Forwards Safety Evaluation Accepting Util 831107 Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review.Response to Staff Recommendations Requested within 45 Days
ML20133G397
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/29/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20133G400 List:
References
GL-83-28, NUDOCS 8508080666
Download: ML20133G397 (2)


Text

- . .- . _ _ _ _ _ _ - _ _ _ . . - - - - _ _ - _ _ .

0 July 29, 1985 Docket Nos. 50-266 Distribution: Decket;Hle NRC & L PDRs l

and 50-301 Branch Files EButcher TColburn PKreutzer ABournea DBeckham '

2 GHolahan EJordan BGrimes Mr. C. W. Fay, Vice President ACRS 10 OELD l 4 Nuclear Power Department Wisconsin Electric Power Company l 231 West Michigan Street, Room 308  ;

Milwaukee, Wisconsin 53201 i

Dear Mr. Fay:

SUBJECT:

SAFETY EVALUATION FOR POINT BEACH UNITS 1 AND 2, GENERIC LETTER 83-28, ITEM 1.1 (POST TRIP REVIEW) i We have reviewed your November 7,1983 response to Generic Letter 83-28 concerning the subject item. Our safety evaluation is enclosed. We have I determined that your response meets our guidelines for post-trip review

] except in two areas:

1. The method and criteria for comparing the event with known or expected plant behavior. ,

r

2. The development of a systematic safety assessment program to assess l

unscheduled reactor trips.

Further details are contained in the safety evaluation.

We request that you address the staff's recommendations as described in section III of the safety evaluation and either commit to following the recorrendations or provide adequate justification for not doing so. We j

request your response within 45 days of your receipt of this letter. Our review of your response will be addressed in a supplement to this safety t evaluation.

l The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

If you have any questions, please contact T. G. Colburn at (301) 492-4709.

Sincerely, original signed by:

Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 '

Division of Licensing

Enclosure:

Safety Evaluation cc w/ enclosure:

i See next page 9 -

ORB #3:DL ORB #3:DL ORS # L 4

PKypp$aer TColburntef Elttft er l

7 /85- g/g/85 q/N/85

8500080666 850729 PDR ADOCK 05000266 P pon

. s Mr. C. W. Fay Point Beach Nuclear Plant

. Wisconsin Electric Power Company Units 1 and 2 cc:

Mr. Bruce Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, DC 20036 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road ,

Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 -

Two Rivers Wisconsin 54241 Chairman Public Service Consission of Wisconsin -

Hills Farms State Office Building Madison, Wisconsin' 53702 Regional Administrator, Region !!!

U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 7.99 Roosevelt Road

,Clen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Consission 6612 Nuclear Road Two Rivers, Wisconsin 54241 l

l

)

-