ML20133G453
Jump to navigation
Jump to search
| ML20133G453 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 10/08/1985 |
| From: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20133G451 | List: |
| References | |
| NUDOCS 8510150469 | |
| Download: ML20133G453 (1) | |
Text
n.
B ALTI M O RE GAS AND ELECTRIC CHARLES CENTER.P.O. BOX 1475 BALTIMORE, MARYLAND 21203 ARTH UR E. LUN DVALL., JR.
v.cc >=ctaoc w
- sum, October 8,1985 Dr. Thomas E. Murley Regional Administrator U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit No.1; Docket No. 50-317 Report of Startuo Testing for Cycle 8 Gentlemen:
s Startup testing for Calvert Cliffs Unit 1 Cycle 8 was completed on September 3,1985. A summary of the results from those tests is enclosed.
Very tr ours
}
/
f*
. 4 '~
WN' AEL/JES/ tim Enclosure ec: Director Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk E. J. Butcher, Jr.
D. A. Brune, Esq.
G. F. Trowbridge, Esq.
D. H. Jaffe, NRC R. R. Mills, C-E T. Foley, NRC 8510150469 851009 DR ADOCK O 37 L