ML20133Q386
ML20133Q386 | |
Person / Time | |
---|---|
Site: | Peach Bottom, Surry, 05000000 |
Issue date: | 07/10/1985 |
From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
To: | Sholly S UNION OF CONCERNED SCIENTISTS |
Shared Package | |
ML20133Q389 | List: |
References | |
FOIA-85-447, RTR-NUREG-0956, RTR-NUREG-956 NUDOCS 8508150117 | |
Download: ML20133Q386 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999
[Table view]Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) 1999-09-09 Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA MONTHYEARIA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989
[Table view]Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245B3881989-06-15015 June 1989 Responds to Re Flow & Pressure Drop Calculations for RWCU & Feedwater & Condensate Sample Panels.Util Actions Do Not Have Adverse Impact on Nuclear Reactor Safety to Extent That Protection of Safety of Environ Affected ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20245B4051989-04-14014 April 1989 Responds to 881004 & 890119,23 & 0310 Ltrs Re Status of Investigation of Concerns About Corrosion Inhibitors & Design of Sampling Sys.Low Velocity of Liquid in Hotwell Sampling Considered Satisfactory ML20247A1031989-03-20020 March 1989 Responds to Js Ewing Expressing Opposition to Restart of Plant.Bases Provided in Support of Opposition Are Related to Recent NRC Recommendations for Mark I Containment Improvements & Concern Over Radwaste Disposal ML20246N1521989-02-22022 February 1989 Responds to Re Amended Indemnity Agreement W/ Utils to Permit Storage of Spent Nuclear Fuel.Fr Notice Encl ML20206D9201988-11-0909 November 1988 Responds to Re NRC 880331 Response to Questions Raised Concerning Conditions at Plants & Recipient Proposal to Station Senior Operator in Control Room at All Nuclear Plants to Oversee Plant Operations ML20195G5361988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App a Documents.App a Documents Also Available in PDR ML20195G2121988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App D Document & Releasable Portions of Documents E/1 Through E/3. App D & Releasable Portions of Documents E/4 Through E/6 Available in Pdr.Portions Withheld (Ref FOIA Exemption 5) ML20206D8871988-11-0808 November 1988 Responds to 881015 Postcard Recommending Keeping Seabrook & Pilgrim Facilities Closed & Question Re Nuclear Waste Disposal.Two Levels of Waste for Commercial Nuclear Power Plants Considered ML20205S3841988-10-13013 October 1988 Partial Response to FOIA Request for Documents.App D,E & F Records Encl & Available in Pdr.App F Records Partially Withheld (Ref FOIA Exemption 6) ML20155E7621988-10-0404 October 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $500 Proposed in NRC ML20155E7601988-10-0404 October 1988 Ack Receipt of & Payment for Civil Penalty in Amount of $500 Proposed in NRC ML20155E7311988-10-0404 October 1988 Ack Receipt of & Payment for Civil Penalty in Amount of $500 Proposed in NRC ML20155D9831988-10-0404 October 1988 Ack Receipt of & Payment of Civil Penalty Proposed by NRC & Enforcement Action EA 88-105 ML20155D9731988-10-0404 October 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $1,000 in Response to & Enforcement Action 88-078 ML20155D9681988-10-0404 October 1988 Ack Recipt of & Payment of Civil Penalty,Per NRC & Enforcement Action EA 88-15 ML20155D9651988-10-0404 October 1988 Ack Receipt of & Payment of Civil Penalty,Per NRC & Enforcement Action 88-12 ML20155D9211988-10-0404 October 1988 Ack Receipt of & Payment of Civil Penalty,Per NRC & Enforcement Action EA 88-021 ML20154S7791988-09-20020 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $1,000 Proposed in NRC ML20154R4961988-09-20020 September 1988 Ack Receipt of & Payment of Civil Penalty Proposed by NRC ML20154R0781988-09-20020 September 1988 Ack Receipt of in Response to 880809 Notice of Violation Per Enforcement Action 88-029 ML20154Q9471988-09-20020 September 1988 Ack Receipt