ML20134A059

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-423/85-56 on 850930-1004.No Violation Noted.Areas Requiring Followup Effort Noted
ML20134A059
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/29/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20134A061 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8511040126
Download: ML20134A059 (2)


See also: IR 05000423/1985056

Text

-

I

i'

'

OCT 2 9 $85

Docket No.- 50-423 License No. CPPR-113

Northeast Nuclear Energy Comrany

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Inspection Report No. 50-423/85-56

On September 30 - October 4, 1985, a routine inspection was performed by

Mr. J. R. White and Ms. J. A. Cioffi of our office for the purpose of review-

ing the preoperational status of Millstone Nuclear Generating Station, Unit 3,

with respect to areas affecting solid radioactive waste and the status of your

implementation of the task items identified in NUREG-0737. Additional effort

was expended in determining your actions with respect to IE bulletins and cir-

culars~and previously identified concerns. An inspection report detailing

these findings is attached.

Within the scope of this inspection, no violations of NRC requirements were

identified, however, several areas requiring followup effort were noted. These

areas will be re-examined in subsequent inspections of your activities.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Ori inal 31sned Byr

Thomas T. Martin, D ctor

Division of Radiatio Safety

and Safeguards

Enclosure: NRC Region I Inspection Report No. 50-423/85-56

kk

G

h [

0FFICIAL RECORD COPY IR MILL 3 85-56 - 0001.0.0

10/29/85

i

..

.

,

.

Northeast' Nuclear Energy Company .2

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

.D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D.~ Romberg,-Station Superintendent

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

-State of Connecticut i

bec w/ encl:

Region I Docket Room (with concurrences)

-Management Assistant, DRMA (w/o enc 1)

DRP Section Chief.

G. Walton, SRI, BV-2

T. Shediosky, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

RI:DRS RI:DRSS RI:DRSS :DRSS RI:DRSS

White / Cioff Sh

g g Martin

10/y/85 10 /85 10/2 / 85 10/2f/85 10/ /85

0FFICIAL RECORD COPY IR MILL 3 85-56 - 0002.0.0

10/29/85

-

_