Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0261998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 1.With 990115 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr ML18106A9831998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 2.With 981214 Ltr ML18106A9801998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 1.With 981214 Ltr ML18106A9641998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 2. with 981112 Ltr ML18106A9631998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 1. with 981112 Ltr ML18106A9151998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 2.With 981012 Ltr ML18106A9131998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 1.With 981012 Ltr ML18106A8751998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Generating Station,Unit 2.With 980915 Ltr ML18106A8741998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Unit 1.With 980915 Ltr ML18106A8161998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 1. W/980817 Ltr ML18106A8151998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 2. W/980817 Ltr ML18106A7151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 2. W/980715 Ltr ML18106A7141998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 1. W/980715 Ltr ML18106A6541998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 1. W/980615 Ltr ML18106A6531998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 2. W/980615 Ltr ML18106A6121998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Generating Station,Unit 1.W/980515 Ltr ML18106A6111998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Unit 2. W/980515 Ltr ML18106A5561998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem,Unit 1. W/980415 Ltr ML18106A4591998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem Unit 2. W/980415 Ltr ML18106A3771998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 1.W/980316 Ltr ML18106A3761998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 2.W/980316 Ltr ML18106A3281998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 2. W/980217 Ltr ML18106A3271998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 1. W/980217 Ltr ML18106A2721997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem,Unit 2. W/980115 Ltr ML18106A2711997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem Generating Station,Unit 1.W/980115 Ltr ML18106A2081997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 1. W/971212 Ltr ML18106A2071997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 2. W/971212 Ltr ML18102B6811997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 2.W/ 971117 Ltr ML18102B6801997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 1.W/ 971117 Ltr ML18102B6271997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Salem,Unit 2. W/971015 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A5201999-08-12012 August 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A5211999-07-0101 July 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A3151999-04-30030 April 1999 Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18107A2881999-04-0707 April 1999 Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18106B1471999-03-29029 March 1999 LER 99-001-00:on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with 990329 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0701999-02-16016 February 1999 LER 98-015-00:on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With 990216 Ltr ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML20205P1671999-01-31031 January 1999 a POST-PLUME Phase, Federal Participation Exercise ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML18106B0491999-01-28028 January 1999 LER 98-007-01:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With 990128 Ltr ML18106B0401999-01-18018 January 1999 LER 98-016-00:on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With 990118 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr 1999-09-30
[Table view] |
Text
, __ . _ _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . __ _____-___
'e
- AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-272 Unit Name Salem # 1 Date October 10,1985 Completed by Pell White Telephone 609-935-6000 Extension 4455 Month September 1985 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 1105 17 1083 2 1061 18 1071 3 1064 19 1078 4 1067 20 1072 5 1059 21 1057 6 1060 22 1067 7 1056 23 1080 8 1058 24 1089 9 1045 25 1090 10 1062 26 1083 11 1050 27 822 12 1061 28 688 13 1066 29 957 14 1089 30 1094 15 1094 31 16 1074 P. 8.1-7 R1 8510240396 850930 PDR ADOCK 0500ggj2 Ig>/1 1
OPERATING DATA REPORT Docket No.50-272 Date October 10, 1985 Telephone 935-6000 Completed by Pell White Extension 4455 Operating Status
- 1. Unit Name Salem No. 1 Notes
- 2. Reporting Period September 1985
- 3. Licensed Thermal Power (MWt) 3338
