ML20133M214

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-423/OL-85-15 of Exam Administered During Wks of 850513 & 20
ML20133M214
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/06/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20133M216 List:
References
NUDOCS 8508130045
Download: ML20133M214 (2)


Text

I ,

r ' y, ,. -. . .

AUG6 1985 Docket No. 50-423 Northeast Nuclear Energy Company ATTN: Mr. J. F. Opeka Senior Vice President - Nuclear Engineering and Operations Group P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

Subject:

Examination Report No. 50-423/85-15 (OL)

This transmits the Examination Report of Operator Licensing Examinations conducted by USNRC Region I at the Millstone 3 Nuclear Power Station the weeks of May 13 and May 20, 1985. At the exit interview held on May 23, 1985, the

. preliminary ~ results of these examinations were discussed. Nearly one half of the candidates exhibited an inability to properly diagnose incidents and take the proper corrective actions. At a management meeting held in Region I on July 8,1985, the results of the examination. were discussed and are documented in Meeting Report 50-423/85-40.

No reply to this letter is required. Your cooperation in this matter is appreciated.

Sincerely,

~

Or$cinalSicaa57 {

Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects

Enclosure:

Examination Report No. 50-423/85-15 (OL) w/ attachments cc w/ enclosure.and attachments:

W. Romberg, Plant Superintendent R. Stotts, Plant Training Manager

' Senior Resident Inspector Public Document Room (PDR)

Local Public Document Room (LPOR)

Nuclear Safety.Information Center (NSIC)

State of Connect'icut 8508130045 850806 PDR ADOCK 05000423-G PDR OFFICIAL RECORD COPY OL 50-423/85 0001.0.0 -

07/17/85 2 g,A[g a

. Northeast Nuclear Energy Company 2 cc w/ enclosure:

V. Papadopoli, Construction Quality Assurance Supervisor E. R. Foster, Director of Generation Construction E. J. Mroczka, Vice President, Nuclear Operations D. O. Nordquist, Manager of Quality Assurance R. T. Laudenat, Manager, Generation Facilities Licensing bec w/o attachment to enclosure:

Region I Docket Room (with concurrences)

DRP Section Chief Acting Chief, OLB/DHFS, NRR OL File 12.0 Plant File Master Exam File D. Weiss, LFMB A. Vinnola, EGG t

e @4 RI:DRP Ru i to/mjd RI:DRP Jo en R J#

fr (G

.1.TRP Kister RI:DRP McCabe RI:DRP Wenzinger q [

7//h/85 7/3c/85 7 h85 llO85 0/ 5/85 Of /85 0FFICIAL RECORD COPY OL 50-423/85 0002.0.0 07/16/85 km__