ML20133Q345

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-461/85-28 on 850715-19.No Noncompliance Identified
ML20133Q345
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/08/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20133Q349 List:
References
NUDOCS 8508150105
Download: ML20133Q345 (2)


See also: IR 05000461/1985028

Text

- _ _ ,

' .

.

'

t

OG 0 8N

Docket No. 50-461

Illinois Power Company

ATTN: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. A. Paul of

this office on July 15-19, 1985, of activities at Clinton Power Station,

Unit 1, authorized by NRC Construction Permit No. CPPR-137 and to the

discussion of our findings with members of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. D. Shafer, Chief

Emergency Preparedness and Radiological

Protection Branch

Enclosure: Inspection Report

No. 50-461/85028

'

/

Ogal%$0$000000g1

0 [h

G lg

See Attached List for Distribution

T

--

y,

Illinois Power Company 2 AUG08 N

Distribution

cc w/ enclosure:

DMB/DocumentControlDesk(RIDS)

Resident Inspector, RIII

Richard Hubbard

Gary N. Wright, Manager

Nuclear Facility Safety

Jean Foy, Prairie Alliance

Allen Samelson, Assistant

Attorney General,

Environmental Control Division

H. S. Taylor, Quality Assurance

Division

k e

08/06/85

r

h

i