ML20133H549

From kanterella
Jump to navigation Jump to search
Discusses Util Re Installation of Second Lined Startup Pond Adjacent to First Lined Startup Pond for Storing Addl Chemical Cleaning Wastes.No Environ Action Required Since Station Discharges Unchanged
ML20133H549
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/15/1985
From: Adensam E
Office of Nuclear Reactor Regulation
To: Foster D
GEORGIA POWER CO.
References
NUDOCS 8510180004
Download: ML20133H549 (2)


Text

,

October 15, 1985 DIST_RIRllTION:

J) octet Nos. 50-424/425 Docket Nos: 50-424 NRC PDR and 50-425 Local PDR PRC System LB #4 r/f Mr. Donald O. Foster EAdensam Vice President and General Manager MDuncan Georgia Power Company MMiller P.O. Box 299A, Route 2 RSamworth Waynesboro, Georgia 30830 RBallard Attorney, OELD

Dear Mr. Foster:

JPartlow BGrines

Subject:

Vogtle Second lined Startup Pond EJordan ACRS (16)

By letter dated October 4,1985, your staff informed us of the installation of

! a second lined startup pond adjacent to the first lined startup pond for the purpose of storing additional chemical cleaning wastes. The staff has reviewed this information and the schematic showing the new pond's location and con-cludes that no environmental action is required on our part because the pond is located on an already-cleared area of the site and because there will be no change to station discharges.

If there are any questions on this matter, contact the Project Manager, Melanie Miller, at (301) 492-4259.

Sincerely, original Signed by Kahtan N. Jabbour for Elinor G. Adensam, Chief licensing Branch No. 4 Division of Licensing cc: See next page 1

l 0510100004 051015 PDR ADOCK050g4 A f DL:Qy(//)

(

DiEB El . ' '

)hh DL:LB#4h/

MMillb.f/hmc MDd:LAQhB#4 h an RSamworth RBal Tard EAdensaml 10/$/85 10// /85 10//o/85 10//s/85 10/// /85 I _ _ _ . _ - _ _ _ _ _

Mr. Donald Foster Georgia Power Company Vogtle Electric Generating Plant cc:

Mr. L. T. Gucwa Resident inspector Chief Nuclear Engineer Nuclear Regulatory Comission Georgia Pewer Company P. O. Box 572 ,

P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, !!!, Counsel j Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council j Georgia Power Company / Suite 225 Southern Company Services, Inc. 32 Peachtree Street, N.W.

i P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. R. E. Conway Troutman, Sanders, Lockerman,

, Senior Vice President - Nuclear & Ashmore Power Candler Building Georgia Power Company 127 Peachtree Street, N.E.

1 P.O. Box 4545 Atlanta, Georgia 30303 l Atlanta, Georgia 30302 Douglas C. Teper Mr. J. A. Bailey Georgians Against Nuclear Energy Project Licensing Manager 1253 Lenox Circle Southern Company Services, Inc. Atlanta, Georgia 30306 P.O. Box 2625 Birmingham, Alabama 35202 Laurie Fowler, Esq.

1 218 Flora Avenue, N.W.

! Ernest L. Blake, Jr. Atlanta, Georgia 30307 Bruce W. Churchill, Esq.

) Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D. C. 20036

! Tim Johnson Mr. G. Bockhold, Jr. Executive Director

Vogtle Plant Manager Educational Campaign for l Georgia Power Company a Prosperous Georgia i

Route 2. Box 299-A 175 Trinity Avenue, S.W.

Waynesboro, Georgia 30830 Atlanta, Georgia 30303 i Regional Administrator, Region !!

1 U.S. Nuclear Regulatory Comission i

101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 i

>