.a
OCT 0 41985
Docket No. 50-266
Docket-No. 50-301
' Wisconsin Electric Power Company
ATTN: Mr. C. W. Fay
Vice President
Nuclear Power Department
231 West Michigan, Room 308
Milwaukee, WI 53201
,
Gentlemen:
This refers to the routine safety inspection conducted by Mr. W. Snell and
otners of this office on September 9-11, 1985, of activities at Point Beach
Nuclear Plant authorized by NRC Operating Licenses No. DPR-24 and No. DPR-27
and to the discussion of our findings with Mr. C. Fay, J. Zach and others
of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with' personnel.
No items of noncompliance with NRC requirements were identified during the
corse of this inspection.
However, a weakness was identified which will
need corrective action by your staff. This weakness is summarized in the
attached Appendix to this letter. As required by 10 CFR Part 50, Appendix E.
IV.F. any weaknesses that are identified must be corrected. Accordingly,
please advise us in writing within 45 days of the date of this letter of the
corrective action you have taken or plan to take, showing the estimated date
of completion with regard to this exercise weakness.
The responses directed by this letter are.not subject to the clearance proce-
dures of the Office of Management and Budget as required by the Paperwork
,
Reduction Act of 1980, PL 96-511.
,
/\\\\
f>f y +
r.
yg
L
l
mMim 58lie
'
0
-
.
- .
.
-
-
.
.
{,
.
,_
.
-
i
Wisconsin Electric Power Company
2
OCT 0 41985
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.
. D. Shafer, Chief
Emergency Prepare:' ness and
Radiological Protection Branch
Enclosures:
1.
Appendix, Exercise
Weakness
2.
Inspection Reports
No. 50-266/85012(DRSS);
No. 50-301/85012(DRSS)
cc w/ enclosures:
J. J. Zach, Plant Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Ness Flores, Chairperson
Wisconsin Public Service
Commission
W. Weaver, FEMA, Region V
D. Matthews, EPB, OIE
RI I
I
RIII
RI
ff nell/rr
Williamsen
B own
/ Jack'!w
e
p 10/03/85
-
-
- .
.
-
. ..
. . _ _ _
. ._ _
. _ .
_
__
_ _ _ _ . . _ _ _ _ . _ _
. _ .
_ _ _
_ _ _ _ _
-
, ..
l.
l
Appendix
EXERCISE WEAKNESS
,
'
Offsite notifications were not timely. On two occasions, the Notification of
Unusual Event and the General Emergency declaration, the licensee was unable
to complete the notifications within the prescribed 15-minute time limit.
For
the Unusual Event the licensee required 25 minutes to complete the notification
,
i
(see Paragraph 4.a) and for the General Emergency, 20 minutes were required
i
(see Paragraph 4.d.).
This exercise weakness will be tracked as Open Item
!
Nos. 266/85012-01 and 301/85012-01.
,