- 4. Nameplate Rating (Gross MWe) 1170
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity (Gross MWe)1124
- 7. Maximum Dependable Capacity (Net MWe) 1079
- 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
- 9. Power Level to Which Bestricted, if any (Net MWe) N/A
- 10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
- 11. Hours in Reporting Period 720 6551 72360
- 12. No. of Hrs. Reactor was Critical 720 6533.6 42357.1
- 13. Reactor Reserve Shutdown Hrs. 0 0 3088.4
- 14. Hours Generator On-Line 720 6530.7 40689.3
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (FOGI) 2351246 21698013 124466010
- 17. Gross Elec. Energy Generated (FDGI) 785040 7357750 41273800
- 18. Net Elec. Energy Generated (MWH) 753627 7070558 39168540
- 19. Unit Service Factor 100 99.7 56.2
- 20. Unit Availability Factor 100 99.7 56.2
- 21. Unit Capacity Factor (using MDC Net) 97.0 100 50.2
- 22. Unit Capacity Factor (using DER Net) 96.0 99.0 49.7
- 23. Unit Forced Outage Rate 0 .3 29.5
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
Refueling, March 15, 1986, approximately 60 days
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation) :
Forecast Achieved Initial Criticality 9/30/76 12/11/76 Initial Electricity 11/1/76 12/25/76 Commercial Operation 12/20/76 6/30/77 8-1-7.R2 Page of L
7 UNIT SHUTDOWN AND POWER REDUCTIONS Docket No.50-272 '
REPORT MONTH September 1985 Unit N;me Salen No.1 Date October 10,1985 Completed by Pell White Telephone 609-935-6000
- Extension 4455 Method of Duration Shutting- License Cause and Corrective No. Date Type' Hours Reason Down Event System Component Action to 1 2 Rea cto r Report Code 4 Code 5 Prevent Recurrence Travelling Screen /
Trash Rack /
85-584 0927 F 6.5 A 5 -
HC FILTER Canal Screen Travelling Screen /
Trash Rack /
85-586 0927 F 17.9 A 5 - HC FILTER Canal Screen Travelling Screen /
Trash Rack /
85-588 0928 F 13.9 A 5 - HC FILTER Canal Screen 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara- Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)
r MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-272 REPORT MONTH SEPTEMBER 1985 UNIT NAME: Salem 1 DATE: October 10, 1985 COMPLETED BY: J. Rcnatalvy TELEPHONE: 609/339-4455
- DCR NO. PRINCIPLE SYSTEM SUBJECT 1 EC-19 68 Lighting Replace light fixtures on various areas of the plant.
ISC-1005 Waste Disposal (Gas) Change the type of device on
- 11 and #12 Waste Gas Compressors that monitors separator pressure (1PD1839 for 11 and IPD1842 for 12).
1SC-1429 Fuel llandling (BPRA Replace comb push rods, clevis Tool) and clevis pins, retainers, etc. in accordance with instructions supplied with Westinghouse modification kit.
Design Change Request
(_
MAJOR PLANT MODIFICATIONS DOCKET i,J.: 50-272 REPORT MONTH SEPTEMBER 1985 UNIT NAME: Salem 1 DATE: October 10, 1985 COMPLETED BY: J. Ronafalvy TELEPHONE: 609/339-4455
- DCR NO. SAFETY EVALUATION 10 CFR 50.59 lEC-1968 This design change replaces obsolete lighting fixtures in the Turbine Building. It will not adversely affect any safety related equipment and will not chang, the basis for the Technical Specification. No unreviewed safety or environmental questions are involved.
ISC-1005 The replacement pressure switches meet the original design requirements except for accuracy. They, however, only monitor separator pressure and perform no safety related function. No unreviewed safety or environmental questions are invovled.
1SC-1429 This modification includes replacement of the original comb rods on the 3PRA handling tool with those of heavier gauge parts. It does not reduce the margin of safety as defined in the basis of any Technical Specification. This design change does not increase the probability of occurrence or the consequences of any accident previously evaluated in the FSAR. No unreviewed safety or environmental questions are invovled.
- DCR - Design Change Request w.
.. S i
l PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG ..
SALEM UNIT 1 l
WO NO DEPT UNIT EQUIPMENT 1DENTIFICATION 0099006391 SMD 1 IPS1 FAILURE DESCRIPTION: BODY TO BONNET LEAK THRU MUD HOLE.
CORRECTIVE ACTION: REPUMPED WITH FURMANITE: STILL LEAKS VERY SMALL AMT. STEAM 0099006405 SMD 1 1PS3 FAILURE DESCRIPTION: BODY TO BONNET LEAK.
CORRECTIVE ACTION: RE-PUMP WITH FURMANITE, STILL LEAKS VERY LITTLE STEAM 0099162016 SMD 1 1PS28 FAILURE DESCRIPTION: VALVE HAS PACKING LEAK.
CORRLCTIVE ACTION: FURMANITED VALVE IAW T-169 WO TO BE WRITTEN TO PERFORM PERMANENT REPAIR NEXT OUTAGE l
f l
( SALEM UNIT 1 WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 0099177994 SMD 1 13 SERVICE WATER PUMP FAILURE DESCRIPTION: TiiE PUMP HAS EXCESSIVE PAKCING LEAKAGE CORRECTIVE ACTION: REPACKED PUMP 8507260691 SMD 1 13 CHARGING PUMP FAILURE DESCRIPTION: PUMP IIAS A SEAL LEAK. SEAL TANK OVERFLOWING.