of & Payment of Civil Penalty Proposed by NRC ML20154Q9321988-09-20020 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $500 Proposed in NRC ML20154Q8951988-09-20020 September 1988 Ack Receipt of & Check for Payment of Civil Penalty Proposed by ML20154Q8761988-09-20020 September 1988 Ack Receipt of & Check for Payment of Civil Penalty Proposed by NRC in ,Per Enforcement Action 88-028 ML20154N1031988-09-20020 September 1988 Ack Receipt of 880906 Response to 880809 Notice of Violation ML20155B6901988-09-20020 September 1988 Ack Receipt of & Payment in Amount of $1,000 in Response to Violation Noted in NRC ML20155A3191988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $500 Proposed in NRC ML20154R4671988-09-19019 September 1988 Ack Receipt of & Payment for Civil Penalty Proposed by NRC .Informs That Future Violations, Indicating Failure to Carry Out Public Trust,May Result in Termination of License ML20154R0641988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty Proposed by NRC Per Enforcement Action 88-027 ML20154Q9111988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty Proposed by NRC ML20154N0941988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $500.Future Violations Similar to Ones Committed, Per 880809 Notice of Violation,May Result in Termination of License ML20154N0731988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $500.Repeated Violation May Result in Termination of License ML20154N0501988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $800.Repeated Violation Will Terminate License ML20154D3891988-08-22022 August 1988 Partial Response to FOIA Request for Documents.Forwards App T Documents.Apps & T Documents Available in PDR ML20245D6581988-08-0404 August 1988 Discusses to Congressman Hastert Re Concern That Maint & Operations Employees of Listed Nuclear Power Plants in Vicinity of Seneca,Il Working Excessive Hrs ML20206E0051988-07-27027 July 1988 Responds to Enclosing Prior Correspondence W/Nrc Re Conditions at Ref Plants & 10CFR50.54(x) & (Y).Issues Raised Will Be Given Wide Dissemination in Fr & Careful Consideration by NRC ML20207D1121988-07-0505 July 1988 Partial Response to FOIA Request for Documents.Forwards App M Documents.App L Documents Maintained in Pdr.Apps N & O Documents Partially & Totally Withheld,Respectively (Ref FOIA Exemption 5) ML20195F8041988-06-15015 June 1988 First Partial Response to FOIA Request for Documents. Forwards Apps B & C Documents.Documents Available in Pdr.App a Documents Also Available in Pdr.Apps D Through G Documents Withheld (Ref FOIA Exemption 5).Releasable Portion Encl ML20155K0211988-06-13013 June 1988 Partial Response to FOIA Request for Documents.Forwards App D Documents.App C Documents Available in Pdr.App E Documents Completely Withheld (Ref FOIA Exemption 5) ML20151M6061988-04-19019 April 1988 Responds to FOIA Request for Info Re Scores of Reactor Operators & Senior Reactor Operators.Forwards Requalification Exam Summary Source Sheets Listed in Encl App W/Personal Privacy Info Deleted ML20151Y4681988-04-15015 April 1988 Partial Response to FOIA Request for Documents Re Event Involving Problems W/Msiv.App a & B Documents Available in Pdr.App B Documents Also Encl ML20151C6641988-04-0404 April 1988 Partial Response to FOIA Request for Documents Re Info Assessment Team Notification & Alleged Valve Tampering. App a Documents Available in Pdr.Forwards App B Documents. App B Documents Also Available in PDR ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20149H8811988-02-18018 February 1988 Partial Response to FOIA Request for Documents.Forwards App a Documents.Documents Also Available in PDR ML20149G0731988-02-10010 February 1988 Responds to Re Announced Reorganization of NRC at TMI-2.NRC Personnel Stationed at Site,Region I & NRC Headquaters Will Continue to Provide Effective Regulatory Oversight of Cleanup Activities 1989-09-26 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217M6631999-10-19019 October 1999
