ML20133E688

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-373/85-24 & 50-374/85-25 on 850725-0906 & Notice of Violation
ML20133E688
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/27/1985
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20133E690 List:
References
NUDOCS 8510090494
Download: ML20133E688 (2)


See also: IR 05000373/1985024

Text

.

. _ _ _ _ .

__

- _ . _ _

_.

_

_

_

'

'

h m Pe

.

4

SEP 2 7 WS

i

Docket No. 50-373

'

Docket No. 50-374

l

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

,

This refers to the routine safety inspection conducted by Messrs. M. Jordan,

J. Bjorgen, A. Morrongiello, and R. Kopriva of this office on July 25 through

September 6, 1985, of activities at LaSalle County Station, Units 1 and 2,

authorized by Operating Licenses No. NPF-11 and No. NPF-18 and to the

discussion of our findings with Mr. R. D. Bishop at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

'

of NRC requirements, as specified in the enclosed Appendix.

A written

i

response is required.

In Section 11 of this report is an open item concerning

closure of an Engineering Change Notice (ECN) with reference sketches not

incorporated into drawings.

You are requested to include in your response to

)

the attached Notice of Violation, the means by which you document closure of

any ECN's with reference sketches to assure that the entire ECN action is

documented as to what drawing changes should be accomplished and what drawing

changes need not be accomplished.

In accordance with 10 CFR 2.790(a) of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

,

The responses directed by this letter (and the accompanying Notice) are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

9510090494 850927

PDR

ADOCK 05000373

0

PDR

j

7 E <^/

/

-..

-

-

-__ _

-__. . . - - - _ . - .

. - .

, - - - - - - _ - - - - - - - . . .

_

_ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _

-

,

.

.

I

.

Commonwealth Edison Company

2

-

gp p 7 yyg

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

$0rigir:al sist.;d cy C.E. tiorclius"

Charles E. Norelius, Director

Division of Reactor Projects

Enclosures:

1. Appendix, Notice

of Violation

2. Inspection Reports

No. 50-373/85024(DRr)

No. 50-374/85025(D'sP)

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

G. J. Diederich, Plant

Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

RIII

RIII

RIII

W

h /jp

Ct

otimos

N

us

$$

09/23/85

6

_

_ _ _ _ _ _ _ _ _