Monthly Operating Rept for Sept 1985
ML20133L962
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/30/1985
From: Ronafalvy J, White P, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8510240387
Download: ML20133L962 (10)


Text

'

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-311 Unit Name Salem # 2 Date October 10,1985 Completed by Pell White Telephone 609-935-6000 Extension 4455 Month September 1985 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 1089 17 1099 2 1097 18 1096 3 1086 19 1099 4 1087 20 1086 5 1097 21 214 6 1080 22 89 7 1081 23 1029 8 1088 24 1101 9 1076 25 1107 10 1093 26 1098 11 1077 27 1108 12 1089 28 1085 13 1076 29 1089 14 1102 30 1081 15 1103 31 16 1092 Pg. 8.1-7 R1 8510 L hl*240387050930ADOCK

"* 05000311  !

+ \ z L .- ,

OPERATING DATA REPORT Docket No. 50-311 Date October 10,1985 Telephone 935-6000 Completed by Pell White Extension 4455 Operating Status

1. Unit Name Salem No. 2 Notes
2. Reporting Period September 1985
3. Licensed Thermal Power (MWt) 3411
4. Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) 1115
6. Maximum Dependable Capacity (Gross MWe)1149
7. Maximum Dependable Capacity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
9. Power Level to Which Restricted, if any (Net MWe) N/A
10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
11. Hours in Reporting Period 720 6551 34776
12. No. of Hrs. Reactor was Critical 692.3 3562 18656.6
13. Reactor Reserve Shutdown Hrs. 0 0 3533.6
14. Hours Generator On-Line 685.1 3280.9 17893
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (FGul) 2315993 10446073 54173109
17. Gross Elec. Energy Generated (FDGI) 771170 3441160 17718810
18. Net Elec. Energy Generated (MWH) 739032 3241771 16759607
19. Unit Serviec Factor 95.2 50.1 31.5
20. Unit Availability Factor 95.2 50.1 51.5
21. Unit Capacity Factor (using MDC Net) 92.8 44.7 43.6
22. Unit Capacity Factor (using DER Net) 92.1 44.4 43.2
23. Unit Forced Outage Rate 4.8 47.2 39.2
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

N/A

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation) :

Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 8-1-7.R2 L j

r- o 3 '

~

. UNIT. SHUTDOWN AND POWER REDUCTIONS.

IDock2t No..L50-311 l --  : REPORT MONTH Snptember 1985- Unit Nama' Solnm No.2 Date: October 10,1985:

Completed .by J.P. Ronafalvy- Telephone 609-935-6000 Extension 4455:

Method of Duration- Shutting .Licenset .

Cause and Corrective No. Date LType. 1 Hours' Reason- .Down~ . Event. System Component. .. Action to 1 2- Rea cto r Report Code 4 Code 5 Prevent Recurrence Pressurizer Spray Valves Reactor.

! 85-236- 0921 F 34.9 A 1 -

CJ VESSEL Coolant i.

l l

1 l' 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: I Forced . A-Equipment-Failure-explain 1-Manual Instructions Salem as-S: Scheduled B-Maintenance or Test 2-Manual Scram.. for Prepara- ' Source ~

C-Refueling 3-Automatic Scram. tion of Data' D-Regulatory Restriction 4-Continuation of . Entry Sheets E-Operator-Training l&1 Licensing Exam Previous Outage for Licensee.

~

.F-Administrative-5-Load. Reduction Event Report G-Operational Error-explain- 9-Other~ (LER) File"

' H-Other-explain . (NUREG 0161)

MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-311 REPORT MONTH SEPTEMBER 1985 UNIT NAME: Salem 2 DATE: October 10, 1985

. COMPLETED BY: J. Ronafalvy TELEPHONE: 609/339-4455

  • DCR NO. PRINCIPLE SYSTEM SUBJECT 2EC-1782 Drains / Sump Pumps Replace No. 23 Turbine Area Sump Pump with a submersible type slurry pump of different design and materials.

i

  • Design Change Request I

\

L

MAJOR, PLANT MODIFICATIONS DOCKET NO.: 50-311 REPORT MONTH SEPTEMBER 1985 UNIT.NAME: Salem 2 DATE: October 10, 1985 COMPLETED BY: J. Ronatalvy TELEPHONE: 609/339-4455

  • DCR NO. 10CFR 50.59 SAFETY EVALUATION 2EC-1782 This DCP replaces the number 23 Turbine Generator Area Sump Pump from a 5 HP vertical sump pump to a 10 HP slurry pump. The electrical package routes new cable to the 10 HP motor. The associated motor control center is revised for the new motor. No unreviewed safety or environmental questions are involved.

