05000245/LER-1996-056, Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted

From kanterella
(Redirected from ML20133G420)
Jump to navigation Jump to search
Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted
ML20133G420
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/10/1997
From: Noll W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133G424 List:
References
B16129, NUDOCS 9701160041
Download: ML20133G420 (1)


LER-1996-056, Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)
2451996056R00 - NRC Website

text

_.... -. - -

I D N:rtheast mi.ne ome.. nor, r,rry na., werroni, er

~ jf Utilities Syskm p o 3,, 323 herford, CF 06385-0128 j

(203) 447-1791 January 10,1997 l-Docket No. 50-245 l

B16129 Re: 10CFR50.73(a)(2)(i) f i

U.S.. Nuclear Regulatory Commission l

Document Control Desk Washington, DC 20555 l

This letter forwards Licensee Event Report (LER) 96-065-00, documenting an event that.

1 occurred at Millstone Nuclear Power Station, Unit No.1 on December 12, 1996. This LER is submitted pursuant to 10CFR50.73(a)(2)(i).

i The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only.

B16129-1 NNECO commits to conduct a review of the present Liquid Radwaste Discharge system lineup to determine the appropriate configuration. The discharge procedure will.be modified accordingly, as determined by this review, to ensure a proper background level is accounted for while discharging effluents by March 31,1997.

B16129-2 The implementing document for the role of system managers will be approved by March 31,1997.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY I

For:

P. D. Hinnenkamp Director, Unit Operations N

9701160041 970110 a

'PDR ADOCK 05000245 Manager, Operations S

PDR Attachment: LER 96-065-00 cc:

Dr. W. D. Travers, Director, Special Projects H. J. Miller, Region I Administrator S. Dembek, N'RC Project Manager, Millstone Unit No.1 T. A. Easlick, Senior Resident Inspector, Millstone Unit No.1 083422-9 REY 1-95

~.