IR 05000498/1985016

From kanterella
(Redirected from ML20133P734)
Jump to navigation Jump to search
Insp Rept 50-498/85-16 on 850909-13.No Violation or Deviation Noted.Major Areas Inspected:Const Activities, Including Site Tour & QA Programs & Procedures for Receipt, Storage,Installation & Maint of Electrical Equipment
ML20133P734
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 10/18/1985
From: Bess J, Constable G, Ireland R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20133P719 List:
References
50-498-85-16, NUDOCS 8511010161
Download: ML20133P734 (4)


Text

APPENDIX U. S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report:

50-498/85-16 Construction Permit:

CPPR-128 Docket:

50-498 Licensee: Houston Lighting and Power Company (HL&P)

P. O. Box 1700 Houston, Texas 77001 5 Facility Name:

South Texas Project (STP), Unit 1 Inspection At:

South Texas Project, Matagorda County, Texas Inspection Conducted:

September 9-13, 1985 Inspector : h.f.Sg)

J/fg/g5 W. E.' Bess, Reactor Inspector, Engineering Section Date

'

,

_

/o[/9!f3'

'

'

Approved:

. 1, J G. ~ L. Constable, Chief, Reactor Project Section C Date

'

b A0/Jih5 R. E. Ireland, Chief E'ngineering Section Date / ~

Inspection Summary Inspection Conducted September 9-13, 1985 (Report 50-498/85-16)

Areas Inspected:

Routine unannounced inspection of construction activities including site tour; review of QA programs and procedures for the receipt, storage, installation and maintenance of electrical equipment and components.

The inspection involved 40 inspector-hours onsite by one NRC inspector.

Results: Within the two areas inspected, no violations or deviations were identified.

9511010161 851023 PDR ADOCK 05000498 G

PDR I

__

-

.-

-

_.

-

.

.

~2-DETAILS 1.

Persons Contacted Principal Licensee Personnel

  • D. Bohner, Project Quality Asserance (QA) Supervisor
  • T. Jordan, Project QA Manager
  • L. Dolan, Project Compliance
  • S. Chapin, Electrical Engineer
  • F. Karpinski, Construction Supervisor Other Personnel Bechtel Power Corporation
  • L. Hurst, Project QA Manager
  • J. Beers, Site Project Engineer
  • J. Gatewood, Project QA Engineer Ebasco Service Inc.
  • R. Peck, QA Site Supervisor The NRC inspector also interviewed other licensee and contractor employees during the course of the inspection.

i

  • Denotes those attending the exit interview.

2.

Site Tour The NRC inspector toured the reactor building, control room, fuel

!

building, and auxiliary building for Unit 1 to observe construction in l

progress and to inspect housekeeping.

No violations or deviations were identified.

3.

QA Programs and Procedures - Electrical Equipment and Components The purpose of this inspection was to determine whether appropriate and adequate QA procedures exist to assure compliance with NRC requirements

'

'

and licensee commitments for the performance of the following activities pertaining to electrical equipment and components:

receipt, storage, j

installation and maintenance.

l

,

-

. -..

.

.,,

-

-

-,,,

,

-,.

.

. - _ _ _

A

e

.

,

,

-3-l A.

Receipt Inspection and Storage The NRC inspector examined the licensee's QA procedures for receipt

!

. inspection and storage of electrical equipment and components.

The i

procedures examined and the licensee's adherence to these procedures appeared to meet NRC requirements and licensee commitments.

The procedures examined are listed below:

j Receiving Inspection - WPP/QCI-4.0 Rev. 10, 4/30/85

Nonconforming Material Parts and Components - WPP/QCI-5.0

Rev. 14, 8/26/85 f

Storage Control of Permanent Plant Items - WPP/QCI-12 Rev.16,

8/16/85 Storage and Housekeeping - WPP/QCI-13 Rev. 8, 8/16/85

.

!

General Instruction for Housekeeping During Construction, CSP-12

Rev. 1, 7/22/85 l

The examined procedures and documents provide for adequate inspection

of electrical components and equipment upon receipt to assure that l

the electrical equipment and components are undamaged, are in confor-

!

mance with purchase specifications, and that specified inspection

!

reports are prepared. The examined procedures also assure special j

handling and onsite storage requirements.

Adherence to the proce-i dures will assure that receipt inspection and storage requirements including environmental protection and segregation of nonconforming material are met.

No violations or deviation were identified.

B.

Installation and Maintenance

!

!

The NRC inspector examined the licensee's QA procedures pertaining to l

the Installation and Maintenance of electrical components and equip-ment.

The procedures examined and the licensee's adherence to these

>

procedures appeared to meet NRC requirements and licensee commitments.

The procedures examined are listed below:

!

Installation of Permanent Electrical and Mechanical Plant

.

Equipment - CSP-2 Rev. 4, 5/14/85 s

!

Caring'and Maintenance of Permanent Plant Items CMI Rev. 6,

_

4/15/85

i

.'

Rigging of Equipment - WPP/QCI-15 Rev. 6, 5/21/85

!

EE580 Cable and Raceway Tracking, 5/21/85

i

.

_

_

__ _ _ _ _ _ _ _ _ _ - - _

_,

__

.

_

__

_

..

- _ _ _ _ _

-

-

,.

,

l i

-4-

!

Measuring and Test Equipment Control - ASP-23 Rev. 2, 7/31/85

Material Control - ASP-5 Rev. 8, 6/24/85

Configuration Control Package Design Change Package - ASP-17

!

Rev.-1, 4/18/85 i

l Nonconformances - ASP-33 Rev. 8, 7/24/85

l

]

Notice of Procedure Changes - WPP/QCI 2.3 Rev. 7, 3/5/85

i Control, Review and Processing of Quality Records - WPP/QCI-60

e

Rev. 9, 8/16/85

'

!

j Maintenance of Material and Equipment - WPP/QCI-28 Rev. 10,

5/21/85 l

Safety and Non-Safety Related Cable Pulling - CSP-19 Rev. 4,

7/30/85

-,

Cable Terminations and Splices - CSP-8 Rev.1, 2/14/85

!

Document Control - ASP-6 Rev. 7, 4/17/85

Corrective Action - ASP-16 Rev. 3, 1/01/85

Indoctrination and Training - ASP-34 Rev. 4, 7/29/85

!

Qualification and Training of Site Personnel - WPP/QCI-8 Rev.10,

{

5/24/85

'

.;

!

Field Change Notice - WPP/QCI-20.1 Rev. 5, 5/21/85

}

Fi ld Change Request - WPP/QCI-20 Rev. 15, 8/20/85

e i

!

The NRC inspector verified that procedures covering handling, instal-l 1ation and maintenance requirements have been established.

Procedures

!

pertaining to the protection, preservation of internal cleanliness i

and maintenance of components after installation appeared to meet NRC

,

requirements.

!

No violations or deviations were identified.

,

l l

4.

Exit Interview

l The NRC inspector met with licensee representatives (denoted in paragraph 1)

'

and Mr. C. Johnson, the NRC Senior Resident Inspector, on September 13, 1985, and summarized the scope and finding of the inspection.

i

,

l

- - - - - -... - - - - - -

.

...

. _ _,. -.---.-.._.:--