Revised Monthly Operating Rept for May 1985
ML20133H139
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 05/31/1985
From: Alden W, Logue R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8508090205
Download: ML20133H139 (3)


Text

..

sm,

1.

OPERATING DAT A REPORT c

7 DOCKET NO. 50 - 278 DATE JUNE 15,1985 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS

1. UNIT NAME PEACH BOTTOM UNIT 3 l t,0 TEST UNIT 3 INCURRED ONE SCHEDULED l l

l

2. REPORTING PERIOD 1 MAY, 1985 l

AND ONE FORCED LOAD DROP.

1 l

l 3 LICENSED THERMAL POWER (MdT):

3293 I

UNIT IN POWER COAST 00WN.

I l

l

4. NAMEPLATE RATING (GROSS MWEls 1152 l

l l

l

5. DESIGN ELECTRICAL RATING (NET MWEls 1065 l

l l

l

6. MAXIMUM DEPENDABLE CAPACI TY (GROSS MWEls 1098 l

l l

l

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)*

1035 l

1 8.

IF CHANGES OCCUR IN C APACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORTe GIVE REASONS

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY INET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY8 THIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744 3,623 91,511
12. NUMBER OF HOURS REACTOR W AS CRITICAL 744.0 2,984.7 67,542.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 744.0 2,933.3 65,798.4 7'
15. UNIT RESERVE SHUT 00WN HOURS 0.0 0.0 0.0 lo. GROSS THERMAL ENERGY GENERATED (MWH) 2,062,152 8,285,064 192,484,872
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 661,220 2,703,600 63,211,140
18. NET ELECTRICAL ENERGY GENERATED (HWH) 629,440 2,589.956 60,699,258 1Y. UNIT SERVICE FACTOR 100.0 81.0 71.9
20. UNI T AVAILABILITY FACTOR 100.0 81.0 71.9

=

21. UNIT CAPACITY FACTOR (USING MDC NET) 81.7 69.1 04.1

-wm

22. UNIT CAPACITY FACTOR (USING DER NET )

79.4 67.1 62.3

23. UNIT FORCED OUTAGE RATE 0.0 1.1 7.2
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACHit REFUELING AND MAINTENANCE OUT AGES FROM 6/2d/85 FOR 8 WEEKS UNTIL 8/27/85.

8500090205 850531 PDR ADOCK 05000278

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP 8 R

PDR

20. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATIONi t FORECAST ACHIEVED INITIAL CR111CALITY INITIAL ELECTRICITY k

COMMERCI AL OPERA TION II

m-

-hkB.

tc.

--f k

t U1IT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE JUNE 15,1985 REPORT MGNTH MAY, 1985 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY W.M. A LD EN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022

= _ - -

1 I

l 1

l METHOD OF l LICENSEE ISYSTEMI COMPONENTI CAUSE AND CORRECTIVE l

l TYPE lDUR ATION lRE ASON IS HUTTING DOWNI EVENT l CODE I CODE I ACTION TO NO.I DATE I (1)l (HOURS)I (2) l RE ACTO R (3) l REPORT f I (4) 1 (5) l PREVENT RECURRENCE I

I I

I I

I i

1 I

Ol 450512 i S I 000.0 l

F l 4

l N/A l RC l ZZZZZZ l LOAD REDUCTION FOR MAIN STEAM ISOLATION 1

I l

l I

I I

l l VALVE CLOSURE TIME TESTING AND ROD ADJUSTMENT.

I I

I I

I I

I I

l 9 1 850515 i F I 000.D l

8 I 4

l N/A l CB l PUMPXX l POWER REDUCED TO EVALUATE INNER SEAL PRESSURE l

l l

l l

l l

1 i ON 38 RECIRCULATION PUMP.

I I

I I

l*

I I

I I

I I

I -

1 I

I I

I I

~

(1)

(2)

(3)

(4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - M ANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - S AME SOURCE

~

W w 7

l PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 2isi e 4i.4ooo July 3, 1985 Docket Nos. 50-277 50-278 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555

SUBJECT:

Revision to Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:

Enclosed is a revised unit shutdowns and power reductions page and a revised Operating Data Report Page to the Monthly Operating Report for Peach Bottom Unit 3 for the month of May, 1985 forwarded pursuant to Technical Specification 6.9.1.C.

These revised pages are being resubmitted to provide information which was inadvertently omitted.

Changes are identified with a vertical bar in the margin.

If you have any questions regarding the enclosed material, please contact W.

M.

Alden at (215) 841-5022.

Very truly yours, O

l

~

R. H.

e Superintendent Nuclear Services Attachments cc: Dr. T. E. Murley, NRC Mr. T.

P. Johnson, Resident Inspector Mr. Stan P.

Mangi, Dept. of Envir. Resources Mr.

P. A.

Ross, NRC (2 copies)

INPO Records Center

[