Forwards Insp Repts 50-361/96-13 & 50-362/96-13 on 960916-20,1209-13 & 970114.No Violations Identified
ML20133N969
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/21/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20133N972 List:
References
NUDOCS 9701240044
Download: ML20133N969 (5)


See also: IR 05000361/1996013

Text

, ~.

. .~

. - .

. .

_ . . - -

- , _ . - - . . . - - - . ~ - . - - _ - . - - .

. . - . - _ _ . . - . . . ~ _ - - ~ ,

.

/ [."%,I

UNITED STATES

~

NUCLEAR REGULATORY COMMISSION

[ ,ki- [ t$

REGloN IV

k NM[/[

611 RY AN PLAZA drive, sulTE 400

6

    • '

4,

AR LINGToN, T E xAS 76011-8064

.....

JAbl 21 1996

Harold B. Ray, Executive Vice President

1

<

Southern California Edison Co.

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

SUBJECT: NRC INSPECTION REPORT 50-361;-362/96-13

Dear Mr. Ray;

l

An NRC inspection w= conducted September 16-20, December 9-13,1996, and on

January 14,1997, at your San Onofre Nuclear Generating Station, Units 2 and 3 reactor

facilities. This inspection evaluated the self-assessment of your engineering and fire

1

protection activities which your staff performed as an alternative to a planned NRC team

inspection. The enclosed report presents the scope and results of the inspection. The final

i

results of this inspection were discussed with Mr. G. Gibson of your staff on January 9

l

and 14,1997.

!

Our inspection found that your self-assessment of engineering was a thorough and

comprehensive alternative to the planned NRC team inspection in this area. Your self-

assessment concluded that your engineering activities met your program requirements.

Our independent inspection generally confirmed that conclusion. Therefore, in accordance

with NRC Inspection Procedure 40501," Licensee Self-Assessments Related to Team

i

inspections," the NRC plans no further inspection effort during the current performance

l

assessment cycle at the San Onofre Nuclear Generating Station for NRC inspection

L

Procedure 37550," Engineering." Although your self-assessment of fire protection

l

concluded that your activities were effective in preventing, detecting, and responding to a

fire emergency, it did not adequately address several important inspection activities.

Theu* ore, an additional NRC inspection for NRC Inspection Procedure 64704," Fire

Protection Program," will be performed during the current performance assessment cycle

'

to confirm your self assessment conclusions in this area.

One unresolved item was identified concerning the adequacy of your 10 CFR 50.59

evaluation for your diesel generator cross-tie modification. This matter is discussed'in

Section E1.5.b(2) of the enclosed inspection report. Specifically, your self-assessment

questioned the adequacy of the 10 CFR 50.59 evaluation that had been performed for a

I

design change involving the installation of electrical components that would give operators

the ability to promptly cross-connect an emergency diesel generator from one unit to the

safety bus of another unit during an emergency 10 CFR 50.54(x) condition. The

i

!

9701240044 970121

PDR

ADOCK 05000361

0

PDR

i

. - -

,.

-

- - . .

- _- --

-

..

.-

-

- - _ . - - .

. . _ -

- . _ = _ . .-

-

_ ._ . __

.

s

Southern California Edison Co.

-2-

l

inspectors questioned whether the physical installation of the design change in Unit 2

'

I

could result in an unreviewed safety question during normal operation of the unit. In

response to this concern, we understand that you have electrically isolated the

modification and submitted a description of the modification to the NRC for further

evaluation.

)

1

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document Room

(PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

' /

j

,

omas P. Gwynn,

irect r

Division of Reactor l3afet

Docket Nos. 50-361:50-362

License Nos. NPF-10; NPF-15

Enclosure:

NRC Inspection Report

50-361/96-13:50-362/96-13

cc w/ enclosure:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, California 92101

Alan R. Watts, Esq.

Rourke & Woodruff

701 S. Parker St. No. 7000

Orange, California 92668-4702

Sherwin Harris, Resource Project Manager

l

Public Utilities Department

!

City of Riverside

l

3900 Main Street

Riverside, California 92522

.

.

Southern California Edison Co.

-3-

R. W. Krieger, Vice President

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

Dr. Harvey Collins, Chief

Division of Drinking Water and

Environmental Management

California Department of Health Services

P.O. Box 942732

Sacramento, California 94234-7320

Terry Winter, Manager

Power Operations

San Diego Gas & Electric Company

P.O. Box 1831

San Diego, California 92112

Mr. Steve Hsu

Radiological Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento, California 94234

'

Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, California 92672

Mr. Truman Burns \\Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

i

I

J

.

.

Southern California Edison Co.

-5-

E-Mail report to D. Nelson (DJN)

j

E-Mail report to NRR Event Tracking System (IPAS)

i

bec to DMB (IE01)

bec distrib. by RIV:

L. J. Callan

Resident inspector

i

DRP Director

DRS-PSB

Branch Chief (DRP/F, WCFO)

MIS System

Senior Project inspector (DRP/F, WCFO)

RIV File

'

Branch Chief (DRP/TSS)

M. Hammond (PAO, WCFO)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

WCFO File

,

4

i

DOCUMENT NAME: R:\\_S023\\SO613RP.WPA

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures "N" = No copy

RIV: SRI:EB

lE

RI:EB

lE

RI:EB

E

C:EB

E

D:DRS

N

WPAng/imb ry

CJMyerpur

DBPereg; ,

CAVander)bprgh TPGwynn j;/f

01/lg97

"y ~~ 01/p/97"Y

01/(,/9W W

01/g/97 M '

01P)/8J7 / ul/fk /4

C:PBF

j

E

D:DRSV

Nj

/

l

DFKirsc$g g, g

TPGwynn 4 l ')'

_

01 A) /97 Y @'*

01 7/97

'

_

'

_

OFFICIAL RECORD COPY

T

240001

__ . _ - _ = _

_ . . . _ _ _ . . . _ _ _ _ _ . .

. _ _ _ _ _ _ . _ _ _ _ _

.

. _ _ _ _ _ _ _ _

. . _ _ _ _

_ _ _ _ _ _ __

.

-

1

Southern California Edison Co.

-5-

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

bec to DMB (IE01)

!

bec distrib. by RIV:

1

L. J. Callan

Resident inspector

DRP Director

DRS-PSB

Branch Chief (DRP/F, WCFO)

MIS System

Senior Project inspector (DRP/F, WCFO)

RIV File

Branch Chief (DRP/TSS)

M. Hammond (PAO, WCFO)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

WCFO File

I

,

i

DOCUMENT NAME: R:\\_S023\\SO613RP.WPA

To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV: SRI:EB

E

Rl:EB

lE

RI:EB

E

C:EB

E

D:DRS

N

J

WPAng/imb c-y

CJMyerpur .

DBPeregl ,

CAVander)bp,rgh TPGwynn ];/f,

01/Q97

"7v

01/g/97"T

01/(,/9W W

014/97 V ~

01P)/97 / v/[( fo

C:PBF

j

p

D:DRS V

N g /

DFKirsc%g ff, f

TPGwynn 4 l

]

01 A)/97 Y (hig

01pl/97

"

V

<

OFFICIAL RECORD COPY