Forwards Insp Repts 50-348/85-25 & 50-364/85-25 on 850603-07 & Notice of Violation
ML20133E729
Person / Time
Site: Farley  
Issue date: 07/18/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20133E731 List:
References
NUDOCS 8508080002
Download: ML20133E729 (2)


See also: IR 05000348/1985025

Text

m

'gl6W

'

-

.

. .

July 18,1985

g/Ahabama Power Company.

ATTN: Mr. R. P. Mcdonald

Senior Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/85-25 AND 50-364/85-25

On June 3-7, 1985, NRC inspected activities authorized by NRC Operating License

Nos. NPF-2 and NPF-8 for your Farley facility. At the conclusion of the inspec-

tion, the findings were discussed with those members of your staff identified in

the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments.

The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original Signed by)

Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

Inspection Report Nos. 50-348/85-25

and 50-364/85-25

cc w/encls:

(See page 2)

'

8508080002 850718

"

PDR

ADOCK 05000348

0

PM

t

$Gol L

.

.

Alabama Power Company

2

July 18, 1985

w/encls:

0. Whitt, Executive Vice President

D. Woodard, Plant Manager

. G. Hairston, III, Manager, Nuclear

Engineering and Technical Support

d W. McGowan, Manager-Safety Audit

M.andEngineeringReview

O. Thrash, Manager, Nuclear Operations

M.andAdministration

G. Ware, Supervisor-Safety Audit

and Engineering Review

bec w/encls:

Document Control Desk

State of Alabama

~ $ C Resident. Inspector

g . Reeves, Project Manager, NRR

' RII

RII

RII

RI

RII

RII

W

ff

dit &

)4V

1

MFRunyan:es

MUpright

C

ian

A ibson FSchntrell

DMVefrelli

7/85/85

7//p85

7//5/85

7/i#/8s

7/f //8s

7/f/85

f