Design Change Request i

L _

s PSE&G SALEM GENERATING STATION ..

SAFETY RELATED WORK ORDER LOG SALEM UNIT 2 WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 0099178966 SIC 2 CONT SUMP LEVEL FAILURE DESCRIPTION: THE CONT SUMP RECORDER IS NOT FUNCTIONING PROPERLY.

CORRECTIVE ACTION: REPLACED BAD FAN, BROKEN MARING FILTER, AND BAD OPTION BOARD 0099179148 SMD 2 24 FAN COIL UNIT FAILURE DESCRIPTION: THE MOTOR TURNS BUT THE FAN DOES NOT.

THE COUPLING IS BROKEN.

CORRECTIVE ACTION: REPLACED COUPLING BETWEEN FAN AND MOTOR AND SET SCREWS KEY 8507090672 SMD 2 22 CC PP FAILURE DESCRIPTION: BOTH BEARINGS ON THE COMPONENT COOLING PUMP LEAK OIL, APPEARS TO BE FROM THE SEALS.

CORRECTIVE ACTION: REPLACED SEALS AND REBUILT PUMP 8509110735 SMD 2 SERVICE WATER LEAK FAILURE DESCRIPTION: THERE IS A SERVICE WATER LEAK ON 23 CONTAINMENT FAN COIL UNIT ON THE VENT FLANGE ON THE TOP OF THE FAN COIL UNIT.

CORRECTIVE ACTION: INSTALLED NEW PIPE FLANGE AS PER DR

R E

2 T D O N T N I I L N L Y U L C I

M E

W L 2

L R A E N S D O N

I P L M Y U C P L N 2 O I

N T O C E

R J E N G I N

U L L . E PY U L F KE CE D AR E RF C A

LE L EV P N UO E O FM R I

T A  :

C N I O  :

F I N I T O T P I N I T E R C D C A I S E E T L D V N E I E S E T M E R C P I U E I D L R U I R Q C A O E 2 F C T

I 2 N

U T D P M E 8S D 1 2

0 2

O 1 N 9 0

O 5 W 8 r -

o .

SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT NO. 2 SEPTEMBER 1985 S ALEM UNIT NO. 2 The Unit began the period operating at full power. On 9/21/85 at 0523 hours0.00605 days <br />0.145 hours <br />8.647487e-4 weeks <br />1.990015e-4 months <br /> the Unit was manually tripped due to a significant drop in Pressurizer pressure which was caused by Pressurizer Spray Valve 2PS3 not fully reseating. On 9/22/85 at 1622 hours0.0188 days <br />0.451 hours <br />0.00268 weeks <br />6.17171e-4 months <br />, the Unit was brought back on line and returned to 100% power where it remained for the rest of the period, i

i 1

j

s REFUELING INFORMATION DOCKET NO.: 50-311 COMPLETED BY: J. Ronafalvy UNIT NA!!E: Salem 2 DATE: October 10, 1985 TELEPHONE: 609/935-6000 EXTENSION: 4455 Month September 1985

1. Refueling information has changed from last month:

YES NO X

2. Scheduled date for next refueling: September 6, 1986
3. Scheduled date for restart following refueling: November 16, 1986
4. A) Will Technical Specification changes or other license amendments be required?

YES NO Not determined to date B) Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X If no, when is it scheduled? August 1986

5. Scheduled date (s) for submitting proposed licensing action:

August 1986 if required

6. Important licensing considerations associated with refueling:

NONE

7. Number of Fuel Assemblies:

A) Incore 193 B) In Spent Fuel Storage 140

8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170
9. Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity: March 2003 8-1-7.R4 I

w

'~

T

, . . o O PSEG Pubhc Senice Eiectric and Gas Compans, P O. Box E Hancocks Bridje. New Jersey Ot1033 Salem Generating Station October 10, 1985 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specification, 10 copies of the following monthly operating reports for the month of September 1985 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Information Sincerely yours, 4' b [t)

  • J. M. Zupko, Jr.

General Manager - Salem Operations JR:sbh cc: Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management .

Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures 8-1-7.R4 I