program Plan ML20028H7581990-12-26026 December 1990 Emergency Public Info Organization Instructions Manual,App B, Personnel/Access Lists. W/910124 Ltr ML20058E8041990-10-17017 October 1990 Instruction I to Rev 8 to Emergency Public Info Organization Instructions Manual, Manual Distribution ML20058E8131990-10-17017 October 1990 Instruction II to Rev 8 to Emergency Public Info Organization Instructions Manual, Purpose,Scope,Company Policy,Responsibilities & Refs PY-CEI-NRR-1223, Rev 11 to Emergency Public Info Organization Implementing Instruction Manual,App B, Personnel/Access Lists1990-09-10010 September 1990 Rev 11 to Emergency Public Info Organization Implementing Instruction Manual,App B, Personnel/Access Lists ML20058L1721990-05-30030 May 1990 Rev 0 to Inservice Exam Program ML20043A6501990-05-14014 May 1990 Revised Emergency Public Info Organization Implementing Instructions Manual. W/900514 Ltr ML20248H2481989-10-0202 October 1989 Rev 2 to Pump & Valve Inservice Testing Program Plan ML20246K8101989-08-14014 August 1989 Temporary Change Notice 6 to Rev 3 to OM12D:ODCM, Odcm ML20246K8021989-02-25025 February 1989 Temporary Change Notice 5 to Rev 3 to OM12D:ODCM, Odcm ML20101B7911989-01-16016 January 1989 Partially Withheld Rev 12 to Security Plan 1999-03-16
[Table view] |
Text
PGP
, o Pag::: 222 Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 97 EPG Step Number (s): SP/L-1 PSTG Step Number (s): SP/L-1 Deviation:
Sentence " Suppression pool makeup may be augmented by SPMU" was included.
Evaluator: R. A. Stratman Date: 4/22/85 Justification:
Perry design incorporates a suppression pool makeup system. Hence, the inclusion is warranted.
Reviewer: r v Date:'/9[' f f '
/
Approved: YES NO (circle one)
NDAS Lead Engineer: Date:
Approved: NO (circle one)
GSO: h,1 ddh Date: tf M /0~
Incorporated: 2 </dfff7 Date: f/ I z-8511040406 851029 PDR ADOCK 05000440 E PDR
.a
PGP
-e' Page: 224 Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 99
~
EPG Step Number (s): SP/L PSTG Step Number (s): SP/L-2
' Deviation:
Perry specific curve for Heat Capacity Level Limit used in place of EPG curve.
Evaluator: R. A. Stratman Date: 4/22/85 Justification:
Reference Perry specific-calculation 11016-15, Rev. O.
Reviewer: hb J
mnh Date: 9((!T8
. Approved:. YES NO ffN/R (circle one) i '
NDAS Lead Engineer: A Date: 9-f -#U' Approved:
@ NO (circle one)
GSO: 0.I, Md Date: 4MN Incorporated: </[/,
/ 1
//<t/N% Date:
7y
i PGP
. . Page: 223 Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines
' Deviation Sheet: Number 98
- 4 EPG Step Number (s): SP/L-1; SP/L-3 PSTG Step Number (s): SP/L-1; SP/L-3 Deviation:
- Perry specific value for suppression pool level following SPMU initiation has been used' in place of . EPG value.
+
Evaluator: R. A. Stratman Date: 4/22/85 4
' Justification:
Reference Perry specific calculation 11016-28, Rev. 1.
t 4
Reviewer:
/
- 4 Date: Tf7!TI
~/
Approved: S NO(f N/R (circle one)
NDAS Lead Engineer: ((. 4 Date: f*N6 Approved: h NO (circle one) ,
GSO: h.; Md Date: 9 M MI
- Incorporated:
f ,
[ d !5 ftS-,. ; Date: [ v' i
PGP
,_ ,- P2gn: 225 R v.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines
- r Deviation Sheet: Number 100 EPG Step Number (s): SP/L-3.2
, PSTG Step Number (s): SP/L-3.2
-, Deviation:
Perry specific value for Maximum Primary Containment Water Level Limit
!' used in place of EPG value.
b Evaluator: R. A. Stratman Date: 4/22/85 Justification:
Reference Design Specification 660, Revision 7, 5/2/d3.
Reviewer: b j snc Date: 797[
Approved:
r>N/R <
YES NO (circle one)
NDAS Lead Engineer: /L Date: f- 9-/J' Approved: NO (circle one)
GSO: 8,a .dd/1 Date: 1 ADI M Incorporated:
/
f'
(( % Date: f!9/' f_7~~
//
l
PGP Pega: 226 R v.: 1 Attachment 7 - (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 101 EPG Step Number (s): Secondary Containment Control Guideline PSTG Step Number (s): N/A Deviation:
EPG " Secondary Containment Control Guidelines" was removed.
Evaluator: R. A. Stratman Date: 4/22/85 Justification:
The Perry secondary containment design does not require a separate guide-line.
