ML20133K247
| ML20133K247 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/30/1985 |
| From: | Nix H GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| LR-MGR-130-0785, LR-MGR-130-785, NUDOCS 8508120172 | |
| Download: ML20133K247 (1) | |
Text
Geor0ia Power Company Post Offica Ccx 439 Baxley, Georgia 31513 Telephone 912 367-7781 912 537-9444 Edwin 1. Hatch Nuclear Plant July 30, 1985 LR-MGR-130-0785 PLANT E. I. HATCH Correction of Monthly Operating Report for June 1985 Director Office of Inspection and Enforcement United' States Nuclear Regulatory Commission Region II Suite 3100 101 Marietta Street Washington, D. C.
20555 In the June 1985 Monthly Operating Report for Hatch Unit One, Docket 50-321, it was incorrectly reported that on June 27, 1985 the unit was manually scrammed because of the loss of both A&B 4160V busses.
- However, further intestigation revealed that an automatic scram signal was received approximately one half second prior to the reactor operator actuating the manual scram.
Please note this change in the Narrative Report and in the Unit Shutdowns and Power Reductions Report.
I If you have any questions please contact me at (912) 367-7851.
/
H.
C.
Nix General Manager
( W S2d - g 7
HCN/CTJ/ GAG /EZW/JHR/bb xc: T. V. Greene File A
B508120172 850730 h
PDR ADOCK 05000321 R
...t.
- v
[
l l '
A a
1' 4
-eO
- lt Il sd l },~, [ ] ),
f *'
- {} j -- c 4,
~
t
=
J. ) D,
,1
.)
- g, * ** L
't.
e e
i m.
N
=
, L L
h
(-
s b,
e f
W.-
9 m
l