ML20133G705

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-271/85-18 on 850507-0603.No Violation Noted
ML20133G705
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/18/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20133G709 List:
References
NUDOCS 8508090043
Download: ML20133G705 (2)


See also: IR 05000271/1985018

Text

_ - - _

'

y

-

,

g 181985

j

Docket No. 50-271

Vemont Yankee Nuclear Power Corporation

ATTH: Mr. Warren P. Murphy

Vice President and Manager of Operations

RD 5 Box 169

Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

Subject:

Inppection Report No. 50-271/85-18

This refers to the routine resident safety inspection conducted by Mr. W. J.

Raymond of this office on May 7 - June 3,1985, at the Vemont Yankee Nuclear

Power Station, Vernon, Vemont. The inspection consisted of observation of

activities, interviews with personnel and document reviews. The results of

the inspection are described in the NRC Region I Inspection Report enclosed

with this letter and were discussed with Mr. J. P. Pelletier of your staff at

the conclusion of the inspection.

No violations were identified within the scope of this inspection.

Your cooperation with us is appreciated.

Sincerely,

Orar;1ual Signed 37:

l

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure:

NRC Region I Inspection Report No. 50-271/85-18

cc w/encis:

Mr. R. W. Capstick, Licensing Engineer

Mr. W. F. Conway, President and Chief Executive Officer

Mr. J. P. Pelletier, Plant Manager

Mr. Donald Hunter, Vice President

Mr. Cort Richardson, Vemont Public Interest Research Group, Inc.

Public Document Room (PDR)

gggBOgg

eggOjgf1

I

71e

i

Local Public Document Room (LPDR) (NSIC)

G

Nuclear Safety Infomation Center

l

NRC Resident Inspector

State of Vermont

(N

q

State of New Hampshire

oppyg74L RECORD Copy

J

I

.

.

_ _ - .

i

-

.

.

Vermont Yankee Nuclear Power

2

Corporation

JUL 181985

bec w/encls

Region I Docket Room

Senior Operations Officer (w/o encis)

DRP Section Chief

DRP Branch Chief

H. Kister, DRP

R. Keller, DRP

>

L

/

i

l

aR

P

I RP

---

ye

4..,,.,

, w

y

9e

<

OFFICIAL RECORD COPY