ML20133P631

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Repts 50-277/85-32 & 50-278/85-29 on 850805-09.No Violations Noted
ML20133P631
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/25/1985
From: Daltroff S, Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Daltroff S, Martin T
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20133P633 List:
References
NUDOCS 8511010092
Download: ML20133P631 (2)


See also: IR 05000277/1985032

Text

_

-.,

DESIcFAID ORIGINAL

Cortifion Ey :,hy_1c }t% ,

' '

,

' ~

.

OCT 2 51505

e .

.

Docket Nos. 50-277 License No. DPR-44

50-278 DPR-56

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street -- ,

Philadelphia, Pennsylvania 19101

Gentlemen:

.

Subject: Combined Inspection No. 50-277/85-32 and 50-278/85-29

This refers to the routine safeguards inspection conducted by Mr. R. J. Bailey

of this office on August 5-9, 1985 of activities authorized by NRC License

Nos. DPR-44 and DPR-56 at the Peach Bottom Atomic Power Station, Delta,

Pennsylvania and to the discussions of our findings held by Mr. Bailey with

Mr.'R. S. Fleischman of your staff at the conclusion of the inspection.

Areas ' examined d'uring this inspection are described in the NRC Region I

Inspection Repo~rt which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the violation

brought to your attention in the enclosure to our letter dated July 25, 1984.

We have no further questions regarding your action at this time.

Within the scope of this inspection, ne violations were observed.

'

'

Sections of the enclosed inspection report contain details of your security

program that have been determined to be exempt from public disclosure in

accordance with 10 CFR 73.21 (Safeguards Information). Therefore, the

a sections so identified in the inspection report will not be placed in the NRC

Public Document Room and will e.ceive limited distribution. The inspection

report cover sheet and the r.maining portions of the inspection report will be

placed in the Public Document Room, in accordance with 10 CFR 2.790(a).

RAim W@7

-

G

, OFFICIAL RECORD COPY

n Yi

'

_

.

Philadelphia Electric Company 2 OCT 2 51985

.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

original Siped By:

James H. Jevn. r

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Combined Inspection Report Number ',0-277/85-32 and

50-278/85-29 (Paragraphs 9,10 and 11 contain Safeguards

Information)

cc w/ encl: (w/o Paragraphs 9,10 and 11)

R. 5. Fleischmann, Plant Manager

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr., Esquire

A. J. Pietrofitta, General Manager, Power Production Engineering, Atlantic

Electric

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

PublicDocumentRoom(PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector (w/SGI)

Commonwealth of Pennsylvania

bec w/ encl: (w/o Paragraphs 9, 10 and 11)

Region I Docket Room (wtth concurrences)

ManagementAssistant,DRMA(w/oenc1)

Section Chief, DRP

RI:DF RI: SS RSS RI ORSS

Baill Ke 'S Joynep Mgr in

10/2i/8 10/SI/85 . 10/P /85 10/ /85

0FFICIAL RECORD COPY