o OPERATING DATA REPORT DOCKET NO. 50-327 DATE JULY 8 1985 COMPLETED BY G R WILBOURN TELEPHONE (615)S70-6544 OPERATING STATUS 1.
UNIT NAME: SEQUOYAH NUCLEAR PLANT, UNIT 1
NOTES:
- 2. REPORT PERIOD: MAY 1985 Revised to correct for the 3.
LICENSED THERMAL POWER (MWT):
3411.0 4.
NAMEPLATE RATING (GROSS MWE):
1220.6 negative net generation.
5.
DESIGN ELECTRICAL RATING (NET MWE):
1148.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1183.0 Revised the Cycle 3 7.- MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1148.0 Refueling Outage start datec 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBERS 3 THROUGH 7)SINCE LAST REPORT, O1VE REASONS:____________
9.
POWER LEVEL TO.WHICH RESTRICTED,IF ANY(NET MWE):________
- 10. REASONS FOR RESTRICTIONS,IF ANY:_______________________
THIS MONTH YR.-TO-DATE CUMULATIVE-
- 11. HOURS IN REPORTING PERIOD 744.00 3623.00 34344.00
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL O.00 2467.10 23114.76
- 13. REACTOR RESERVE SHUTDOWN-HOURS 0.00 0.00 0.00
'14.
HOURS GENERATOR ON-LINE O.00 2465.10 22574.05
- 15. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.00 8139835.76 72817521.71
- 17. GROSS ELECTRICAL ENERGY GEN. (MWH) 0.00 2818410.00 24554826.00
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
-8174.00 2703140.00 23584770.00
- 19. UNIT SERVICE FACTOR O.00 68.04 65.73
- 20. UNIT AVAILABILITY. FACTOR O.00 68.04 65.73
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.00 64.99 59.82
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.00 64.99 59.82
- 23. UNIT FORCED OUTAGE RATE O.00 0.00 16.67
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
_. Refueling /11odif icsttiptt _ _.sg at_eh e r _2],,
1985
_5.,1_dn s________________________
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
_ June _1_5_,_1985 NOTE THAT THE THE YR.-TO-DATE AND CUMULATIVE VALUES HAVE BEEN UPDATED.
8500090201 850531 PDR ADOCK 05000327 R
N M,1,
s TENNESSEE VALLEY AUTHORITY Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, Tennessee 37379 July 9, 1985 Nuclear Regulatory Commission.
Office of Management Information and Program Control Washington, DC 20555 Gentlemen:
SEQUOYAll NUCLEAR PLANT - MONTHLY OPERATING REPORT - MAY 1985 (REVISED)
Enclosed is the revised May 1985 Operating Data data sheet for Sequoyah Nuclear Plant Unit 1.
The revision accounts for the negative net generation, since the unit was in'an outage during the entire month.
Very truly yours, TENNESSEE VALLEY AUTHORITY
'^
P. R. Wallace Plant Manager Enclosure cc (Enclosure):
Director, Region II Director, Office cf Management Nuclear Regulatory Commission Information and Program Control Office of Inspection and Enforcement Nuclear Regulatory Commission 101 Marietta Street Washington, DC 20555 (2 copies)
Suite 3100 Atlanta, GA 30323 (1 copy)
INPO Records Center Suite 1500 Director, Office of Inspection 1100 Circle 75 Parkway and Enforcement Atlanta, GA 30339 (1 copy)
Nuclear Regulatory Commission Washington, DC 20555 (10 copiem)
Mr. A. Rubio, Director Electric Power Research Institute P. O. Box 10412 Palo Alto, CA 94304 (1 copy)
Mr. R. C. Goodspeed MNC 461 Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, PA 15230 (1 copy)
Mr. K. M. Jenison, NRC Inspector Sequoyah Nuclear Plant
[
1983-TVA 5OTH ANNIVERSARY
. ~ 0,,memm.