_

t Cciling Addrsss Alabama Power Company 600 North 18th Street Post Off*ce Box 2ti41 Birmingham, Atabama 35291 Tefephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintndge Dailding fM3l)3[ll3 EOWCf i

October 16, 1985

~

Docket Nos. 50-348 50-364 l

Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Technical Support Center (TSC)

Safety Parameter Display System (SPDS)

Display Implementation Plan Gentlemen:

By letter dated November 30, 1984, Alabama Power Company committed to provide a TSC SPDS Display Implementation Plan for Farley Nuclear Plant in October 1985.

In accordance with this commitment, the TSC SPDS Display Implementation Plan is attached.

}

If you have any questions, please advise.

Yours very tr yQ a '/2i nJ R. P. tic 00nald RPM /JLO:ddb-D36 Attachment cc: Mr. L. B. Long i

Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford

(

%k DOC DR

\\

8000 8l s

_ =.

_ _ _ - _ = _ _ _ _ _ _

I i

Attachment i

TSC SPOS Display Implementation Plan Alabama Power Company will install two SPDS Cathode Ray Tubes (CRTs) with full function keyboards in the TSC. One CRT and keyboard i

will be located on the Operations Manager's desk. The other CRT and I

keyboard will be located on the NRC desk. Both of these CRTs will be i

able to display either Farley Nuclear Plant Unit 1 or Unit 2 parameters.

Cable routing to the above designated locations has been completed. Prior to the initiation of SPDS site acceptance testing, the CRTs will be installed at the Operation Manager's and NRC's desks. A i

schedule for TSC display operability will be provided with the November i

1985 Alabama Power Company Emergency Response Capability Schedule transmittal.