Text
ygU
.
.
OCT 2119B5
.
.
AlabgmjdowerCompany
ATTN:
Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
SUBJECT:
REPORT NOS. 50-348/85-39 AND 50-364/85-39
On September 23-27, 1985, NRC inspected activities authorized by NRC Operating
License Nos. NPF-2 and NPF-8 for your Farley Units 1 and 2 facilities. At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
,
Should you have any questions concerning this letter, please contact us.
Sincerely,
$ k bfe kr
,
David M. Verrelli, Chief
,
!
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-348/85-39
and 50-364/85-39
/ encl:
krc . Whitt, Executive Vice President
i
D. Woodard, General Manager -
, Juclear Plant
W G. Hairston, III, General Manager -
l
Nuclear Support
l
I W. McGowan, Manager-Safety Audit
nd Engineering Review
G. Ware, Supervisor-Safety Audit
and Engineering Review
bec w/ encl:
(See page 2)
ll
8511010460 051021
ADOCK 05000348
G
3500
r
-
l.
.
.
c o
Alabama Power Company
2
OCT 211985
.
bc w/ encl:
Resident Inspector
Reeves, Project Manager, NRR
Document Control Desk
State of Alabama
o
RII
I
RII g
P urne t:cdg
j.<FJape
AHerdt
10//7/85
10//7/85
10/g1/85
.
!
L