Forwards Corrected Summary of Startup Testing for Cycle 8. Previous Transmittal Consisted of Two Copies of Tables 3 & 4 But No Table 5
ML20133G448
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 10/09/1985
From: John Stanley
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20133G451 List:
References
NFM-85-339, NUDOCS 8510150468
Download: ML20133G448 (1)


Text

__

P e

B ALTIMORE G AS AND ELECTRIC COMPANY P. O . B O X 1475 B ALTIMOR E. M A R YL A N D 212o3

NUCLE AR POWER DEPARTMENT CALVERT CLIFFS NUCLEAR POWER PLANT LU5BY. M ARYL AND 20657 October 9,1985 NFM 85-339 Director Inspection and Enforcement i

U. S. Nuclear Regulatory Commission l Washington DC 20555 ATTENTION: Document Control Desk Enclosed is a revised copy of the Calvert Cliffs Unit 1 Cycle 8 Startup Test Report which you should have already received. Due to a xeroxing error, you may have received two copies of Tables 3 and 4 but no copy of Table 5. If this is the case, please replace the i previous copy with the attached copy.

l Thank you for your cooperation in this matter.

I h b_

Jg E. Stanley

Incore Fuel Management JES/ tim i

6 85y01$$S'h7 6 \

P