Forwards Insp Rept 50-458/85-55 on 850715-19 & 29-0801. No Violations or Deviations Noted
ML20133P028
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/18/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20133P032 List:
References
NUDOCS 8510310096
Download: ML20133P028 (2)


See also: IR 05000458/1985055

Text

.

'

OCT 18 095

In Reply Refer To:

Docket: 50-458/85-55

l

Gulf States Utilities

ATTN: William J. Cahill, Jr.

Senior Vice President

River Bend Nuclear Group

P. O. Box 2951

Beaumont, Texas 77704

Gentlemen:

This refers to the inspection conducted by Messrs. R. A. Caldwell and

J. A. F. Kelly of this office during the period July 15-19, 1985, and by

Mr. R. A. Caldwell July 29 - August 1, 1985, of activities authorized by NRC

Construction Permit CPPR-145 for River Bend Station, and to the discussion of

our findings with you and other members of your staf f at the conclusion of the

inspection.

Areas examined during the inspection included management effectiveness,

security organization, records and reports, lock and key control, access

control-personnel, physical barriers-vital areas, detection aids-vital areas,

communications, and follow-up on inspector identified items. Within these

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the

inspector. These findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the

material with the exception of the report cover page which is an inspection

summary, will not be placed in the Public Document Room.

LCLODJ?2 CONTAINS

SAFDMUDS I:G'OK/.ATION.

LT?ON SEPARATION 1HIS

PAGE IS DDCGITROLLD.

/ff ,

q

RIV: EP&SP50 C:EP&h 4: R&SP8 D: RS&S C: Ph C:RPB

MRCaldwell: e JBai rcf' all RB iEg' art JJaydon EJohnson

1/ lY85 9/ 0 /85 p/g /85 [?/cf /85 ;o/g/85 to/g/85

8510310096 851018 8 -

PDR ADOCK 050

l

.

.4

Gulf States Utilities -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By

E. H. Johnson

E. H. Johnson, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-458/85-55

cc w/ summary page only:

Gulf States Utilities

ATTN: J. E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bcc: Copy of entire report maintained in RIV Security File and sent to:

G. McCorkle, NMSS

SSPB/NRC:NRR

IE File

Resident Inspector (w/766)

R. Martin

Security Inspector

bcc: RIV - Letter and Inspection Summary only w/766:

RPB D. Weiss, LFMB (AR-2015) MIS

EP&SPS Section Chief (RPSA) RIV Files

RSTS Operator

bcc: RIV - Letter and Inspection Summary only w/out 766:

DMB - IE04

R. Bangart

R. Denise, DRS&P

E:rL%*J.E 0% TAI:73

i S.U'2GU/.ZDS INFORV.ATIO T.

! U?CCI 5EPJ. RATION THIS

pig 3 IS DIXXCtTB% LED.

l

l