PUMP IS NOT OUT OF SERVICE.
CORRECTIVE ACTION: NEW PLUNGER, PACKING AND GASKETS AND INSPECTED 8508260814 SMD 1 12 CONT. SPRAY PUMP FAILURE DESCRIPTION: THERE IS A SMALL LEAK AT THE DISCHARGE FLANGE.
CORRECTIVE ACTION: REPLACED DISCHARGED FLANGE GASKET 0509030588 SIC 1 LOOP 12 DP'S INDICATION FAILURE DESCRIPTION: LOOP 12 DP IS NOW READING 790 IN. THE OTHER THREE LOOPS ARE AT 660 IN.
CORRECTIVE ACTION: REPLACED FAIRCHILD INDICATOR BECAUSE OF JUMPING EkRATIC READINGS l
3 SALEM UNIT 1 WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 8509170495 SFS 1 1PS28 FAILURE DESCRIPTION: PLEASE HAVE FURMANITE REINJECT 1PS28.
CORRECTIVE ACTION: VALVE PACKING GLAND DID NOT NEED TO BE REINJECTED, BUT WE INSTALLED A BODY TO BONNET CLAMP PEk A DR 8509190283 SMD 1 IPS3 FAILURE DESCRIPTION: HAVE FURMANITE REPAIR BODY TO BONNET LEAK
! ON VALVE IPS3.
CORRECTIVE ACTION: VALVE INJECTED WITH FURMANITE AS PER DR; LEAK STOPPED l 8509220093 SFS 1 llSW127 FAILURE DESCRIPTION: VALVE IS LEAKING SEVERLY OUT OF FLANGE, AROUND BOLT.
CORRECTIVE ACTION: REPAIRED SPOOL PIECES AS PER DR 8509260095 SMD 1 IPS28 FAILURE DESCRIPTION: THE FURMINATE FITTING IS LEAKING STEAM.
I PLEASE REPAIR.
l l CORRECTIVE ACTION: VALVE REINJECTED WITH FURMINATE AS PER DR; LEAK ,
STOPPED l
l
(
SALEM GENERATING STATION MONTiiLY OPERATING
SUMMARY
- UNIT NO. 1 SEPTEMBER 1985 SALEM NO. 1 The Unit began the period operating at full power. On 09/27/85 at 1127 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.288235e-4 months <br /> power was reduced to 43% due to grasses and debris from the river partially clogging the Circ. Water screens. Upon completion of cleaning the screens, Condensate Pump repairs (oil leaks) and strainer cleaning the Unit was returned to 100% power on 11/29/85 at 1324 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.03782e-4 months <br /> where it remained for the rest of the period.
r REFUELING INFOBMATION Docket No. 50-272 Unit Name Salem #1 Date October 10, 1985 Completed by J. Ronafalvy Telephone 609-935-6000 Extension 4455 Month September 1985
- 1. Refueling information has changed from last month:
YES NO X
- 2. Scheduled date of next refueling: February 22, 1986
- 3. Scheduled date for restart following refueling: May 4, 1986
- 4. A. Will Technical Specification changes or other license amendments be required?
YES NO NOT DETERMINED TO DATE B. Has the reload fuel design been reveiwed by the Station Operating Review Committee? YES NO X If no, when is it scheduled? January 1986
- 5. Scheduled date (s) for submitting proposed licensing action:
January 1986, if required
- 6. Important licensing considerations associated with refueling:
NONE
- 7. Number of Fuel Assemblies:
A. Incore 193 B. In Spent Fuel Storage 296
- 8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170
- 9. Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity: September 2001 8-1-7.R4
i .
O PSIEG Pubhc Serum Ehxtrie and Gas Company P O. Box E Hancocks Br idy, New Jersey 08038 Salem Generating Station October 10, 1985 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of September 1985 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Information Sincerely yours,p 1A fc kt) 'l ~
J. M. Zupko, Jr.
General Manager - Salem Operations JR:sbh cc: Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 ,
Enclosures 8-1-7.R4 I