Forwards Safety Insp Rept 50-440/85-33 on 850603-0708 & Notice of Violation
ML20133F330
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/05/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20133F333 List:
References
NUDOCS 8508080239
Download: ML20133F330 (2)


See also: IR 05000440/1985033

Text

,

-

y

AUG 5 1985

Docket No. 50-440

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. J. A. Grobe

and J. P. Brown, Jr. of this office on June 3 through July 8,1985, of

activities at Perry Nuclear Power Plant, Unit 1, authorized by NRC

Construction Permit No. CPPR-148 and to the discussion of our findings with

Messrs. M. D. Lyster, C. M. Shuster, F. R. Stead, and J. J. Waldron at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative record , observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in

violation with NRC requirements, as specified in the enclosed Appendix. A

written response is required.

In accordance with the NRC's Rules of Practice for Domestic Licensing

Proceedings, Title 10, Code of Federal Regulations, Part 2, Section 2.790,

a copy of this letter and the enclosures will be placed in the NRC Public

Document Room.

The response directed by this letter is not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1980, FL 96-511.

8508000239 850805

PDR

0 ADOCK 05000440

PDR

_

.

e

.

The Cleveland Electric Illuminating 2 AUG 5 1985

. Company

We-will gladly discuss any questions you have concerning this inspection.

Sincerely,

tt

'

) .

N

'

. F. Warnick, Chief

Projects Branch 1

Enclosures:

1. Appendix, Notice

of Violation

2. Inspection Report

No. 50-440/85033(DRP)

cc w/ enclosures:

J.~J. Waldron, Manager, Perry

Plant, Technical Department

M. D. Lyster,' Manager, Perry Plant

Operations Department

.L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

RIII RIII RII~

  1. 6 72 dC (.

McCormick-Barger/1d Knog war f6k

08/02/85