Proposed Tech Specs Reflecting Deferral of Installation of Automatic Depressurization Sys Air Receiver Pressure Indication in Control Room to Second Refueling Outage
ML20133K970
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/11/1985
From:
MISSISSIPPI POWER & LIGHT CO.
To:
Shared Package
ML20133K968 List:
References
NUDOCS 8510220366
Download: ML20133K970 (1)


Text

.

i

! covering the use of the manual inhibit switch, proposed

~

Technical Specification surveillance procedures for the timer and switch, and shall implement alternative logic 4

tsodification(Option 4)oftheautomaticdepressurization system.

(g)

QualificationofADSAccumulators(II.K.3.28,SSER#5)

Prior to startup following the first refueling outage.

MP&L shall perform an integrated leak test on the ADS air system, oerfonn samolina to establish instrument air qualityJprovide instrumentation to monitor AD5 airJ (Teceiver pressure) establish suitable surveillance pro-cedures for the ADS air system and provide proposed j

changes to the Technical Specifications associated with i

the surveillance procedures.

N.c 4. ee.% e 4 g +o po A N Ne.amd < de.b e %e.; y 3

N RT-

?

SRV Test Program (Section A-39 Appendix C. SER, $$ER fl. SSER #2)

(34)

During Cycle 1, an inplant SRV test program shall be carried out to confinn that the containment building response to SRV loads is acceptable. Results of these tests shall be provided to NRC no later than four months after test completion.

(35) Post-LOCA Vacuum Breaker Position Indicators Prior to startup following the first refueling outage, MP&L shall j

i install position indicators with redundant indication and alarm

'7 in the control room for the check valves associated with the dry-well post-LOCA vacuum breakers.

I (36) EmergencyResponseFacilities(GenericLetter82-33,NUREG-0737 1

l 5upp'ement 1, 55ER d5) i ll MP&L shall complete the emergency response capabilities as required l

by Attachment 1 to this license.

(37) Evaluation of Licensee's Technical Specification Problem sheets l

(Section 16.J. 55ER #6)

,s f

Prior to startup following the first refueling outage MP&L shall l

I l

implement the following modifications:

l 1

(a)

Include an emergency override of the test mode of the

[

Division 3 HPCS diesel generator to pennit response to emergency signals and to return the control of the diesel generatortotheemergencystandbymode.

(ItemNo.333,

[

T.S. 4.8.1.1.2.d.12.bJ.

l l

[

I i

i 8510220366 851011 DR ADOCK O 4y6

. - -