ML20133K756

From kanterella
Jump to navigation Jump to search
Forwards Rev 9 to Security Plan,Incorporating Unit 2 Into Protected Area,Addressing Deletion of Interim Barrier Between Units Used During Const & Superseding 10CFR73.67.Rev Withheld (Ref 10CFR73.21)
ML20133K756
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/16/1985
From: Tucker H
DUKE POWER CO.
To: Harold Denton
NRC OFFICE OF ADMINISTRATION (ADM), Office of Nuclear Reactor Regulation
References
NUDOCS 8510220289
Download: ML20133K756 (2)


Text

- - SfEGUAR]S IN70RMAliON Duxu Pownn G(nmm P.O. H O X 3 318 0 CHAMLOTTE, N.C. 28242 HAL B.11.'CKER Tenzrnome m2.~[1 October 16, 1985 " " "

Mr. Harold R. Denton, Director

  • CLASSt IED BY:

Office of Nuclear Reactor Regulation h,", -

' mg U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T;Ti. E _ EdsleE m.~.AN'ZATION:MMda- MIM b Attention: Document Control Desk ,j gy

Subject:

Catawba Nuclear Station Docket Nos. 50-413 and 50-414 Security Plan, Revision 9

Dear Mr. Denton:

Pursuant to 10 CFR 50.54(p), please find attached five_(5) copies of Revision 9 to the Catawba Nuclear Station Security Plan. Revision 9 was developed to-incorporate Unit 2 into the Protected Area, address the deletion of the Interim Barrier between Units 1 and 2 used during construction of Unit 2 and to supersede 10 CFR 73.67 as to the Unit 2 Fuel Storage Plan. Specific plan changes are addressed in the. attachment.

Revision 9 does not decrease the ef fectiveness of the Catawba Nuclear Station Security Plan.

This material is applicabic to security provisions at Catawba Nuclear Station; therefore, Duke requests that this material be withheld from public disclosure pursuant to 10 CFR 73.21. ,

Very truly yours, pg # 4 'h ilES 000L'MU:T CONTAINS NECUARDS liiF0MMI'0:t

":Y PERSON VS!0 ALLOWS UtiAUTi!3TZED DISELCSURE ~

Hal B. Tucker YAY DE GullTY OF A CRIME: AND UPON 00* ViCil03

nY BE PUN!SHED BY A fitiE 03 !MPRIS0?NENT JWD: sib OR DOTH UNDER THE PROVISIONS OF 10 CFR 7383 Attachments cc: w/ attachment '

Dr. J. Nelson Grace, Regional Administrator' U. S. Nuclear Regulatory Commission ,

Region 11 P. O. Box 2203 Atlanta, Georgia 30301 l

WHEN SEPARATED FROTA ENCLOSURES HANDLE THfS DOCUI.!ENT AS DECONTROLLE l 8510220289 851016 l PDR ADOCK 05000413 ,

F PDR j k oN l SAEGiAUS E0 HAT 0V:. C6

\

u _ _ - , _ _ _ __ --

. / '

SA:EGUARDS NFORMATON C1 Mr. Esrold R. Denton, Director October 16, 1985 Page Two bec: 'w/o attachment Mr. P. H. Skinner

.NRC Resident Inspector Catawba Nuclear Station Rober: Guild, Esq.

P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 2135h Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 T;i!S C000 MENT C0ilTAINS SAFEGUARDS liiFORMATION.

f.NY PERSON Y.'HO AL10WS UNAUTIID31 ZED DISCLOSU3E MAY BE CullTY OF A CR!ME: AND UPON Cm"/ICil0H iaAY BE PUNISHED BY A flNE OR IMPRIS0hMENT OR BOTH Uf! DER THE PROV!S!CNS OF 10 CFR 73 80 LE H S DOCUMEf DEC TP3 LE9' i

SAFEGL AR)S N~01MA"0V i 1

i- -  ?