| From: | Daltroff S, Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Daltroff S, Martin T PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20133P633 | List: |
| References | |
| NUDOCS 8511010092 | |
| Download: ML20133P631 (2) | |
See also: IR 05000277/1985032
Text
_
-.,
DESIcFAID ORIGINAL
Cortifion Ey :,hy_1c }t% ,
'
'
,
'
~
OCT 2 51505
.
e
.
.
Docket Nos.
50-277
License No. DPR-44
50-278
Philadelphia Electric Company
ATTN: Mr. S. L. Daltroff
Vice President
Electric Production
2301 Market Street
--
,
Philadelphia, Pennsylvania 19101
Gentlemen:
.
Subject:
Combined Inspection No. 50-277/85-32 and 50-278/85-29
This refers to the routine safeguards inspection conducted by Mr. R. J. Bailey
of this office on August 5-9, 1985 of activities authorized by NRC License
Nos. DPR-44 and DPR-56 at the Peach Bottom Atomic Power Station, Delta,
Pennsylvania and to the discussions of our findings held by Mr. Bailey with
Mr.'R. S. Fleischman of your staff at the conclusion of the inspection.
Areas ' examined d'uring this inspection are described in the NRC Region I
Inspection Repo~rt which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the violation
brought to your attention in the enclosure to our letter dated July 25, 1984.
We have no further questions regarding your action at this time.
Within the scope of this inspection, ne violations were observed.
'
Sections of the enclosed inspection report contain details of your security
'
program that have been determined to be exempt from public disclosure in
accordance with 10 CFR 73.21 (Safeguards Information). Therefore, the
sections so identified in the inspection report will not be placed in the NRC
a
Public Document Room and will e.ceive limited distribution. The inspection
report cover sheet and the r.maining portions of the inspection report will be
placed in the Public Document Room, in accordance with 10 CFR 2.790(a).
RAim W@7
-
G
OFFICIAL RECORD COPY
,
Yi
n
'
-
-
-
.
_
.
Philadelphia Electric Company
2
OCT 2 51985
.
No reply to this letter is required.
Your cooperation with us in this matter
is appreciated.
Sincerely,
original Siped By:
James H. Jevn. r
Thomas T. Martin, Director
Division of Radiation Safety
and Safeguards
Enclosure: NRC Region I Combined Inspection Report Number ',0-277/85-32 and
50-278/85-29 (Paragraphs 9,10 and 11 contain Safeguards
Information)
cc w/ encl:
(w/o Paragraphs 9,10 and 11)
R. 5. Fleischmann, Plant Manager
John S. Kemper, Vice President, Engineering and Research
Troy B. Conner, Jr., Esquire
A. J. Pietrofitta, General Manager, Power Production Engineering, Atlantic
Electric
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
PublicDocumentRoom(PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (w/SGI)
Commonwealth of Pennsylvania
bec w/ encl:
(w/o Paragraphs 9, 10 and 11)
Region I Docket Room (wtth concurrences)
ManagementAssistant,DRMA(w/oenc1)
Section Chief, DRP
RI:DF
RI: SS
RI ORSS
Baill
Ke
'S
Joynep
Mgr in
10/2i/8
10/SI/85
. 10/P /85
10/ /85
0FFICIAL RECORD COPY