ML20133F376
| ML20133F376 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/10/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20133F378 | List: |
| References | |
| NUDOCS 9701140162 | |
| Download: ML20133F376 (6) | |
See also: IR 05000361/1996019
Text
.-____..m
. . _.- , _
.-
te "%c
_
UNITED STATES
$p
%
NUCLEAR REGULATORY COMMISSION
'
.
REGloN IV
3'
4
611 RYAN PLAZA ORIVE. SulTE 400
%,
.....
JAN I O 1997
Harold B. Ray, Executive Vice President
Southern California Edison Co.
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, California 92674-0128
SUBJECT: NRC INSPECTION REPORT 50-361/96-19:50-362/96-19 AND NOTICE OF
VIOLATION
Dear Mr. Ray:
An NRC inspection was conducted December 16-20,1996, at your San Onofre Nuclear
Generating Station, Units 2 and 3 reactor facilities. The enclosed report presents the
scope and results of that inspection.
The inspection identified three radiological control violations which call into question the
,
attentiveness of the staff at San Onofre. These violations addressed the control of
radioactive material, the labeling of radioactive material containers, and the awareness by
plant workers of radiological conditions. Our concern is heightened because of the 23
examples, found by your staff between August and December 1995, where uncontrolled
radioactive material was found outside of the radiological controlled area. Your corrective
actions have not yet been effective in correcting this problem.
The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violations are described in detailin the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR). To the extent possible, your response should not include any personal privacy,
proprietary, or safeguards information so that it can be placed in the PDR without
'
redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
9
M mas
"y
, Director
p vision of Rea tor Safety
i
9701140162 960110
ADOCK 05000361
G
_
_
_ _ . _ _ . _ _ . _ . .
.
_ _ _ _ _ _ _ . _ _ _ _ _ . . _ _ _ . _ . _ _ _ . _ . _ . , _ _ . _ . _
. . _ _
. _ . _ _
.
j
.
Southern Cclifornia Edison Co.
-2-
4
'
1
,
i
Docket Nos. 50-361 50-362
i
Enclosures:
.
!
2. NRC Inspection Report
50 361/96-19:50-362/96-19
.
cc w/ enclosures:
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
San Diego, California 92101
Alan R. Watts, Esq.
Rourke & Woodruff
701 S. Parker St. No. 7000
Orange, California 92668-4702
Sherwin Harris, Resource Project Manager
Public Utilities Department
City of Riverside
)
3900 Main Street
Riverside, California 92522
R. W. Krieger, Vice President
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
1
San Clemente, California 92674-0128
Dr. Harvey Collins, Chief
Division of Drinking Water and
Environmental Management
California Department of Health Services
P.O. Box 942732
Sacramento, California 94234-7320
Terry Winter, Manager
Power Operations
San Diego Gas & Electric Company
P.O. Box 1831
San Diego, California 92112
.
,
-.
._
-.
.
.
..
,
._
_
.
,.
Southern California Edison Co.
-3-
Mr. Steve Hsu
Radiological Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento, California 94234
Mayor
City of San Clemente
100 Avenida Presidio
San Clemente, California 92672
Mr. Truman Burns \\Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
. -
-
. - . . .
.
._-
-
. . . .
--
..
--
'
.
- 0
Southern California Edison Co.
-4-
i
1
i
E-Mail report to D. Nelson (DJN)
,
E-Mail report to NRR Event Tracking System (IPAS)
1
,
. bec to DMB (IE06)
,
)
bec distrib. by RIV:
L. J. Callan
Resident inspector
DRP Director
DRS-PSB
4
i
Branch Chief (DRP/F, WCFO)
MIS System
Senior Project inspector (DRP/F, WCFO)
RIV File
,
!
Branch Chief (DRP/TSS)
M. Hammond (PAO, WCFO)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
WCFO File
DRS Al 97-G 00]O
4
i
i
a
i
J
$
i
3
i
,
iIf
DOCUMENT NAME: R:\\ SO23\\SO619RP.MPS
,
To receive copy of document. ndicate in box: "c" = Copy without enclosures
"E" = Copy o$ enclosures "N" = No copy
,
RIV:RS:PSB
lE
RS:PSB
E
C:PSB
,E
D:DR1, V
N
D:DRP , ,Q lp
MShannon4O
GGuerra n6
BMurray jy
TPGp9nrby 'M
JEDyedyff
7
0ff/97
01/(,/97
01rJ/97
01/(/97 [ \\<
01/6f/9?d'y
" ' ~
Of:DRS y ,
N
'
TPGwynn k(p
0140/97
h'
V
OFFICIAL RECORD COPY
0 ,j
3
_- . ..
.
. - . .
-.
. - - . . - . . . _
--
._-- - .
_
.-.
.
.
Southern California Edison Co.
-4-
!
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
bec to DMB (IE06)
,
bec distrib. by RIV:
l
L. J. Callan
Resident inspector
I
DRP Director
DRS-PSB
l
Branch Chief (DRP/F, WCFO)
MIS System
Senior Project inspector (DRP/F, WCFO)
RIV File
Branch Chief (DRP/TSS)
M. Hammond (PAO, WCFO)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
WCFO File
DRS Al 97-G-00]O
h
DOCbivitN T NAME: R:\\_S623\\SO619RP.MPS
'
To receive copy of document. Indicate in box: "C" = Copy without enclosures **' c Copf vid enclosures "N" = No copy
RIV:RS:PSB
E
RS:PSB
E
C:PSB
,E
D:DRQ, V
N
D;DRP _M Q/
MShannor46
GGuerra g (, BMurray jy
TPG%nny I/f
JEDye Q rf f
Off/97
01/(,/97
01 AJ/97
01/(/97 [ tV
016//9M'M
" ' ~
Of:DRS 9 ,
N
'
TPGwynn bjf/
0140'97
h~'
I
V
OFFICIAL RECORD COPY
_