Text
,
7 OPERATING-DATA CEPORT
-o
, b DOCKET No. 50 - 352 n
~
0 DATE JUNE 14,1985 COMPLETED BY ILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERAT ION DIVISION-NUCLE AR TELEPHONE (2151 841-5022 OPERATING STATUS
- 1. UNIT NAMEt LIMERICK UNIT 1 1 NOTES UNIT 1 15 1N ST ARTUP TESTING. l g
l
- 2. REPORTING PERIOD MAY, 1985 i
FACILITY OPERATING LICENSE l
1 I
- 3. LICENSED THERMAL POWER (MWTl t 165 i
NPF-27, ISSUED 10/26/84, RE-l
'l I
- 4. NAMEPLATE RATING (GRDSS MWE) 8 1092 l
STRICTS POWER LEVELS NOT TO l
g
- 5. DESIGN ELECTRICAL RATING (NET MWEl 1055 l
EXCEED 55 0F THE RATED POWER. l l
l I
l
- 6. MAXIMUM DEPENDA8LE CAPACITY (GROSS MWEla i
I l
l 7.' MAXDtJM DEPENDA8LE CAPACITY (NET MWE) 8
- 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBEA 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS
- 9. POWER LEVEL TO WHICH RESTRICTED,1F ANY (NET MWEls
- 10. REASONS FOR RESTRICTIONS, IF ANY THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 0
0 0
1,042.1 1,079.8
- 13. REACTDR RESERVE SHUTDOWN H3URS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 0.0 0.0 0.0
- 15. UNIT RES9RVE SHUTDdWN HOURS 0.0 0.0 0.0 !'
- 10. GROSS THERMAL ENERGY GENERATED (MWHI O
95,668 95,668
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWHI O
O O
o
- 18. NET ELECTRICAL ENERGY GENERATED (MWHI
-72
-72
-72 LV. UNIT SERVICE FACTOR 0.0 0.0 0.0 Nng
~ QQA
- 29. UNIT AVAILAh!LITY 'F ACY6R 0.0 0.0 0.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 0.0 g
(D C
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 0.0 q
- 23. UNIT FORCED UUTAGE RATE 0.0 0.0 0.0 h
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (lYPE, DATE, AND DURATION OF EACHit 4
- 25. IF SHUTDOWN AT END OF REPURT PERIOD, CSTIMATED DATE OF STARTUPs 03 E1.,tt:
- 23. UNITS IN TEST STATUS (PRIUR TO COMMERCIAL OPERATIONis FORE CAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85 4 / 13 / 8 5 COMMERCIAL OPERATIUN 4TH QTR 85 0 - CIT %fRTLfD0fD _CUC@Q90@_#@D @E3B86DGC0$9 C)BDD3 F3@GRAL ENERGY REGULATORY _ C0_MM_lSS_1_DN REPORTS.
6 AVERAGE DAILY UNIT POWER LEVEL I
DOCKET NO. 50 - 352 UNIT L1HERICK UNIT 1 DATE JUNE 14,1985 CCMPANY PHILADELPHI A ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATICN DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH HAY 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
(MWE-NET) 1 0
17 0
l 2
0 18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0-24 0
1 9
0 25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 O
lo O
{
l
-o UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352 UNIT NAME LIMERICK UNIT 1 DATE JUNE 14,1985 REPORT MONTH MAY, 1985 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (2153 841-5022
)
1 I
l l
l METHOO OF l LICENSEE 1%YSTEMICOMPONENTI CAUSE AND CORRECTIVE i
ITYPElDURATION IRE ASONISHUTTING DOWN!
EVENT l CODE i CODE I ACTION TO NO.!
DATE I (lit (HOURSll (2) i REACTOR (3) l REPORT # 1 (4) I (5) l PREVENT RECURRENCE I
I I
I I
I I
I I
2 4 850501 i Sl 048.0 1
8 l 2
l NA I TA l TURBIN l SCHEDULED MAINTENANCE CONTINUED FROM 04/1o/85.
I I
i 1
1 1
I I
I 3 4 850503 i S i 696.0 i
H I 4
i NA l ZZ l ZZZZZZ l UNIT IN SHUTDOWN MODE. UNIT PENDING FLA.L POWER I
I I
I I
i l
1 i LICENSE.
I I
I I
I I
I I
I l
l l T44.0 l
1 I
i l
l (Il (2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - M ANUAL FOR PREPARATIG4 OF DATA B - MAINTENANCE OR TEST 2 - M ANUA L SCR AM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAINI FILE (NUREG-OI61)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE 9
-~
o 6
Dockat No. 50-352 Attachment to Monthly Operating Report for May, 1985 Limerick Generating Station Unit 1 May 1 through May 31, 1985 I.
Narrative Summary of Operating Experiences The reactor remained shutdown for the month of May to perform maintenance and modifications in anticipation of a full power license expected in June.
The fuel pool was drained on May 7 for relocation of hangers, modification of pool level switch and other work in preparation of first refueling outage.
Modifications which began and continued throughout the month included the following:
inspect "A" and "B" Reactor Feed Pump impellers; investigate the Residual Heat Removal (RHR) pump oil frothing problem; and modify the "A" main turbine lube oil separator.
Maintenance included hydrolasing of the condenser tubes in the "A " and "C" waterboxes.
II.
Challenges to Relief Valves During this month, there were no challenges to the main steam system safety-relief valves.
I-t e
=
D
~
i f
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 saim e414 June 14, 1985 Docket No. 50-352 Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
Limerick Generating Station Monthly Operating Report Gentlemen Enclosed is the monthly operating report for Limerick Unit 1 for the month of May, 1985 forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours, t%
4 R. H.
o ue Superintendent Nuclear Services WMA:vdw Attachment; cc Director, Office of Inspection & Enforcement, USNRC (12 copies)