~
Reviewer: ; [ffrfm ; Date: ,/((-O t.. , ..
Approved: YES NO (circle one)-
NDAS Imad Engineer: Date:
Approved: h NO (circle one)
GSO: 0_ l e $1, L Date: 6 J2/' eft Incorporated: 4, $ge[fu Date: [
PGP Pagina 227 Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 102
~ EPG Step Number (s): Radioactivity Release Control Guideline - Entry Con-dition; RR-2 PSTG Step Number (s): Radioactivity Release Control Guideline - Entry Con-dition; RR-2
. Deviation:
PSTG does not provide a specific value (in Ci/sec.) for the release rate
.. which requires a specific Emergency Plan classification.
Evaluator: R. A. Stratman Date: 4/22/85 Justification:
The Emergency Plan at Perry specifies several different release rates which would result in Alert or General Emergency classifications. Hence, listing only one of these could be possible misleading.
v Reviewer: /[g [w fps Date: r/ / F Approved: YES NO (circle one)
NDAS Lead Engineer: Date:
Approved: NO (circle one)
CSO: 0.1Msb Date: f Jg M Incorporated:
/ ' /
bm - Date: /
/ /
f
PGP Pagn 228 s a Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 103 EPG Step Number (s): Cl-2 PSTG Step Number (s): Cl-1 Deviation:
" Condensate" was changed to " Condensate /feedwater".
Evaluator: R. A. Stratman Date: 4/22/85 Justification:
Provide consistency with other steps where condensate and feedwater systems are molded into one system.
Reviewer: p e Date: 9
/ ' /
//
Approved: YES NO Mv (circle one)
NDAS Lead Engineer: Date:
Approved: NO (circle one)
GSO: 0.0 A $uh Date: { Eh c)F Incorporated:
/
o ' Id X/rfd Date: #
//
!W l
L
PGP Pagn: 229 Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 103a EPG Step Number (s): Box preceding step Cl-1 PSTG Step Number (s): Box preceding step Cl-1 Deviation:
The phrase " Boron Injection is required or boron has been injected into the RPV" has been deleted, and the phrase "Any control rod is not in-serted to or beyond position 02 (Maximum Suberitical Banked Withdrawal Position)" has been added.
Evaluator: R. A. Stratman Date: 4/22/85 Justification:
The guidelines are now organized to provide the correct direction for control of RPV water level for any ATWS whether or not boron has been in-jected. This guidance is provided in Contingency 7.
Reviewer:
' I
[7X/rA , Date: </[//
/' /'/
Approved: .YES NO (circle one)
NDAS Lead Engineer: Date:
Approved: NO (circle one)
GSO: [.1, 8d/U Date: 4h8 Incorporated:
~
M4 , s flaf% / Date:
,/ ,/ 7
PGP Page: 230
-Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 104 EPG Step Number (s): Cl-2 PSTG Step Number (s): Cl-1 Deviation:
Reference to LPCS A and LPCS B was changed to LPCS.
Evaluator: R. A. Stratman Date: 4/22/85 Justification:
Perry design utilizes only one LPCS train.
r Reviewer:
/.
f<
r f/retA_ - Date: /ir [
Approved: YES NO (circle one)
NDAS Imad Engineer: Date:
Approved:-
h NO (circle one)
G30: h.l Si{ Date: f M n/C Incorporated:
- -If , h
[fflff7 d Date: #
y,
s 1
y.
PGP Paga: 231 Rev.: 1
' Attachment 7 (Cont.) . 1 Deviations from the Generic Guidelines Deviation Sheet: Number' 105 EPG Step Number (s): Cl-2; C6-2.2; C6-3.1; C6-4; C7-2.2 PSTG Step Number (s): Cl-1; C6-1.3; C6-3.1; C6-4.1; C7-2.2 Deviation: ;
List of alternate injection subsystems revised to reflect Perry design.
Evaluator: R. A. Stratman Date: 4/22/85
. Justification:
Evaluation of system capabilities indicates these systems can be used to-provide alternate means of injecting water into the RPV.
L Reviewer: '
de Date: 4. T8 Approved: ES NO f l N/R (circle one)
NDAS Imad Engineer: Y (( d Date: f-f/J-Approved: @ NO (circle one)
GSO: k,M ddk Date: 4dd dr Incorporated:
r.
!w Date: /f
//
I
PGP Page: 232 Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 106 P
EPG Step Number (s): " Box" preceding Cl-4 PSTG Step Number (s): " Box" preceding Cl-2 Deviation:
Location of " box" changed.
~
Evaluator: R. A. Stratman Date: 4/22/85 Justification:
Relocation of the " box" improved the guidelines from a human factor stand point. In its previous position it could easily be missed if the operator had to loop back to step Cl-2 (which is likely to occur) .
