Text
-
.
OCT 171985
Docket No. 50-409
Dairyland Power Cooperative
ATTN: Mr. J. W. Taylor
General Manager
2615 East Avenue - South
La Crosse, WI 54601
Gentlemen:
This refers to the routine safety inspection conducted by Mr. R. A. Westberg of
this office on September 16 through October 4,1985, of activities at the
La Crosse Boiling Water Reactor authorized by NRC Operating License No. DPR-45 and
to the discussion of our findings with Mr. G. S. Boyd and others of your staff at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and interviews
with personnel.
Although no violations of NRC requirements were identified during the course of
this inspection, an unresolved item was identified relative to the thoroughness
of auditing the maintenance work request system. Based on this item and a
cursory review of audits in other disciplines, we are concerned that audits, in
general, may not be of sufficient depth. Because of the importance that se place
on audits as a means of assuring quality, we request that you respond to this
issue and specifically address the actions that you have taken or plan to take to
assure that audits are adequately comprehensive in all areas.
In accordance with 10 CFR 2.790 of the Coninission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC's Public
Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,n
-
60
/.
J (L L LLL '
,I
C. J Pape iello, Director
Division of Reactor Safety
Enclosure:
Inspection Report
No. 50-409/85014(DRS)
See Attached List For Distribution
goTAM%k
O
/$0f
l
(
-_
_-
-.
.- -
_ .
._.
,
.
Dairyland Power Cooperative
2
OCT 171985
Distribution
cc w/ enclosure:
J. Parkyn, Plant Superintendent
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Ness Flores, Chairperson
Wisconsin Public Service
Commission
Spark Burmaster, Coulee
Region Energy Coalition
F
Q}l
f
Wesiberg/ls
Vahdel
Hawkihs ) Bo'yd
Rpygs
a
riello
10/16/85
{
' gop1
y,' j
fp