[Table view]Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T5451999-08-12012 August 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Licensee Request for Amends to Plant. Amends Consist of Changes to TS to Correct Typos & Editorial Errors Introduced in TS by Previous Amends ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210P1561999-08-10010 August 1999 Submits Response to Requests for Addl Info Re GL 92-01,rev 1,Suppl 1, Rv Structural Integrity, for Pbap,Units 1 & 2. NRC Will Assume That Data Entered Into Rvid Are Acceptable for Plants,If Staff Does Not Receive Comments by 990901 ML20210N7831999-08-0909 August 1999 Forwards Copy of Notice of Consideration of Issuance of Amends to Fols,Proposed NSHC Determination & Opportunity for Hearing, Re 990806 Request for License Amends.Amends Incorporate Note Into PBAPS TS to Permit One Time Exemption ML20210P0801999-08-0404 August 1999 Forwards Initial Exam Repts 50-277/99-301 & 50-278/99-301 on 990702-14 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210J0161999-07-30030 July 1999 Forwards Copy of Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amends Re 990723 Application ML20210H5341999-07-27027 July 1999 Forwards Insp Repts 50-277/99-05 & 50-278/99-05 on 990518- 0628.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209F2461999-07-15015 July 1999 Request Addl Info Re Relief Request CRR-01 Through CRR-11 for Plant,Units 2 & 3.RAI Undtd ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195K2251999-06-11011 June 1999 Forwards Insp Repts 50-277/99-04 & 50-278/99-04 on 990405- 0517.One Severity Level IV Violation of NRC Requirements Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20207G2051999-06-0707 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Reorganization Chart Encl ML20207B8381999-05-24024 May 1999 Forwards FEMA Final Exercise Rept for Peach Bottom Atomic Power Station Plume Exposure Pathway Exercise Conducted on 981117.One Deficiency & 27 Areas Requiring Corrective Actions Identified ML20207A0541999-05-17017 May 1999 Acks 990512 & 14 Telcons with Licensee Re Util Request That Rev 8 of NUREG-1021, OL Exam Stds for Power Reactors Be Followed Rather than Interim Rev 8 for Exams in Sept 1999. Request Acceptable ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML20206K2231999-05-0606 May 1999 Informs That Author Authorized to Exercise Discretion & Not Issue NOV or Civil Penalty Re Violation Util Identified Involving Unit 2 Rod Block Monitoring Sys Being Inoperable for 29 of 185 Control Rods ML20206K1921999-05-0606 May 1999 Discusses 990503 Telcon Between J Williams & B Bierly Re Arrangements Made for Administration of Licensing Exam at Peach Bottom Facility During Week of 990913 ML20206A1511999-04-20020 April 1999 Forwards Request for Addl Info Re Util 980514 Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-operated Valves. Response Requested within 90 Days of Ltr Receipt ML20206A2801999-04-20020 April 1999 Discusses Proposed Changes Submitted by PECO on 980416, 981116,990122 & 990211 to Plant Emergency Action Levels (Eals).Eals Incorporate Guidance in NUMARC/NESP-007,Rev 2. SE Supporting Proposed EALs Encl ML20205N1961999-04-0909 April 1999 Informs of NRC Planned Insp Effort Resulting from Peach Bottom Atomic Power Station Plant Performance Review Conducted for Period April 1998 to 990115.Historical Listing of Plant Issues & Insp Plans Through Jan 2000 Encl ML20205K7321999-04-0707 April 1999 Forwards Amends 227 & 230 to FOLs DPR-44 & DPR-56, Respectively.Amends Consist of Changes to TS SRs Re Secondary Containment Doors,In Response to 980204 Application,As Revised by ML20205J0531999-04-0101 April 1999 Ack Receipt of 990326 Notice of Enforcement Discretion Request & Documents Resolution.Notes That E3 EDG Returned to Operable Status on 990327,within 14 Day Completion Time Required by Ts.No Enforcement Discretion Necessary ML20205B9891999-03-25025 March 1999 Forwards Insp Repts 50-277/99-01 & 