APPENDIX U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report:
50-498/85-16 Construction Permit:
CPPR-128 Docket:
50-498 Licensee: Houston Lighting and Power Company (HL&P)
P. O. Box 1700 Houston, Texas 77001 5 Facility Name:
South Texas Project (STP), Unit 1 Inspection At:
South Texas Project, Matagorda County, Texas Inspection Conducted:
September 9-13, 1985 Inspector : h.f.Sg)
J/fg/g5 W. E.' Bess, Reactor Inspector, Engineering Section Date
'
,
_
/o[/9!f3'
'
'
Approved:
. 1, J G. ~ L. Constable, Chief, Reactor Project Section C Date
'
b A0/Jih5 R. E. Ireland, Chief E'ngineering Section Date / ~
Inspection Summary Inspection Conducted September 9-13, 1985 (Report 50-498/85-16)
Areas Inspected:
Routine unannounced inspection of construction activities including site tour; review of QA programs and procedures for the receipt, storage, installation and maintenance of electrical equipment and components.
The inspection involved 40 inspector-hours onsite by one NRC inspector.
Results: Within the two areas inspected, no violations or deviations were identified.
9511010161 851023 PDR ADOCK 05000498 G
PDR I
__
-
.-
-
_.
-
.
.
~2-DETAILS 1.
Persons Contacted Principal Licensee Personnel
- D. Bohner, Project Quality Asserance (QA) Supervisor
- T. Jordan, Project QA Manager
- L. Dolan, Project Compliance
- S. Chapin, Electrical Engineer
- F. Karpinski, Construction Supervisor Other Personnel Bechtel Power Corporation
- L. Hurst, Project QA Manager
- J. Beers, Site Project Engineer
- J. Gatewood, Project QA Engineer Ebasco Service Inc.
- R. Peck, QA Site Supervisor The NRC inspector also interviewed other licensee and contractor employees during the course of the inspection.
i
- Denotes those attending the exit interview.
2.
Site Tour The NRC inspector toured the reactor building, control room, fuel
!
building, and auxiliary building for Unit 1 to observe construction in l
progress and to inspect housekeeping.
No violations or deviations were identified.
3.
QA Programs and Procedures - Electrical Equipment and Components The purpose of this inspection was to determine whether appropriate and adequate QA procedures exist to assure compliance with NRC requirements
'
'
and licensee commitments for the performance of the following activities pertaining to electrical equipment and components:
receipt, storage, j
installation and maintenance.
l
,
-
. -..
.
.,,
-
-
-,,,
,
-,.
.
. - _ _ _
A
e
.
,
,
-3-l A.
Receipt Inspection and Storage The NRC inspector examined the licensee's QA procedures for receipt
!
. inspection and storage of electrical equipment and components.
The i
procedures examined and the licensee's adherence to these procedures appeared to meet NRC requirements and licensee commitments.
The procedures examined are listed below:
j Receiving Inspection - WPP/QCI-4.0 Rev. 10, 4/30/85
Nonconforming Material Parts and Components - WPP/QCI-5.0
Rev. 14, 8/26/85 f
Storage Control of Permanent Plant Items - WPP/QCI-12 Rev.16,
8/16/85 Storage and Housekeeping - WPP/QCI-13 Rev. 8, 8/16/85
.
!
General Instruction for Housekeeping During Construction, CSP-12
Rev. 1, 7/22/85 l
The examined procedures and documents provide for adequate inspection
of electrical components and equipment upon receipt to assure that l
the electrical equipment and components are undamaged, are in confor-
!
mance with purchase specifications, and that specified inspection
!
reports are prepared. The examined procedures also assure special j
handling and onsite storage requirements.
Adherence to the proce-i dures will assure that receipt inspection and storage requirements including environmental protection and segregation of nonconforming material are met.
No violations or deviation were identified.
B.
Installation and Maintenance
!
!
The NRC inspector examined the licensee's QA procedures pertaining to l
the Installation and Maintenance of electrical components and equip-ment.
The procedures examined and the licensee's adherence to these
>
procedures appeared to meet NRC requirements and licensee commitments.
The procedures examined are listed below:
!
Installation of Permanent Electrical and Mechanical Plant
.
Equipment - CSP-2 Rev. 4, 5/14/85 s
!
Caring'and Maintenance of Permanent Plant Items CMI Rev. 6,
_
4/15/85
i
.'
Rigging of Equipment - WPP/QCI-15 Rev. 6, 5/21/85
!
EE580 Cable and Raceway Tracking, 5/21/85
i
.
_
_
__ _ _ _ _ _ _ _ _ _ - - _
_,
__
.
_
__
_
..
- _ _ _ _ _
-
-
,.
,
l i
-4-
!
Measuring and Test Equipment Control - ASP-23 Rev. 2, 7/31/85
Material Control - ASP-5 Rev. 8, 6/24/85
Configuration Control Package Design Change Package - ASP-17
!
Rev.-1, 4/18/85 i
l Nonconformances - ASP-33 Rev. 8, 7/24/85
l
]
Notice of Procedure Changes - WPP/QCI 2.3 Rev. 7, 3/5/85
i Control, Review and Processing of Quality Records - WPP/QCI-60
e
Rev. 9, 8/16/85
'
!
j Maintenance of Material and Equipment - WPP/QCI-28 Rev. 10,
5/21/85 l
Safety and Non-Safety Related Cable Pulling - CSP-19 Rev. 4,
7/30/85
-,
Cable Terminations and Splices - CSP-8 Rev.1, 2/14/85
!
Document Control - ASP-6 Rev. 7, 4/17/85
Corrective Action - ASP-16 Rev. 3, 1/01/85
Indoctrination and Training - ASP-34 Rev. 4, 7/29/85
!
Qualification and Training of Site Personnel - WPP/QCI-8 Rev.10,
{
5/24/85
'
.;
!
Field Change Notice - WPP/QCI-20.1 Rev. 5, 5/21/85
}
Fi ld Change Request - WPP/QCI-20 Rev. 15, 8/20/85
e i
!
The NRC inspector verified that procedures covering handling, instal-l 1ation and maintenance requirements have been established.
Procedures
!
pertaining to the protection, preservation of internal cleanliness i
and maintenance of components after installation appeared to meet NRC
,
requirements.
!
No violations or deviations were identified.
,
l l
4.
Exit Interview
l The NRC inspector met with licensee representatives (denoted in paragraph 1)
'