ML20133J609
| ML20133J609 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/08/1985 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Williams J FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8510180542 | |
| Download: ML20133J609 (2) | |
Text
,
O
($
OCT 3 E35 F1 'rida Power and Light Company TN: Mr. J. W. Williams, Jr.
Group Vice President Nuclear Energy Departmenc P. O. Box 14000 Juno Beach, FL 33408 Gentlemen:
SUBJECT:
CONFIRMATION OF MEETING - TURKEY POINT - DOCKET NOS. 50-250 AND 50-251 This confims the telephone conversation between Mr. C. O. Woody of your staff and Mr. S. A. Elrod of my staff on September 24, 1985, concerning an enforcement conference to be held at the Region II Office at 2:00 p.m., on October 9,1985.
We requested this meeting to discuss the Turkey Point Units 3 and 4 turbine runback systems and the reporting thereof.
9 Should you have any questions regarding these arrangements, we will be pleased to discuss them.
Sincerely, Is/ W %
J. Nelson Grace Regional Administrator
Enclosure:
Proposed Meeting Agenda
,ccp / encl:
W. O. Woody, Vice President, Operations W M. Wethy, Vice President Turkey Point Nuclear Plant tC< J. Baker, Plant Manager
, Jurkey Point Nuclear Plant W. J. Acosta, Plant QA Superintendent b
w/ encl:
C Resident Inspector Document Control Desk Commonwealth of Virginia 4
RII RII RI)
RI RI RI I
fif Sbf ON'e/
~
GRJen ins
'Ishinski l
S5u6nther:ht SAElrod V
ownlee R
ik r AFGi on j
in 3f /85 lof )/85
- /85 gog /85 ig /85 ggp5 10/f45 r
1 p
8510180542 851008 j
PDR ADOCK 05000250 P
PDR I
(
(
O OCT SN ENCLOSURE PROPOSED MEETING AGENDA FLORIDA POWER AND LIGHT COMPANY MEETING WITH NRC OCTOBER 9, 1985 I.
Introduction J. Nelson Grace II.
Turbine Runback System Modification C. O. Woody and Reporting III.
Closing Remarks Roger D. Walker l
!