Forwards Insp Repts 50-456/96-14 & 50-457/96-14 on 960907-1018 & NOV
ML20133E759
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 01/03/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
Shared Package
ML20133E763 List:
References
NUDOCS 9701130142
Download: ML20133E759 (3)


See also: IR 05000456/1996014

Text

-. -- - . _ - _ - . - - - . - - . - . - - - - _ . . - - - . - . - . -

s (blI

.

, TE -O/

January 3,1997

r

Mr. H. G. Stanley

Site Vice President

! Braidwood Station -

l Commonwealth Edison Company

l RR #1. Box 84

Braceville. IL 60407

SUBJECT: NRC INSPECTION REPORT 50-456/96014; 50-457/96014  :

NOTICE OF VIOLATION

Dear Mr. Stanley:

On October 18. 1996, the NRC completed an inspection at your Braidwood 1 & 2

reactor facilities. The enclosed report presents the results of that

inspection. Overall, we found that plant operations were conducted safely.

We are concerned about two incidents of poor performance by non-licensed

operators that resulted in equipment damage to the 1C condensate booster pump i

! and spraying about 150 gallons of water into the diesel generator fuel oil l

! tank room. These events indicated a failure to properly control evolutions in i

l

the field. We are also concerned that NRC inspectors identified that the

latest revision of a surveillance procedure was not used when performing the

surveillance on the 1B Diesel Generator which was a violation of NRC I

requirements.

The violation is cited in the enclosed Notice of Violation, and the

circumstances surrounding the violation is described in detail in the enclosed

report. Please note that you are required to respond to this letter and

should follow the instructions specified :.1 the enclosed Notice when preparing

your response. The NRC will use your response, in part, to determine whether

further enforcement action is necessary to ensure compliance with regulatory

requirements.

With respect to your temporary alteration process, while we recognize that you I

have made some recent progress in reducing the number of temporary alterations

in use at the plant we are concerned with the high number that have been in

place for greater than 18 months. Management controls to ensure that non-

conforming plant problems are permanently fixed in a timely manner have not

been effective in these instances.

[30010

1

I

\ \

9701130142 970103

PDR ADOCK 05000456

G PDR

-- ,_. .

.-- __ _ . _ .

-

l

1

.-

H. J. Stanley -2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a cop.y of

, this letter and the enclosures will be placed in the NRC Public Document Room

(PDR). I

-

Sincerely. l

/s/ James L. Caldwell 1

James L. Caldwell. Director

Division of Reactor Projects l

l

Docket Nos: 50-456. 50-457

License Nos: NPF-72. NPF-77

'

i Enclosures: Notice of Violation

Inspection Report 50-456/96014; 50-457/96014

cc w/ encl: T. J. Maiman. Senior Vice President l

Nuclear Operations Division

<

D, A. Sager. Vice President.

Generation Su] port

H. W. Keiser. C11ef Nuclear

Operating Officer l

T. Tulon. Station Manager

T. Simpkin. Regulatory

Assurance Supervisor

I. Johnson. Acting Nuclear

Regulatory Services Manager

Richard Hubbard

Nathan Schloss. Economist

Office of the Attorney General

J

State Liaison Officer

Chairman. Illinois Commerce

Commission

Document Control Desk-Licensing

. 1

) Distribution

Docket File w/ encl DRP w/ enc 1

OC/LFDCB w/ encl RIII PRR w/ encl

PUBLIC IE-01 w/ encl CAA1 w/ encl (E-mail)

SRI Byron. Braidwood. Zion w/ encl B. L. Burgess, w/ encl

Project Mgr.. NRR w/ encl A. B. Beach, w/ encl

RAC1 (E-Mail) W. L. Axelson, w/ encl

SEE ATTACHED CONCURRENCES

Document: R:\ ins

receive a copy of this grpts\ powers \ bra 1\ bra 96014.drp

ument indicate in the box "C" = Copy without attach /enci "E" = Copy with attach / encl "N* =

OFFICE RIII RIII RIII RIII

NAME Tongue /sn Gardner Sec Lanksbury Caldwell

M2.1 & E2.1

DATE '2/ /96 12/ /96 12/ /96 12/ /96

0FFICIAL RECORD COPY

l

-

l

.-

H. J. Stanley -2- )

4

'

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and the enclosures will be placed in the NRC Public Document Room

(PDR).

Sincerely,

i

James L. Caldwell, Director

Division of Reactor Projects l

Docket Nos: 50-456, 50-457

License Nos: NPF-72, NPF-77

Enclosures: Notice of Violation

Inspection Report 50-456/96014; 50-457/96014

cc w/ encl: D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

T. Tulon, Station Manager

T. Simpkin, Regulatory

Assurance Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

Commission

Document Control Desk-Licensing

Distribution

Docket File w/ encl DRP w/enci

OC/LFDCB w/ encl RIII PRR w/ enc 1

PUBLIC IE-01 w/ encl CAA1 w/ encl (E-mail)

SRI Byron, Braidwood, Zion w/ enc 1 B. L. Burgess w/ encl

Project Mgr., NRR w/ enc 1 A. B. Beach w/ enc 1

RAC (E-mail) w enc 1 W. L. Axelson w/ enc 1

Document: R:

g g i .. ,.,\insprpts\

ini. - powers

. Swi.. . i\.brai\.

tw w c . bra

c ,..96014.drp .ti...f. i e - c.,, iin .ti.../ i n-

0FFICE RIII 8 RIII 6 RIII A) RIJI o /)

NAME Tongue /sn nr eb Lanksug 1

'

DATE 12/ H /96 12/n /96 12/li/96 N/3 /9M

0FFICIAL RECORD COPY