ML20133J393

From kanterella
Jump to navigation Jump to search
Forwards Emergency Plan Implementation Appraisal 50-423/85-39 on 850722-26.No Violation Noted
ML20133J393
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/10/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20133J396 List:
References
TASK-3.A.1.2, TASK-TM TAC-45959, NUDOCS 8510180411
Download: ML20133J393 (2)


See also: IR 05000423/1985039

Text

P

.

,

00T l' 585

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Inspection No. 50-423/85-39

An Emergency Plan Implementation Appraisal was conducted by Mr. W.' Lazarus and

others of this office on July 22-26, 1985 at the Millstone Unit 3 Nuclear

Power Station, Waterford, Connecticut. A follow-up meeting was held at the

NRC Region I office on August 1,1985 to discuss resolution of issues raised

during the appraisal.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations of the inspectors.

Within the scope of this inspection, no violations were identified and no

response to this letter is necessary.

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By

b- "h

Thomas T. Martin, Director

. Division of Radiation Safety

and Safeguards

Enclosure: NRC Region i Inspection Report No. 50-423/85-39

0FFICI AL RECORD COPY

fg/3s/

8510180411 851010

'

DR ADOCK 05000423

PDR

)l\

L

e

,, -,

-

  • .

,

.

Northeast Nuclear Energy Co. 2

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

Local Public Document Rocm (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encl)

DRP Section Chief

G. Walton, SRI, BV-2

T. Shediosky, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

FEMA Region I

RI:DRSS RI:DRSS RI:DRSS RI: S

ar s/ca/ms J g er Bellamy TMar in

10' / /85 10/@/85 10/ 7 /85 10/ /85

0FFICIAL REo0RD COPY IR MILL 3 - 0002.0.0

10/02/85

m