Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-424/85-06 & 50-425/85-06.Violation Not Completely Addressed.Assessment of Licensee Response Re as-built Condition of Supports Encl
ML20133D402
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/16/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8507220193
Download: ML20133D402 (3)


See also: IR 05000424/1985006

Text

ell0th

.

MAY 161985

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

,

Gentlemen:

SUBJECT:

REPORT NCS. 50-424/85-06 AND 50-425/85-06

Thank you for your response af April 16, 1985, responding to our Notice of

Violation issued March 18, 1985, concerning activities conducted under NRC

Construction Permit Nos. CPPR-108 and CPPR-109 at your Vogtle facility. We have

evaluated your response and found that it meets the requirements of 10 CrR 2.201

to the extent that your response acknowledged the violation. We have carefully

considered thp basis for your evaluation, and,for the reasons presented in the

enclosure to this letter, we have concluded that the violation was not completely

addressed.

Therefore, in accordance with 10 CFR 2.201(a), please submit to this office

within 30 days of the date of this letter a written statement describing steps

which have been taken to correct the violation and the results achieved,

corrective steps which will be taken to aboid further violations, and the date

when full compliance will be achieved.

It should be noted, that the Bechtel Power Specification No. X4AZ01, Division PS,

should be Section 5.9.3, not Section 5.9.2 as indicated in the violation.

We appreciate your cooperation in this matter.

Sincerely,

S\\

J. Nelson Grace

Regional Administrator

Enclosure:

Staff Assessment of Licensee Response

cc w/ encl:

R. E. Con n y, Senior Vice President

Nuclear Power

D, O. Foster, Vice President

and General Manager Vogtle Project

H. H. Gregory, III, General

Manager, Vogtle Nuclear Construction

G. Bockhold, Jr. , Vogtle

Plant Manager

(cc cont'd - see page 2)

0507220193 850516

PDR

ADOCK 05000424

a

PDR

-

35 0 l

\\

\\

.

Georgia Power Company

2

MAY 161985

(cc cont'd)

L. T. Gucwa, Chief

Nuclear Engineer

Ruble A. Thomas,

Vice President-Licensing Vogtle

Project

Ed Groover, Quality

Assurance Site Manager

C. W. Hayes, QA Manager

-

J. T. Beckham, V1ce President

& General Manager - Operations

J. A. Bailey, Project Licensing

Manager

George F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge

Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge

Ernest L. Blake, Jr., Esq.

Shaw, Pittman, Potts and Trowbridge

James E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

James G. Ledbetter, Commissioner

Department of Human Resources

Charles H. Badger, Office of

Planning and Budget, Management

Review Division

Deppish Kirkland, III, Counsel

Office of the Consumer's Utility

Council

Douglas C. Teper, Georgians Against

Nuclear Energy

Laurie Fowler, Legal Environmental

Assistance Foundation

Tim Johnson, Executive Director

Educational Campaign for a Prosperous

Georgia

Morton B. Margulies, Esq., Chairman

Administrative Judge, Atomic Safety

and Licensing Board Panel

Dr. Oscar H. Paris, Administrative Judge

Atomic Safety and Licensing Board Panel

Gustave A. Linenberger, Jr., Administrative

Judge, Atomic Safety and Licensing Board

Panel

bec w/ encl:

E. Reise, ELD

M. Sinkule, RII

NRC Resident Inspector

Document Control Desk

State of Georgia

f

RII

RI

RII

RI

RII

RI

.g

ias:sa

Blake

dt

PBemis

VBrownlee

Mbiker

ins J

shinski

g/d

/7 /85

5/9/8E

5/y /85

5/ 1 /85

5/g/85

5/1 /85

5/j

85

5/

85

..

.

ENCLOSURE

STAFF ASSESSMENT OF LICENSEE RESPONSE

The Notice of Violation addresses the requirement for the establishment of

measures to assure required documentation reflects "as-built" conditions of

supports so that a proper evaluation by the design engineers can be performed.

The installation-of filler plates in conjunction with pipe straps involves adding

a plate and welds which are subjected to tensile and shear forces. Neither the

welds nor the structural plate are addressed or documented in the final as-built

drawings or calculations.

It is our position that the filler plates used in pipe supports do nat come under

the tolerance criteria of paragraph P5.6.4 of Bechtel's specification X4AZ01 for

the modifications of the supports.

They are additional load bearing members

which should be acknowledged by the pipe support design engineers.

Therefore, for reasons stated above, documentation of pipe support filler plates

is required to complete the as-built support drawings and calculations.

.

,

-

,

-

,-

- - - , , , . -

-