Informs of Intent to Complete GL 96-01 Reviews to Converted TSs by End of Unit 1 Refueling Outage in Spring of 1998
ML20133G545
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/02/1997
From: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-96-01, GL-96-1, TXX-97003, NUDOCS 9701160080
Download: ML20133G545 (2)


Text

_._._ _ _

o M'

Log # TXX-97003

= "lllllllll File # 10035 L

4 Ref. # 10CFR50.54(f) r

=

GL 96-01 TilELECTRIC*

c. Lance Terry January 2, 1997 Group We President U. S. Nuclear Regulatory Commission Attn.

Docketing and Service Branch Washington, DC 20555-0001

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 UNITS 1 AND 2 RESPONSE TO GENERIC LETTER 96-01, " TESTING 0F SAFETY-RELATED LOGIC CIRCUITS" REF:

1)

Generic Letter 96-01, " Testing of Safety-Related Logic Circuits," dated January 10, 1996 1

2)

TV Electric letter logged. TXX-96114 from C L. Terry to the NRC dated April 17, 1996 3)

TV Electric letter logged. TXX-95292 from C. L. Terry to the NRC dated November 28, 1995 Gentlemen:

On January l'0, 1996, the NRC issued Generic Letter 96-01, " Testing of Safety-Related Logic Circuits" (Reference 1).

TU Electric responded (Reference 2) with a plan to complete the Generic Letter requested actions by the spring of 1998 consistent with the latter of the refueling outages scheduled in 1998 for CPSES units 1 and 2.

The plan included reviews to the N'lC approved converted Technical Specifications.

The original plan called for a submittal to the NRC for approval a set of converted Standard Technical Specifications by December of 1996.

At this time the submittal of the converted Technical Specifications has been delayed by a few months.

As described in Reference 3. this continues to be a joint submittal with Wolf Creek, Calloway, and Diablo Canyon plants.

It is still TV Electric's intent to complete the Generic Letter reviews to the converted Technical Specifications and to complete these reviews by the end of the Unit I refueling outage in the spring of 1998 as originally committed.

There remains sufficient time to perform the reviews with the delayed submittal, assuming a corresponding delay in the NRC approval uf the converted Technical Specifications.

O 9701160080 970102 PDR ADOCK 05000445 O

p PDR g

l P. O. Bou 1002 Glen Rose Texas 76043 j

TXX-97003 Page 2 of 2 If you have any questions, please contact Dennis Buschbaum at (817) 897-5851.

Sincerely.

G,$. %

C. L. Terry By:

094 M-R. D" Walker

~

Regulatory Affairs Manager DEB /clc Attachments c-Mr. L. J. Callan. Region IV Resident Inspectors, CPSES Mr. T. J. Polich. NRR i