50-278/99-01 on 990105-0215.Violation Noted & Being Treated as non-cited Violation.Nrc Concluded That Staff Maintained Effective Influents Controls & Effective Security Program ML20203H7751999-02-12012 February 1999 Discusses Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Peach Bottom Atomic Power Station ML20203H8101999-02-12012 February 1999 Discusses Completion of Licensing Action for Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in BWR, ML20202J5251999-02-0101 February 1999 Forwards Insp Repts 50-277/98-11 & 50-278/98-11 on 981110- 990104 & Notice of Violation Re Failure to Complete Facility Licensed Operator Requalification Program ML20202J8081999-02-0101 February 1999 Forwards Insp Repts 50-277/98-09 & 50-278/98-09 & Notice of Violation.Insp Focused on Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operation Conditions ML20203A6111999-01-22022 January 1999 Confirms 990115 Conversation Between Mj Williams & P Orphanos Re Arrangements Made for Administration of Licensing Exam at Limerrick Generating Station & Peach Bottom Atomic Power Station During Week of 990705 ML20199D2291999-01-12012 January 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core of Over Safety-Related Equipment ML20198P1761998-12-30030 December 1998 Forwards from R Calvan Transmitting FEMA Rept for Spring 1998 Peach Bottom Atomic Power Station Ingestion Exposure Pathway Exercise.No Deficiencies Identified During Exercise Conducted on 980407-09,980506 & 980519-21 1999-09-08 |
Text
'
s 2nr oq'o d,
UNITED STATES
~ '^3 E n NUCLEAR REGULATORY COMMISSION
$ $ WASHINGTON, D. C. 20555
\...../
JUL to mg Mr. Steven C. Sholly Technical Research Associate Union of Concerned Scientists 1346 Connecticut Avenue, NW, Suite 1101 IN RESPONSE REFER Washington, DC 20036 TO F01A-85-447
Dear Mr. Sholly:
This is in response to your letter dated June 21, 1985, in which you requested, pursuant to the Freedom of Infonnation Act,12 separate documents which were referenced in Draft 1, NUREG-0956, " Reassessment of the Technical Bases for Estimating Source Tenns."
During your June 27, 1985, telephone conversation with Nina Toms and Rita Hoskins, you withdrew your request for the document identified at letter A of your request. The staff was unable to locate the document identified at letter D.
l The enclosed appendix identifies the remaining requested documents. These documents are being placed in the NRC's Public Document Room, 1717 H Street, NW, Washington, DC 20555, in file folder F01A-85-447 for your inspection and copying.
Singbrely, f /
- 4 M. elton, Director
~^
Division of Rules and Records Office of Administration
Enclosure:
As stated i
hgB1 7 850710 SHOLLYB5-447 ppg
Re: F0!A-85-447 APPENDIX B. 06/28/84 Letter to Mr. Ralph Meyer from James A. Gieseke, Contract No.
NRC-04-84-127, Task II, Re: Report on Trap-Melt / Merge Mergins to USNRC (13 pages)
C. 04/11/85 Letter to Mr. Ralph Meyer from James A. Gieseke, contract No.
NRC-04-84-127 Task 11. (17 pages)
E. 08/83 NAVA Mod 4 "A Code for Calculating Aerosol Behavior in LWR Core Melt Accidents Code Description and Users Manual (70 pages)
F. 04/02/85 Letter to Robert Minogue from Jack V. Walker (4 pages)
G. 02/01/85 Letter to Mr. 0.E. Bassett w/ attachment re: Reactor Safety Research Sumary of Activities and Results-FY84 for the Nuclear Regulatory Comission (NP.C) (13 pages)
H. 08/29/84 Informal Report on Source Term Predictions for Various Containment Failure Assumptions to U.S. Nuclear Regulatory Comission, by J. A. Gieseke, H. Chen, P. Cybulskis, R. Freeman-Kelly, M.R. Kuhlman, and K.W. Lee (60 pages)
I. 01/10/85 Letter to Dr. M. Silberberg from Edward A. Warman, subject:
RESULTS OF SANDIA/SWEC CODE COMPARIS0N (2 pages)
J. 02/20/85 Letter to Ms. Jocelyn Mitchell from Peter Cybulskis (3 pages)
K. 03/04/85 Letter to Ms. Jocelyn Mitchell from Arlin K. Postma (1 page)
L. 04/1984 Comment Tracking System for the Severe Accident Source Term Program Office, by Christopher P. Ryder (483 pages)