Responds to NRC 850530 Requests to Include Independent Onsite Safety Review Group & Vice President of Each Nuclear Div in Inline LER Review.Addl Reviewers Unnecessary.Review Exceeds Generic Ltr 84-43 & Rev 3 to NUREG-0123
ML20133M551
Person / Time
Site: Oyster Creek
Issue date: 10/21/1985
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0123, RTR-NUREG-123 GL-84-43, NUDOCS 8510280126
Download: ML20133M551 (2)


Text

n o

. GPU Nuclear Corporation

' gg g{ Post Office Box 388 Route 9 South Forked River, New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number

Mr. John A. Zwolinski, Chief October 21, 1985 Operating Reactors Branch No. 5 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Zwolinski:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Reporting Requirements of 10CFRSO 72 and 50.73

Reference:

NRC letter dated May 30, 1985 - J. A. Zwolinski to P. B.

Fiedler (GPUN)

This letter is in response to three (3) requests identified in your letter of May 30,1985.

The first two requests address the inclusion of the Independent On-Site Safety Review Group (IOSRG) and the Vice President of eacn GPU Nuclear Division into the in-line review of the Licensee Event Reports (LERs). It is GPUN's Delief that this would be an unnecessary addition to the existing review cycle. The existing Oyster Creek License, Technical Specifications, and/or the resultant implementing procedures require LERs to be reviewed by:

1. A Responsible Tecnnical Reviewer who is a knowledgeable individual other than the individual (s)/ group which performed the investigation; and
2. A qualified Independent Safety Reviewer wno does not have direct responsibility for the performance of the activities under review.

Tne Technical Specifications also require that:

1. Each reportable event be reported to the cognizant manager, the cognizant division Vice President, and the Vice President and Director Oyster Creek; and
2. Copies of all such reports shall be submitted to the functionally cognizant division Vice President and the Vice President and Director Oyster Creek.

GPUN believes that this review process encompasses and exceeds the criteria of both Generic Letter 84-43 and NUREG 0123, Rev. 3 (BWR Standard Technical Specifications).

Rh 2pgg ggg, P

GPU Nuclear Corporation is a subsidiary of the General Pubhc Utihties Corporation

Mr. John Zwolinski, Chief U.S. Nuclear Regulatory Commission PAGE 2 The 10SRG was created to perform a selective overview function for matters involving safe operation. The addition of the 10SRG to the in-line retiew would add an additional administrative load which may jeopardize the selection of other subjects they deem necessary to review. Our intent is to maintain the selectiveness of the overview function. The 10SRG at Oyster Creek is however, on distribution for all LERs submitted to the NRC from Oyster Creek and may, by Technical Specification 6.5.4.3(5), review any and all the LERs to whatever extent the Manager-Nuclear Safety deems appropriate.

The third request was for GPUN to change the wording of Technical Specification 6.10.1.c. from " Reportable occurrence reports" to "All Reportable Events". GPUN concurs that this change in wording is appropriate.

A future Technical Specification Change will be requested to incorporate the nomenclature changes.

If there are any questions please contact Mr. Michael Laggart at (201) 299-2341.

Very truly yours, b

gs g sh J -- -

Vice President and Director Oyster Creek PBF:MWL:gpa 2347f/001 cc: Dr. Thomas E. Murley, Administrator Region i U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Mr. Jack N. Donohew, Jr.

U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue, Phillips Bldg.

Bethesday, MD 20014 Mail Stop No. 314 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731