ML20134A112

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-30,revising Tech Specs to Delete Requirement That 18-month Fire Pump Diesel Engine Insp Be Performed During Shutdown.Fee Paid
Date released: 05/27/2020 Download: ML20134A112


Proposed Tech Spec,Deleting Requirement That 18-month Fire Pump Diesel Insp Be Performed During Shutdown.Safety Evaluation Encl
ML20134A122
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/13/1985
From:
UNION ELECTRIC CO.
To:
References
Download: ML20134A122 (2)
Application for Amend to License NPF-30,revising Tech Specs to Delete Requirement That 18-month Fire Pump Diesel Engine Insp Be Performed During Shutdown.Fee Paid
ML20134A109
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/13/1985
From: Schnell D
UNION ELECTRIC CO.
To: DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML20134A109 (3)