- . _ - _ - . - - - . - - . - . - - - - _ .
. - - - . - . - . -
(blI
s
TE -O/
,
.
January 3,1997
r
Mr. H. G. Stanley
Site Vice President
!
Braidwood Station
-
l
Commonwealth Edison Company
l
RR #1. Box 84
Braceville. IL 60407
SUBJECT:
NRC INSPECTION REPORT 50-456/96014; 50-457/96014
Dear Mr. Stanley:
On October 18. 1996, the NRC completed an inspection at your Braidwood 1 & 2
reactor facilities. The enclosed report presents the results of that
inspection.
Overall, we found that plant operations were conducted safely.
We are concerned about two incidents of poor performance by non-licensed
operators that resulted in equipment damage to the 1C condensate booster pump
i
!
and spraying about 150 gallons of water into the diesel generator fuel oil
!
tank room.
These events indicated a failure to properly control evolutions in
i
the field. We are also concerned that NRC inspectors identified that the
l
latest revision of a surveillance procedure was not used when performing the
surveillance on the 1B Diesel Generator which was a violation of NRC
requirements.
The violation is cited in the enclosed Notice of Violation, and the
circumstances surrounding the violation is described in detail in the enclosed
report.
Please note that you are required to respond to this letter and
should follow the instructions specified :.1 the enclosed Notice when preparing
your response.
The NRC will use your response, in part, to determine whether
further enforcement action is necessary to ensure compliance with regulatory
requirements.
With respect to your temporary alteration process, while we recognize that you
have made some recent progress in reducing the number of temporary alterations
in use at the plant we are concerned with the high number that have been in
place for greater than 18 months.
Management controls to ensure that non-
conforming plant problems are permanently fixed in a timely manner have not
been effective in these instances.
[30010
I
\\
\\
9701130142 970103
ADOCK 05000456
G
.-.
.
..
-
--
. , -
.
,_.
.
.--
__
_
. _ .
-
.-
H. J. Stanley
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a cop.y of
this letter and the enclosures will be placed in the NRC Public Document Room
,
(PDR).
Sincerely.
-
1
/s/ James L. Caldwell
James L. Caldwell. Director
Division of Reactor Projects
Docket Nos:
50-456. 50-457
License Nos:
Enclosures:
i
'
Inspection Report 50-456/96014; 50-457/96014
cc w/ encl:
T. J. Maiman. Senior Vice President
Nuclear Operations Division
D, A. Sager. Vice President.
<
Generation Su] port
H. W. Keiser. C11ef Nuclear
Operating Officer
T. Tulon. Station Manager
T. Simpkin. Regulatory
Assurance Supervisor
I. Johnson. Acting Nuclear
Regulatory Services Manager
Richard Hubbard
Nathan Schloss. Economist
Office of the Attorney General
J
State Liaison Officer
Chairman. Illinois Commerce
Commission
Document Control Desk-Licensing
.
)
Distribution
Docket File w/ encl
DRP w/ enc 1
OC/LFDCB w/ encl
RIII PRR w/ encl
PUBLIC IE-01 w/ encl
CAA1 w/ encl (E-mail)
SRI Byron. Braidwood. Zion w/ encl
B. L. Burgess, w/ encl
Project Mgr.. NRR w/ encl
A. B. Beach, w/ encl
RAC1 (E-Mail)
W. L. Axelson, w/ encl
SEE ATTACHED CONCURRENCES
Document:
R:\\ ins
receive a copy of this grpts\\ powers \\ bra 1\\ bra 96014.drp
ument indicate in the box "C" = Copy without attach /enci "E" = Copy with attach / encl
"N* =
OFFICE
RIII
RIII
RIII
RIII
NAME
Tongue /sn
Gardner Sec
Lanksbury
Caldwell
M2.1 & E2.1
DATE
'2/ /96
12/
/96
12/ /96
12/ /96
0FFICIAL RECORD COPY
-
.-
H. J. Stanley
-2-
4
'
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and the enclosures will be placed in the NRC Public Document Room
(PDR).
Sincerely,
James L. Caldwell, Director
Division of Reactor Projects
Docket Nos:
50-456, 50-457
Enclosures: Notice of Violation
Inspection Report 50-456/96014; 50-457/96014
cc w/ encl:
D. A. Sager, Vice President,
Generation Support
H. W. Keiser, Chief Nuclear
Operating Officer
T. Tulon, Station Manager
T. Simpkin, Regulatory
Assurance Supervisor
I. Johnson, Acting Nuclear
Regulatory Services Manager
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce
Commission
Document Control Desk-Licensing
Distribution
Docket File w/ encl
DRP w/enci
OC/LFDCB w/ encl
RIII PRR w/ enc 1
PUBLIC IE-01 w/ encl
CAA1 w/ encl (E-mail)
SRI Byron, Braidwood, Zion w/ enc 1
B. L. Burgess w/ encl
Project Mgr., NRR w/ enc 1
A. B. Beach w/ enc 1
RAC (E-mail) w enc 1
W. L. Axelson w/ enc 1
g g i .. ,.,\\insprpts\\ powers \\.brai\\. bra 96014.drp
Document:
R:
ini. - . Swi.. . i tw w c . c ,..
.ti...f.
i e - c.,,
iin .ti.../
i
n-
0FFICE
RIII
8
RIII
6
RIII
A)
RIJI o /)
eb
NAME
Tongue /sn
nr
Lanksug
1
H 96
12/n /96
12/li/96
N/3 /9M
'
DATE
12/
/
0FFICIAL RECORD COPY