ML20134A016

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 99900081/85-01 on 850708-12 & Notice of Nonconformance
ML20134A016
Person / Time
Issue date: 10/31/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Volmer C
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML20134A018 List:
References
REF-QA-99900081 NUDOCS 8511040045
Download: ML20134A016 (2)


Text

I-

/ o,, UNITED STATES

8. o NUCLEAR REGULATORY COMMISSION -

g E WASHINGTON D. C. 20555

\,,,,,} October 31, 1985 Docket No. 99900081/85-01 Exxon Nuclear Company Nuclear Fuels Department ATTN: Mr. C. J. Volmer, QA Manager 2101 Horn Rapids Road Richland, Washington 99352 Gentlemen:

This refers to the inspection conducted by Mr. R. L. Pettis, Jr. of this office on July 8-12, 1985, of your facility in Richland, Washington and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.

This inspection was made as a result of a request from the NRC's Office of Nuclear Reactor Regulation that the Vendor Program Branch determine the adequacy of Exxon's QA program relative to recent ECCS Computer Code errors reported to the NRC. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection ,

consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. Tha most significant of these were in the area of Computer Code verification, maintenance, and error report handling. The specific findings and references to the pertinent requirements are identified in the enclosures *to this letter.

Please provide us within 30 days from the date of this letter a written statement containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.

l The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required' by the Paperwork Reduction Act of 1980, PL 96-511.

l l

a pu2inninnh 99900001

///i 7y i

i 9

f' Exxon. Nuclear Company October 31, 1985 In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public l

Document Room.

-Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, ORIGINAL SIGNED BY:

GARY G. ZECH Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement-

Enclosures:

1. Appendix A-Notice of Nonconformance
2. Appendix B-Inspection Report 99900081/85-01
3. Appendix C-Inspection Data Sheets (12 pages)

DISTRIBUTION:

wSRB: IE:09 VPB Reading DQAVT Reading RVollmer-JTCollins JStone JWCraig

'RPettis 0Gormley JHarper WShier, BNL Region V CWalenga

  • see previous page for concurrence.

VP8:DQAVT* SC/VPB:0QAVT* B /V 8:DQAVT DI .

RPettis: sam JWCraig GGZech BKC mes 10/11/85 10/12/85 10/ /85 10/ y85