Forwards Draft SAIC-85/1517-5, Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities for Clinton.... Telcon W/Project Manager Re Discrepancies Recommended
ML20133Q123
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/24/1985
From: Butler W
Office of Nuclear Reactor Regulation
To: Spangenberg F
ILLINOIS POWER CO.
Shared Package
ML20133Q125 List:
References
GL-83-28, NUDOCS 8511010397
Download: ML20133Q123 (4)


Text

-.

8 OCT 2 41985 Docket No.: 50-461 i

Mr. Frank A. Spangenberg Director of Nuclear Licensing Configuration Management Clinton Power Station P.C. Ecx 306 Mail Code V920 Clintcn, Illinois 61727

Dear Mr. Spangenberg:

SL'BJECT : 0 RAFT TERs FOR ITEM 1.2 " POST TRIP REVIEW: DATA AND INFORMATICN CAPABILITIES" 0F GENERIC LETTER 83-28 FOR CLINTON POWER STATION By letter cated October 1,1984 Illinois Fcwcr Cctrpany (IP) provided a response to Generic Letter 83-28 (Required Actions Based on Generic Implication of Salem ATWS Events). The staff's consultant Science Applications International Corporation (SAI) has reviewed IP's response to Iter 1.2 *Fost Trip Review:

Data and Information Capabilities" of Generic Letter 83-26. The enclosed l

draft TER prepared by SAI identifies the areas where IP's response does not l

indicate that the post-trip review data end information capabilities are adequate to satisfy the rcquirenents of Generic Letter 83-28.

After you have reviewed this TER you should contact the staff's project manager for your application to arrange a conference call between IP, the staff ar.d SAI to resolve the discrepancies identified.

It is recommended that these discrepancies be resolved prior to the issuance of a low-power license to avoid the necessity of any license conditions 'related to this g

1 1 ten.

l t

I Original Signed by l

Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing cc: See next page DISTRIBUTION Decketfile s PRC Systen BSiegel EJordar i

NRC PDR LB#2 Reading 9 ELD, Attorney Local PDR ACRS (16)

BGrines NSIC EHylton JPartlow r

i LB#

LB#2/DL BSiege dh WRButler 10/)V/85 10/pd85 l

8511010397 851024 PDR ADOCK 05000461 A

PM

[

OCT 2 41985 Docket No.: 50-461 1

Mr. Frank A. Spangenberg Director of Nuclear Licensing Configuration Management Clinton Power Station P.O. Box 306 Mail Code V920 Clinten, Illinois 61727

Dear Mr. Spangenberg:

SL'BJECT: LRAFT TERs FOR ITEM 1.2 " POST TRIP REVIEW: DATA AND INFORMATICh CAPABILITIES" 0F GENERIC LETTER 83-28 FOR CLINTON POWER STATICl1 By letter catec October 1,1984 Illinois Pcwer Cerrpany (IP) provided a response

- to Generic Letter 83-28 (Required Actions Based on Generic Implication of Salem ATUS Events). The staff's consultant Science Applications International Corporation (SAI) has reviewed IP's response to Item 1.2 " Post Trip Review:

Data and Information Capabilities" of Generic Letter 83-28. The enclosed draft TER preparea by SAI identifies the areas where IP's respense does not indicate that the post-trip review data and information capabilities are adequate to satisfy the requirements of Generic Letter 83-28.

Af ter you have reviewed this TER you should ccntact the staff's project aanager for your application to arrange a conference call between IP, the staff crid SAI to resolve the discrepancies identifiec.

It is recommended that these discrepancies be resolved prior to the issuance of a low-power license to avcid the necessity of any license conditions related to this item.

Original Signed by Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing cc: See next page j

l DISTRIBUTION Docket File PRC System BSiegel EJordan NRC PDR LB#2 Reading OELD, Attorney Local PDR ACRS (16)

BGrines NSIC EHylton JPartlow 0

LB#

LBs2/GL 17 SSiege :dh WRButler 3.'

1C.fri.S LCI,IE5 I

_,,,,,.-r.-_

.._,----.e,

o, UNITED GTATEs

! 3,p,[J j NUCLEAR REGULATORY CO!1 MISSION

.f f

C WASHINGTON, D. C. 20555

-;. w.y f e

OCT 2 4 196

='

Docket No.:

50-461 Mr. Frank A. Spangenberg Director of l'uclear Licensing Configuration Management Clinton Power Station P.O. Box 306 Mail Code V920 Clinton, Illinois 61727 Cear Mr. Spangenberg:

SUBJECT:

DRAFT TERs FOR ITEM 1.2 " POST TRIP REVIEW: DATA AND Ii4FORMATI0h CAPABILITIES" 0F GENERIC LETTER 83-28 FOR CLINTON POWER STATION By letter dated October 1,1984 Illinois Power Company (IPl provided a response to Generic Letter 83-28 (Required Actir Based on Generic Implication of Salem ATWS Events). The staff's consu.

. Science Applications International Corporation (SAI) has reviewed IP's response to Item 1.2 " Post Trip Review:

Data and Information Capabilities" of Generic Letter 83-28. The enclosed draft TER prepared by SAI identifies the areas where IP's response does not indicate that the post-trip review data and inferrration capabilities are adequate to satisfy the requirements of Generic Letter 83-28.

After you have reviewed this TER you should contact the staff's project manager for your application to arrange a conference call between IP, the staff and SAI to resolve the discrepancies identified.

It is reconynended that these discrepancies be resolved prior to the issuance of a low-power license to avoid the necessity of any license conditions related to this iten.

Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing j

cc: See next page l

l l

l

Mr. Frank A. Spangenberg Clinton Power Station Illinois Power Company Unit I cc:

Mark Jason Jean Foy, Esquire Assistant Attorney General 511 W. Nevada Public Utilities Division Urbana, Illinois 61801 Office of the Attorney General State of Illinois Center Richard B. Hubbard 100 West Randolph Street - 12th Floor Vice President l

Chicago, Illinois 60601 Technical Associates i

1723 Hamilton Avenue - Suite K i

Mr. D. P. Hall San Jose, California 95125 Vice President Clinton Power Station P. O. Box 678 Clinten, Illinois, 61727 Mr. H. R. Victor Manager-Nuclear Station Engineering Dpt.

Clinton Power Station i

P. O. Box 678 i

Clinton, Illinois 61727 i

Sheldon Zabel, Esquire l

Schiff, Hardin & Waite 7200 Sears Tower 233 Macker Drive Chicago, Illinois 60606 i

l Resident Inspector i

U. S. Nuclear Regulatory Comission j

RR 3, Box 229 A Clinton, Illinois 61727 I

i Mr. R. C. Heider l

Project Manager l

Sargent & Lundy Engineers 55 East Monroe Street i

Chicago, Illinois 60603 i

Mr. L. Larson l

Project Manager General Electric Company l

175 Curtner Avenue, N/C 395 San Jose, California 95125 i

Regional Administrator, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

\\

1 i

_. _...,... _ -.. ~. _ _ _ _.. _