including for each violation.
(1) the reason for the violations if admitted, (2) the corrective steps wh1 have been taken and the results achieved.
(3) the corrective steps whits will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
Dated at Arlington, Texas, this 12th day of September,1985.
1 1
)
1 i
I
(
i 00 hg pp G
2 Items; (4) Plant Tours; and (5) Plant Status. The inspection involved 96 inspector-hours onsite by two NRC inspectors.
Results: Within the five areas inspected, one violation was identified (failure to provide an adequate procedure, paragraph 3).
In addition, three new open items were identified in paragraphs 2 and 3.
l I
i l
i l
1