Reviewe r: ~
, uk Date: 'f!$'!sg Approved:
}' f) / I YE N0 N/R (circle one)
NDAS Lead Engineer: A Date: f- /s-/S-Approved: NO (circle one)
GSO: 0.y dgjfsp$,, Date: 4 drM- JT Incorporated:
/ [4 , Y of U Date:
,9/',f' F[
PGP Page: 233 Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 107 EPG Step Number (s): " Box" preceding Cl-4 PSTG Step Number (s): " Box" preceding Cl-2 Deviation:
Perry specific value for ADS initiation setpoint used in place of EPG value.
Evaluator: R. A. Stratman Date: 4/22/85 d
Justification:
Reference draf t Technical Specification Table 3.3.3-2.
+-
i.
Reviewe r. h; wmd Date: 9 (!qg Approved: .) NO ffN/R f I YES (circle one)
NDAS 14ad Engineer [M ., M Date: f-4W Approved: h NO (circle one)
GSO: f.1L Mf jl u/ . Date: J 2AM e rs-Incorporated: / r ddfua'V Date: _ f'
//
[
--- - - - ~ , , - , ,~.-.w,m_, y,.._,% . , . , _ _ , , , , , . , . _ , , , , _ . . , . __,,~.__,,,-y,.._,.__._,._.,.._,,_..,,.,,..,_,_,,y%_~7,, .- , , , - . _..,__y,_
l PGP Pega: 234
~*
Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 108 EPG Step Number (s): Cl-3 PSTG Step Number (s): Cl-2 ,
Deviation:
Perry specific value for division between the " Intermediate" and "High" pressitre regions used in place of EPG value.
Evaluator: R. A. Stratman Date: 4/22/85 Justification:
Reference GE design specification data sheets 22A3125AM, Rev. 2. Section 4.1.2.b for LPCS 22A3139AM, Rev. 7, for LPCI. These are preliminary
, values and may be revised based on results of vie-operational testing.
Note also Deviation Sheets 40 and 41.
Reviewer: be a r, , Date: 1 [
Approved: YES NO N/R (circle one)
NDAS Lead Engineer: [I A Date: f- 98 Approved: h NO (circle one)
GSO: [1.kh Date: i gId df Incorporated:
Mt. ..
[W se Date: '/,/, [
e
PGP Pags: 235 Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 109 EPG Step Number (s): Cl-3 PSTG Step Number (s): C1-2 Deviation:
None Evaluator: R. A. Stratman Date: 4/22/85 Justification:
Previous deviation 109 has been deleted. The setpoint between the High and Intermediate pressure systems should be the LPCS shutoff head as stated in the EPG.
Reviewers
/
/ /
fv Date: 9/f f Approved: YES NO N/R (circle one)
NDAS IAad Engineer: Date Approved: h NO (circle one)
GSO: k.d M Date: _ ( fdoPo' Incorporated: , s Date: 7/h 7
/ / / '
I l
1 L 1
PGP
.. . Page: 236 Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 110
?
EPG Step Number (s): Cl-5; Cl-7 PSTG Step Number (s): Cl-4; C1-6 Deviation:
None Evaluator: R. A. Stratman Date: 4/22/85 Justification:
Previous deviation 110 has been deleted. With respect to the actions specified in Contingency 1, HPCS should not be treated as a HPCI system.
HPCS is not steam driven which is the important consideration in Contin-gency 1.
Reviewer: 4
<v- -
[_ ~ Date: 7 r /
f f
Approved: YES NO Q/ (circle one)
NDAS Lead Engineer: Date:
Approved:
h NO (circle one)
GSO: k d , M///v Date: t,1//r Incorporated: /I, Date: '7' f
/ f O
PGP
,- . Page: 237 Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 110a EPG Step Number (s): Cl-7 PSTG Step Number (s): Cl-6 Deviation:
CRD has been added to this step.
Evaluator: R. A. Stratman Date: 4/22/85 Justification:
CRD is a high pressure system which may not be operating. It is appro-priate to restart this system at this point.
Reviewer: '
/ _ Date: */ // [
/ 'l / 'l Approved: YES NO (circle one)
NDAS Imad Engineer: Date:
Approved:
h NO (circle one)
GSO: [.i Md Date: (, E_ M Incorporated: / Date:
,9 ,/ES-'
- , - _ --, - .- y_,, .-.. - _ _ . _ _ , , . . , , - - - , - , , -- . .- -
PGP Page: 238
, Rev.: 1 Attachment 7 (Cont.)
Deviations from the Generic Guidelines Deviation Sheet: Number 111 EPG Step Number (s): Cl-8 PS~tG Step Number (s): Cl-7 Deviation:
"If no HPCS or LPCS subsystem is operating" was included in the ins +. rue-tion.
Evaluator: R. A. Stratman Date: 4/22/85 Justification:
Incorporation of the phrase provides consistency with Contingency 4.
Reviewer: , t, , ---[ fr[m ; Date: ,7//, I Approved: YES NO (circle one)
NDAS 1Aad Enginet.r: Date:
Approved: h NO (circle one)
Gso: 2.L dL$aL Date: C, 4d als-Incorporated:
/ . ..
9/t w Datesf,-[C