ML20133H169
| ML20133H169 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/31/1985 |
| From: | Hutchison L, Powers C WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8508090214 | |
| Download: ML20133H169 (5) | |
Text
.
OPERATING DATA REPORT 50-397 DOCKET NO.
UNIT 85 DATE COMPLETED BY L.B. Hutchison TELEPHONE (509) 377-2501 ext 2486 OPER ATING STATUS
- 1. REPORTING PERIOD:
GROSS HOURS IN REPORTING PERICO:
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3323 max. DEPENO. CAPACITY (MWo. Net): 1095 DESIGN ELECTRICAL RATING (MWe Net): 1100 MAX. DEPEND. CAPACITY (MWe-GROSS:1 1140 590 MWe
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWo. Net):
- 4. REASONS FOR RESTRICTION (IF ANY): RRC PUMP PROBLEM THIS MONTH YR TO DATE CUMULATIVE 74.1 2561.9 2978.4
- 5. NUM8ER OF HOURS REACTOR WAS CRITICAL 669*9 6b9*9 bb9*9
- 6. REACTOR RESERVE SHUTCOWN HOURS..........
57.1 2411.4 2809.9
- 7. HOURS GENER ATOR ON LINE,............
bob'9 bbb*9 bOba9
- 8. UNIT RESERVE SHUTDOWN HOURS 104,106 6,815,686 8,029,314
- 9. GROSS THERMAL ENERGY GENERATED (MWM) 30,610 2,231,760 2,658,690
- 10. GROSS ELECTRICAL ENERGY GENER ATED (MWH).
29,277 2,143,171 2,553,557
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)
- 12. REACTOR SERVICE F ACTCR,..........
1 100 %
89.2%
89.8%
l
- 13. REACTOR AVAILABILITY FACTOR 7.7%
66.6%
69.2%
- 14. UNIT SER'/ ICE FACTOR 100 %
85.5%
86.1%
1E. UNIT AVAILABILITY FACTOR
- 16. UNIT CAPACITY FACTOR (Using MDC)
- 17. UNIT CAPACITY FACTOR (Us.ng Design MWel.......
- 18. UNIT FORCED OUTAGE R ATE.............
- 19. SHUTCOWNS SCHECULED OVER NEXT 6 MONTHS (TYPE, DATE. AND CURATION OF EACHl:
i
(
- 21. UNITS IN TEST STATUS (P91CR TO CCMMERCIAL CPERATIONh FORECAST ACHIEVED INITI AL CRITICA LITY INITIAL ELECTRICITY COMMERC'AL OPER ATION Generator Nameplate rating 1,231,700 KVA 0 0.975 P.F.
8508090214 e50531
%M PDR ADOCK 05000397 R
AVERAGE DALLY UNIT POWER LEVEL DOCKET NO.
50-397 WNP-2 UNIT DATE 6/1/85 COMPLETED BY L.B. Hutchison TELEPHONE (509) 377-2501 ext 2486 MOhTri MAY 1985 DAY AVERAGE DATLY POWER LEVEL I[)' P WER LEVEL N
1 55 17 0
549 2
0 18 122 3
0 19 4
0 0
20 0
5 0
21 0
6 0
n 0
7 0
23 0
s 0
24 0
9 0
25 0
to 26 0
11 0
0 27 0
12 0
- g 0
13 0
23 0
14 0
30 0
15 o
33 0
16 f
INSTRUCTIONS On this form, list the average dany unit power level in MWe Net for each day in the reporting month. Compute to th nearest whole megawatt.
Taese figures wi!! be used to plot a graph for each reporung month.No:e that when ma.tmum dependable capaci used for the net electncal ratinE of the unit there may be occasions wben the daily average power level exceeds the 100?.' line (or the restricted power level hne). In such cases, the average daily unit power output sheet shou!d be footnoted to explairt the apprent anomaly.
DO@ETNO.
50-397 LNIT NAVE WNP-2 DATE 6/1/85 LNIT SHUTDOWNS / REDUCTIONS COMPLETED BY L. B. Hutchison REPCf1T PERIOD MAY 19 85 TELEPHONE (509) 377-2501 ext 2486
- month, year NO.
DATE TVPE TUDE MA5DN METHOD LER NUEER SYSTEM N CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 85-09 5/3/85 5
686.9 H
l NA NA NA Plant shut down as scheduled for maintenance outage (M3)
I I
l SUH4ARY l WNP-2 Remains shut down for maintenance outage TYPE REASON METHOD SYSTEM & COMP 0ENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report 8
& License Examination 9-Other (LER) File (NUREG-0161)
O
-w.
'*jhdf1 SM,N I N LUISt RL Corcoran 927S'-
CH McGilton 956B KD Cowan 988U JF Peters 927S W Chin (2) 399 JW Shannon 387 RG Graybeal 927S GC Sorensen 280 LB Hutchison 927S-DH Walker 927S GH Godfrey 1023 D Feldman 956B JA Landon 927S Ops. File 1313.2 927S LT Harrold 982B LBH/ CMP /LB JD Martin 1023 GJ Kucera 1035 Docket No. 50-397 Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for i
May 1985 as required by our Technical Specific'ations 6.9.1.16.
L Very truly yours, C. M. Powers (M/D 927M)
WNP-2 Plant Manager CMP /pl Enclo.sure i
cc: Mr. John B. Martin
- NRC, Region V
)
Mr. A. D. Toth
- WNP-2 Site Ms. Dottie Sherman
A sm L.B. HUTCHISON
/M
' semesnamtieri C.M, POWERS / '/// //r r ~iL.
L.. o. <-
E e-v*e 9
,a.t. coaco -
O b
o Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 June 6, 1985 Docket No. 50-397 Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May 1985 as required by our Technical Specifications 6.9.1.16.
Very truly yours, diaLa C. M. Powers (M/D927M)
WNP-2 Plant Manager CMP /pl Enclosure cc: Mr. John B. Martin
- NRC, Region V Mr. A. D. Toth
- WNP-2 Site Ms. Dottie Sherman
'If