Text
.
o L
d F RAMATOME COG EMA F U E LS October 28,1996 s
Theodore S. Sherr, Chief Regulatory and International Safeguards Branch Division of Safeguards and Transportation, NMSS United States Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Sherr:
Reference:
FNMC Plan, SNM-1168, Docket 70-1021 Framatome Cogema Fuels has amended its Fundamental Nuclear Materials Control (FNMC) Plan to reflect our company's name change, various organizational changes and minor editorial changes. Attachment I lists the effected sections of the FNMC Plan. Because changes were made throughout the entire FNMC Plan, the Plan has been revised to reflect the date of October 24,1996 with all pages showing Revision
- 10. The changes made within the Plan are easily identified by side-bars. Six copies of the FNMC Plan are provided.
Framatome Cogema Fuels does not regard these changes as a decrease in the effectiveness of the FNMC Plan and are submitting these changes under the provisions of 10 CFR 70.32. In accordance with 10 CFR 2.790, the information contained within should be held from public disclosure. if you should have any questions regarding this submittal, please feel free to contact me at (804) 832-5202.
Sincerely, FRAMATOME COGEMA FUELS
! ',,. n e.-)
^"
Lynchburg Man factu ' g Facility 9701130203 961028 PDR ADOCK 07001021 E
.s ay F. Elli tt Ma ager, Safety & Licensing L7f L /%
h Lluup,poa g
i i w/ofe>f Q
Framstome Cogoma Fuels FRAMATOME P.O. Box 11648, Lynchburg, VA 24506 1646 YECHNOLOGIEs Telephone: 804 832-5000 Fax: 804 832-5167
j k
{
t ATTACHMENT I Page 1 of 3 Eann Section Chanoe i
All Changed all references to B&W Fuel Company or CNFP, to Framatome Cogema Fuels or LMF.
t 11 1.2 Paragraph 1: Changed B&W Fuel Company to Framatome Cogema Fuels.
Eliminated reference to "other B&W facilities". Paragraph 2: Changed CNFP to j
LMF and updated plant throughput.
12 1.3, 1.4 Changed CNFP to LMF.
i 1-3 1.5.1,1.5.3 Changed CNFP to LMF.
1-4 1.5.8 Changed "NRC 741" to " DOE /NRC-741" for consistency.
14 1.7.1 Changed CNFP to LMF.
1-5 1.7.1 Changed O.C. to Quality.
15 1.7.2 Changed CNFP to LMF.
2-1 2.2 Changed CNFP to FCF, LMF, 21 2.3 Changed CNFP to LMF.
2-2 2.3.1 Revised procedure approval for Supervisor of Inventory Control. The Supervisor will review all NMC procedures. Final approval of all NMC procedures rests with the Manager of Safety and Licensing.
2-3 2.3.4 Added first paragraph.
2-5 2.4.3 Changed B&W to FCF. Changed CNFP to LMF.
2-5 2.4.4 Changed CNFP to LMF.
2-6 2.4.5 Changed CNFP to LMF.
3-2 3.2 Changed BWFC CNFP to FCF LMF. Added statement "or B&W Fuel Company's Commercial Nuclear Fuel Plant if manufactured before December 15, 1995" Corrected sample batch size.
3-3 3.2, 3.3 Changed CNFP to LMF, 3-3 3.3.1.1 Deleted references to powder.
3-3 3.3.2.1 Changed CNFP to LMF.
3-4 3.3.3 Corrected sample lot size. Changed B&W to FCF.
3-5 3.4.1.1 Changed to require scale recalibration for deviations greater than one scale divbion for consistency with section 3.6.
35 3.4.1.2 Changed to require scale recalibration for devia ions greater than one scale division for consistency with section 3.6. Change) CNFP to LMF.
-6 e
e ATTACHMENT I Page 2 of 3 Eaga Section Change 3-5 3.4.2 Corrected reference of 3.4.2 to 3.4.1.
3-6 3.5.2.1 Added publisher information.
3-7 1.5.2.3 Changed to state the standards data would be used for determining random errors for weighing operations. (Deleted replicate weighing),
i 3-7 3.6 Changed CNFP to LMF.
'l 4-1 4.1 Changed physicalinventory anniversary date from July 1 to April 30. Corrected
< 10 g to.110 g.
I
.42 4.2.2 Updated plant throughput.
4-2 4.2.3 Changed physicalinventory anniversary date from July 1 to April 30, 4-4 4.3.1 Chanced CNFP to LMF.
51 5.3 Changed CNFP to LMF.
52 5.6.1 Changed CNFP to LMF.
5-3 5.6.2 Added second sentence for receipts containing larger than normal quantities that require temporary storage in approved areas rather than the pellet vault.
5-3 5.6.3 Changed Quality Assurance to Quality Verification.
5-4 5.8, 5.9.1 Changed CNFP to LMF.
55 5.9.6 Changed CNFP to LMF.
55 5.9.8 Corrected reference to Section 1 to Section 1.7.
5-7 5.11.2 Omitted "at the CNFP.
6-1 6.2 Added " greater than".
7-1 7.1 Added to have independent assessment every 24 months + / 30 days. Changed submittal date to completion date. Deleted references to " review". Changed definition of completion date of biennial assessment to be as stated in the final written report, rather than date report is submitted to plant management.
Changed to have corrective actions to be initiated within 40 calendar days following the completion date of the report.
7-2 7.2.2 Changed CNFP to LMF.
7-2 7.2.3.1 Added + /- 30 days. Changed CNFP to LMF.
73 7.2.6 Changed CNFP to LMF.
7-3,4 7.2.7 Changed definition of completion date of biennial assessment to be as stated in the final written report, rather than date report is submitted to plant management.
Deleted references to " review"
.m..
e t,,*
4 ATTACHMENT I Page 3 of 3 Page Section Change 8-1 8.1 Deleted, reference to "the CNFP*,
8-2 8.4 Reworded for clarity.
Annex f Changed to show current layout of plant grounds.
Annex 2 Changed to show current plant staff organizational chart (w/o names).
Annex 3 Changed to show current revised Statistical Program.
Annex 4 Changed to show current inventory procedure (NM-1609).
Annex 5 Changed Computer Storage Listings.