Forwards Insp Repts 50-424/85-32 & 50-425/85-27 on 850716-19.No Violations or Deviations Noted
ML20133M299
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/01/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20133M303 List:
References
NUDOCS 8508130081
Download: ML20133M299 (3)


See also: IR 05000424/1985032

Text

.

"

.

flW

.

I AUG1 1985

l

Georgia Power Company

'

n/ ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT NOS. 50-424/85-32 AND 50-425/85-27

On July 16-19, 1985, NRC inspected activities authorized by NRC Construction

At the

Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility.

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Within these

Areas examined during the inspection are identified in the report.

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

\S\

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-424/85-32

and 50-425/85-27

cc w/ encl:

LR. E. Conway, Senior Vice President

Nuclear Power

L O. O. Foster, Vice President

and General Manager Vogtle Project

cc w/ encl: (Cont'd see page 2)

0500130001

DN 050003

g ADOCK 0D000424

PDH

  • (

ZE6l

-

PS

-

.

AUG1 1985

Georgia Power Company 2

l

- l

gc w/ enc 1: (cont'd)

UH. H. Gregory, III, General

, Manager, Vogtle Nuclear Construction

LG. Bockhold, Jr., Vogtle

Plant Manager

pt'. T. Gucwa, Chief

Nuclear Engineer

t Ruble A. Thomas,

Vice President-Licensing Vogtle

.

Project

cEd Groover, Quality

, Assurance Site Manager

cC! W. Hayes, QA Manager

vf. T. Beckham, Vice President

& General Manager - Operations

uf. A. Bailey, Project Licensing

Manager

vGeorge F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge

c8'ruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge

vErnest L. Blake, Jr., Esq.

,Shaw, Pittman, Potts and Trowbridge

udames E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

James G. Ledbetter, Comissioner

Department of Human Resources

Charles H. Badger, Office of

Planning and Budget, Management

Review Division

-Deppish Kirkland, III, Counsel

Office of the Consumer's Utility

Council

gDouglas C. Teper, Georgians Against

Nuclear Energy

vlaurie Fowler, Esq., Legal Environmental

/ Assistance Foundation

viim Johnson, Executive Director

Educational Campaign for a Prosperous

Georgia

vMorton B. Margulies, Esq., Chairman

Administrative Judge, Atomic Safety

and Licensing Board Panel

v0r. Oscar H. Paris, Administrative Judge

Atomic Safety and Licensing Board Panel

'

Jiustave A. Linenberger, Jr., Administrative

Judge, Atomic Safety and Licensing Board

Panel

bec w/ enc 1: (Seepage 3)

D4

-

..

~ Georgia Power Company 3 AUG1 1985

bJc w/ encl:

GE..Reis, ELD

'M. Sinkule RII

J RC Resident Inspector

Document Control Desk

State of Georgia

MDHunt TEconlon ARHe

07/p/85 85 5[

07/p/85