ML20133E764
| ML20133E764 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 07/01/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dixon O SOUTH CAROLINA ELECTRIC & GAS CO. |
| References | |
| NUDOCS 8508080010 | |
| Download: ML20133E764 (1) | |
Text
(k0 JUll l
South Carolina Electric and Gas Company ATTN: Mr. O. W. Dixon, Jr.
Vice President, Nuclear Operations P. O. Box 764 (167)
Columbia, SC 29218 Gentlemen:
SUBJECT:
COMPENSATORY ACTIONS FOR 10 CFR 50 APPENDIX R DISCREPANCIES SUMMER NUCLEAR FACILITY - DOCKET NO. 50-395 Thank you for your letter of June 21, 1985, informing us of the measures you propose to establish at the Summer facility to compensate for the identified Appendix R discrepancies.
It is our understanding that you will initiate, no later than July 5, 1985, a special roving fire watch surveillance patrol every two hours for each accessible fire zone which contains identified Appendix R cable interaction discrepancies. This fire watch patrol is to be maintained until the Appendix R modifications are complete or your interim procedures are l
reviewed and approved'by NRR.
Your cooperation with us in this matter is appreciated.
Should you have further questions concerning this letter, we will be glad to discuss them with you.
l Sincerely, j
S David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc:
- 0. S. Bradham, Director, Nuclear Plant Operations B..G. Croley, Group Manager Technical & Support Services D. A. Lavigne, Associate Manager, QA J. B. Knotts, Jr.
bec:.NRC Resident Inspector Document Control Desk State of South Carolina V. Benaroya, NRR/CHEB
- 0. Parr, NRR/ASB',
J. Hopkins, NRR/LB4 A. R. Herdt F. Cantrell W. Miller T..Conlon.
P. Madden' RII RII RII O WMit' s
TEConlon ARHerdt 06/n/85 06/ 1/85 06/g85
$80BOOg Q Q g.
F PDR
_rEOl r/o