Forwards Insp Repts 50-327/85-24 & 50-328/85-24 on 850617-21 & Notice of Violation.Concern Expressed Re Lack of Firm Commitment by Plant Mgt to Correct Maint Mgt Sys
ML20133N276
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/07/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20133N278 List:
References
NUDOCS 8508130434
Download: ML20133N276 (3)


See also: IR 05000327/1985024

Text

, -

T ' *

g

ye//our

'

,

  • I

August 7,1985

Tennessee Valley Authority

t/ ATTN: Mr. H. G. Parris

Manager of Power and Engineering

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

SUBJECT: REPORT NOS. 50-327/85-24 AND 50-328/85-24

On June 17 - 21, 1985, NRC inspected activities authorized by NRC Operating

License Nos. DPR-77 and DPR-79 for your Sequoyah facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

Add'tionally, the NRC is concerned by the lack of a firm commitment by Sequoyah

management to correct several concerns dealing with their Maintenance Management

System.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

F508130434 850807 Original Signed by

PDR ADOCK 05000327 Roger D. Walker

C PDR Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. Inspection Report Nos. 50-327/85-24

and 50-328/85-24

cc w/encls: (See page 2)

ZEo l

_ _ _ . . . . .

.. -. . ,

.

Tennessee Valley Authority 2 August 7,1985

gc w/encls:

vfl. L. Abercrombie, Sequoyah Nuclear Plant

Site Director

. R. Wallace, Plant Manager

W. Whitt, Chief, Nuclear Safety Staff

. L. Williams, Jr., Supervisor

yd.LicensingSection

B. Kirk, Compliance

, Staff Supervisor

ud. E. Wills, Project Engineer

pccw/encls:

thRC Resident Inspector

Document Control Desk

State of Tennessee .

-

  • SEE PREVIOUS CONCURRENCE PAGE

RII RII RII RII RII RII

.

,/

  • HChristenson:sa *BDebs *CJulian * AGibson *SWeise errelli

07/ /85 07/ /85 07/ /85 07/ /85 07/ /85 /f/85

l

s

.. er o *

.

. Tennessee Valley Authority 2

cc w/encls:

H.'L. Abercrombie, Sequoyah Nuclear Plant

Site Director

P. R. Wallace, Plant Manager

J. W. Anderson, Manager

Office of Quality Assurance

K. W. Whitt, Chief, Nuclear Safety Staff

D. L. Williams, Jr., Supervisor

Licensing Section

J. E. Wills, Project Engineer

bec w/encls:

NRC Resident Inspector

Document Control Desk

State of Tennessee

.

RII

SGC RII RII k' RII RII

RhIcp f $ $

HChristenson:sa BDebs CJD1/ AG h on

J

S DVerrelli

07/sv8s 07/3(/8s o /s dry (/8s oti/ es 07/ /8s